The Longswamp section of the Waikato Expressway links the Mercer section (just south of the Hampton Downs Interchange) to the Rangiriri section to the south. This project involved the upgrading of 5.9km of SH1 to full expressway standard. It was completed in 2020.
The Longswamp section: