This section presents the key aspects of the NLTP for the West Coast region. It sets out the key statistic of transport in the region and presents tables of the new National Land Transport Programme (NLTP) appropriate to the region.
Region |
New Zealand
|
Region as % of NZ
| |
---|---|---|---|
Population | 32,000 |
4,228,000
|
1%
|
Land area (km2) | 23,336 |
275,446
|
8%
|
Imports (gross tonne)1, 2 | 800,000 |
76,000,000
|
1%
|
Exports (gross tonne)1, 2 | 2,400,000 |
67,000,000
|
4%
|
Gross Domestic Product (GDP) ($) | 1,109,400,000 |
163,387,000,000
|
1%
|
Passenger Transport - Bus - boardings | 44,884 |
89,683,159
|
0%
|
Passenger Transport - Rail - boardings | - |
16,913,205
|
|
Passenger Transport - Ferry - boardings | - |
4,224,398
|
|
Motor vehicles | 23,000 |
2,850,000
|
1%
|
VKT (km) | 463,900,000 |
39,845,600,000
|
1%
|
Fatalities on the roads | 6 |
423
|
1%
|
Fatal and injury crashes on the roads | 123 |
12,047
|
1%
|
Local roads - urban all (km) | 286 |
17,251
|
2%
|
Local roads - urban sealed (km) | 263 |
16,869
|
2%
|
Local roads - rural all (km) | 1,611 |
65,432
|
2%
|
Local roads - rural sealed (km) | 788 |
33,432
|
2%
|
State Highway - all (km) | 872 |
10,893
|
8%
|
State Highway - sealed (km) | 872 |
10,837
|
8%
|
State Highway - motorway (km) | - |
172
|
|
Data based on 2006/07 figures
1 Crude indicaton only - based on a ratio determined in 2002 by BAH between inter-national and inter-regional freight movements.
2 Includes both inter-national and inter-regional freight movement.
« Return to NLTP 2008 table of contents
Phase | Profile | Status | Expected start year | Work category | FAR | Total phase cost ($000) | Total cost 2008/09 ($000) | 2008/09 NLTA ($000) |
Indicative funding source
| |
---|---|---|---|---|---|---|---|---|---|---|
Buller District Council | ||||||||||
Maintenance and operation of local roads | ||||||||||
Routine maintenance | App | 2008/09 | 1,829.5 | 1,829.5 | 1,098.5 |
N
|
||||
Renewal of local roads | ||||||||||
Periodic maintenance | App | 2008/09 | 1,025.4 | 1,025.4 | 615.2 |
N
|
||||
Preventive maintenance | ||||||||||
Lyell Half Bridge | C | Cat 2 | 2008/09 | 241 | 100.0 | 100.0 |
N
|
|||
Improvement of local roads | ||||||||||
New road infrastructure | ||||||||||
Rough River Bridge | D | Cat 2 | 2008/09 | 322 | 250.0 | 250.0 |
N
|
|||
Atarau Road | C | Cat 2 | 2008/09 | 324 | 475.0 | 356.3 |
N
|
|||
Rough River Bridge | C | Res | 2010/11 | 322 | 2,500.0 | - |
|
|||
Minor improvements | ||||||||||
Minor improvements allocation | App | 2008/09 | 341 | 70 | 228.4 | 228.4 | 159.9 |
N
|
||
Use of the land transport system | ||||||||||
Community focused activities | ||||||||||
Road Safety Programme | I | HMM | App | 2008/09 | 432 | 75 | 16.0 | 16.0 | 12.0 |
N
|
Passenger transport | ||||||||||
Services and operations | ||||||||||
Bus & ferry concession fares | App | 2008/09 | 513 | 50 | 34.0 | 34.0 | 17.0 |
N
|
||
Administration | ||||||||||
Territorial | ||||||||||
Administration support 2008/09 | App | 2008/09 | 621 | - | - | 42.4 |
N
|
|||
Buller District Council SPR | ||||||||||
Maintenance and operation of local roads | ||||||||||
Routine maintenance | App | 2008/09 | 354.3 | 354.3 | 354.3 |
N
|
||||
Renewal of local roads | ||||||||||
Periodic maintenance | App | 2008/09 | 220.6 | 220.6 | 220.6 |
N
|
||||
Improvement of local roads | ||||||||||
Minor improvements | ||||||||||
Minor improvements allocation | App | 2008/09 | 341 | 100 | 46.0 | 46.0 | 46.0 |
N
|
||
Administration | ||||||||||
Territorial | ||||||||||
Administration support 2008/09 | App | 2008/09 | 621 | - | - | 14.0 |
N
|
|||
DOC (Hokitika) | ||||||||||
New road infrastructure | ||||||||||
Fox Glacier North Access Road Seal Extension | C | Cat 2 | 2008/09 | 325 | 790.0 | 790.0 |
N/R
|
|||
Franz Josef Glacier Access Road Seal Extension | C | Cat 2 | 2008/09 | 325 | 910.0 | 910.0 |
N/R
|
|||
Road studies | ||||||||||
Fox Glacier North Road - Undercite Slip Monitoring | S | MMM | Com | 2007/08 | 311 | 100 | 17.5 | 4.0 | 4.0 |
N
|
Use of the land transport system | ||||||||||
Walking and cycling | ||||||||||
Glacier Access Roads - Pedestrian & Cycle Access | C | HMM | Com | 2008/09 | 452 | 100 | 784.3 | 784.3 | 500.0 |
R-WST
|
Administration | ||||||||||
Territorial | ||||||||||
Administration support 2008/09 | App | 2008/09 | 621 | - | - | 0.1 |
N
|
|||
DOC (Hokitika) SPR | ||||||||||
Maintenance and operation of local roads | ||||||||||
Routine maintenance | App | 2008/09 | 227.0 | 227.0 | 227.0 |
N
|
||||
Improvement of local roads | ||||||||||
Minor improvements | ||||||||||
Minor improvements allocation | App | 2008/09 | 341 | 100 | 18.2 | 18.2 | 18.2 |
N
|
||
Administration | ||||||||||
Territorial | ||||||||||
Administration support 2008/09 | App | 2008/09 | 621 | - | - | 5.5 |
N
|
|||
Grey District Council | ||||||||||
Maintenance and operation of local roads | ||||||||||
Routine maintenance | App | 2008/09 | 1,690.7 | 1,690.7 | 1,054.6 |
N
|
||||
Renewal of local roads | ||||||||||
Periodic maintenance | App | 2008/09 | 2,367.7 | 2,367.7 | 1,467.9 |
N
|
||||
Improvement of local roads | ||||||||||
New road infrastructure | ||||||||||
Atarau Road strenghtening/widening package | C | HMH | Com | 2007/08 | 324 | 72 | 850.0 | 414.0 | 298.1 |
N
|
Taylorville - Blackball Road Strengthening/widening package | C | MMH | Com | 2007/08 | 324 | 72 | 1,104.0 | 552.0 | 397.4 |
N
|
Camp Creek Bridge Replacement | C | Cat 2 | 2008/09 | 322 | 326.2 | 326.2 |
N/R
|
|||
Moonlight Bridge Strengthening | C | Cat 2 | 2008/09 | 322 | 568.0 | 568.0 |
R*
|
|||
Taylorville Blackball and Atarau Road Slow Vehicle lanes | C | Cat 2 | 2008/09 | 324 | 356.0 | 114.0 |
N/R
|
|||
Minor improvements | ||||||||||
Minor improvements allocation | App | 2008/09 | 341 | 72 | 324.7 | 324.7 | 233.8 |
N
|
||
Use of the land transport system | ||||||||||
Community focused activities | ||||||||||
Grey District Community Road Safety | I | HMM | App | 2008/09 | 432 | 75 | 27.0 | 27.0 | 20.3 |
N
|
Administration | ||||||||||
Territorial | ||||||||||
Administration support 2008/09 | App | 2008/09 | 621 | - | - | 78.1 |
N
|
|||
West Coast Regional Council | ||||||||||
Use of the land transport system | ||||||||||
Community focused activities | ||||||||||
Community Co-ordinator 08-09 | I | HHH | App | 2008/09 | 431 | 75 | 40.0 | 40.0 | 30.0 |
N
|
Community Programmes 08-09 | I | HMH | App | 2008/09 | 432 | 75 | 7.5 | 7.5 | 5.6 |
N
|
Passenger transport | ||||||||||
Services and operations | ||||||||||
Total mobility services | App | 2008/09 | 517 | 40 | 67.0 | 67.0 | 26.8 |
N
|
||
Administration | ||||||||||
Regional | ||||||||||
RLTP administration | App | 2008/09 | 631 | - | - | 67.1 |
N
|
|||
Passenger Transport administration | App | 2008/09 | 632 | 50 | 8.0 | 8.0 | 4.0 |
N
|
||
Total Mobility administration | App | 2008/09 | 633 | 25 | 18.0 | 18.0 | 4.5 |
N
|
||
Westland District Council | ||||||||||
Maintenance and operation of local roads | ||||||||||
Routine maintenance | App | 2008/09 | 1,659.0 | 1,659.0 | 980.9 |
N
|
||||
Renewal of local roads | ||||||||||
Periodic maintenance | App | 2008/09 | 1,198.0 | 1,198.0 | 706.8 |
N
|
||||
Improvement of local roads | ||||||||||
Minor improvements | ||||||||||
Minor improvements allocation | App | 2008/09 | 341 | 69 | 228.6 | 228.6 | 157.7 |
N
|
||
Use of the land transport system | ||||||||||
Community focused activities | ||||||||||
Community Focused Activities | I | HMM | App | 2008/09 | 432 | 75 | 14.0 | 14.0 | 10.5 |
N
|
Passenger transport | ||||||||||
Services and operations | ||||||||||
Bus & ferry concession fares | App | 2008/09 | 513 | 50 | 19.0 | 19.0 | 9.5 |
N
|
||
Administration | ||||||||||
Territorial | ||||||||||
Administration support 2008/09 | App | 2008/09 | 621 | - | - | 41.8 |
N
|
|||
Westland District Council SPR | ||||||||||
Maintenance and operation of local roads | ||||||||||
Routine maintenance | App | 2008/09 | 285.0 | 285.0 | 285.0 |
N
|
||||
Renewal of local roads | ||||||||||
Periodic maintenance | App | 2008/09 | 199.0 | 199.0 | 199.0 |
N
|
||||
Improvement of local roads | ||||||||||
Minor improvements | ||||||||||
Minor improvements allocation | App | 2008/09 | 341 | 100 | 38.7 | 38.7 | 38.7 |
N
|
||
Administration | ||||||||||
Territorial | ||||||||||
Administration support 2008/09 | App | 2008/09 | 621 | - | - | 11.8 |
N
|
|||
Transit - West Coast | ||||||||||
Maintenance and operation of state highways | ||||||||||
Routine maintenance | App | 2008/09 | 100 | 11,811.0 | 11,811.0 | 11,811.0 |
N
|
|||
Renewal of state highways | ||||||||||
Periodic maintenance | App | 2008/09 | 100 | 5,792.1 | 5,792.1 | 5,792.1 |
N
|
|||
Improvement of state highways | ||||||||||
New road infrastructure | ||||||||||
Arahura BR | C | Com | 2007/08 | 322 | 100 | 22,700.0 | 9,700.0 | 9,700.0 |
N
|
|
Gates of Haast Realign | I | Com | 2007/08 | 323 | 100 | 800.8 | 121.6 | 121.6 |
R-WST
|
|
Minor improvements | ||||||||||
Minor improvements allocation | App | 2008/09 | 341 | 100 | 1,452.1 | 1,452.1 | 1,452.1 |
N
|
||
Block programme | ||||||||||
Goat Creek Bridge Replacement | C | Cat 2 | 323 | 4,047.0 | 800.0 |
R*
|
||||
Buller Gorge Signals | C | Cat 2 | 324 | 424.0 | 424.0 |
N
|
||||
McKendries Corner Curve Improvements | C | Cat 2 | 324 | 1,000.0 | 100.0 |
R*
|
||||
Jacksons Junction Effluent Disposal | D | Cat 2 | 36.1 | 36.1 |
|
|||||
Strategic studies | ||||||||||
SH6 Route Security Study | S | Cat 2 | 311 | - | - | - |
N
|
|||
West Coast Passing Opportunities Study | S | Cat 2 | 311 | - | - | - |
N
|
|||
West Coast Walking and Cycling Strategy | S | Cat 2 | 311 | - | - | - |
N
|
« Return to NLTP 2008 table of contents
Project name |
FTE Staff
|
Funding ($000)
|
---|---|---|
Police district managed activities |
|
|
Network-wide strategic road policing - enhanced alcohol CBT project |
2.1
|
321.9
|
Network-wide strategic road policing - traffic camera operations |
1.0
|
155.8
|
Court orders |
0.1
|
20.8
|
Transit NZ |
|
|
Highway strategic road policing - Highway Patrol |
6.1
|
946.0
|
Buller, Grey and Westland Districts |
|
|
Highway strategic road policing |
4.2
|
659.4
|
Rural strategic road policing |
1.6
|
244.0
|
Urban strategic road policing |
4.1
|
638.6
|
Crash attendance and investigation |
3.4
|
534.8
|
Traffic management |
0.2
|
26.0
|
School road safety education |
0.3
|
46.7
|
Police community services |
0.2
|
36.3
|
Strategic road policing comprises the pro-active road policing activities of speed control, drinking or drugged driver control, restraint device control, and visible road safety and general enforcement.
Page updated: 25 June 2008