Waitārere Beach Road Curves
Work on the Waitārere Beach Road Curves Realignment project ceased in 2017, following community feedback and in order to align with the overall Ōtaki to north of Levin project.
The current SH1 Levin to Foxton safety improvements project was developed more recently, with close community engagement. There are currently no plans to proceed with the original Waitārere Beach Road Curves Realignment project.
More information on the original proposal for the Waitārere Beach Road Curves Realignment is available below.
Vol I Assessment of environmental effects
Vol II Technical reports
- Appendix A Standard Terms and Glossary [PDF, 1.1 MB]
- Appendix B Transport Report [PDF, 2.9 MB]
- Appendix C Stormwater Design Report [PDF, 5.5 MB]
- Appendix D Erosion and Sediment Control [PDF, 4.1 MB]
- Appendix E Archaeological & Heritage Assessment [PDF, 38 MB]
- Appendix F Preliminary Geotechnical Assessment [PDF, 1.5 MB]
- Appendix G Ecological Assessment Report [PDF, 7.7 MB]
- Appendix H Landscape and Visual Assessment [PDF, 6.5 MB]
- Appendix I Acoustic Assessment Report [PDF, 16 MB]
- Appendix J Alternatives Assessment Report [PDF, 1.9 MB]
- Appendix K Assessment of economic effects [PDF, 1001 KB]
- Appendix L Previous Reports List [PDF, 1.3 MB]
- Appendix M Cultural Impact Assessment [PDF, 2.2 MB]
Vol III Plan sets
- Plan Set A – Index [PDF, 3.2 MB]
- Plan Set B – Designation Plan [PDF, 2.3 MB]
- Plan Set C – Land requirement Plans [PDF, 1.1 MB]
- Plan Set D – Layout Plans [PDF, 2.7 MB]
- Plan Set E – General Arrangement Plans [PDF, 5 MB]
- Plan Set F – Poroutawhao School Works Plan [PDF, 1.4 MB]
- Plan Set G – Sediment Control Plans [PDF, 2.1 MB]
- Plan Set H – Drainage Layout Plan [PDF, 3.2 MB]
- Plan Set I – Landscape Context Plan [PDF, 3.4 MB]
- Plan Set J – Typical Cross Section [PDF, 984 KB]
- Plan Set K – Cross Sections [PDF, 5.7 MB]