This section presents the key aspects of the NLTP for the Marlborough/Nelson/Tasman region. It sets out the key statistic of transport in the region and presents tables of the new National Land Transport Programme (NLTP) appropriate to the region.
Region |
New Zealand
|
Region as % of NZ
| |
---|---|---|---|
Population | 134,000 |
4,228,000
|
3%
|
Land area (km2) | 22,715 |
275,446
|
8%
|
Imports (gross tonne)1, 2 | 4,600,000 |
76,000,000
|
6%
|
Exports (gross tonne)1, 2 | 4,800,000 |
67,000,000
|
7%
|
Gross Domestic Product (GDP) ($) | 4,619,600,000 |
163,387,000,000
|
3%
|
Passenger Transport - Bus - boardings | 50,580 |
89,683,159
|
0%
|
Passenger Transport - Rail - boardings | - |
16,913,205
|
|
Passenger Transport - Ferry - boardings | - |
4,224,398
|
|
Motor vehicles | 105,000 |
2,850,000
|
4%
|
VKT (km) | 1,331,500,000 |
39,845,600,000
|
3%
|
Fatalities on the roads | 10 |
423
|
2%
|
Fatal and injury crashes on the roads | 380 |
12,047
|
3%
|
Local roads - urban all (km) | 557 |
17,251
|
3%
|
Local roads - urban sealed (km) | 550 |
16,869
|
3%
|
Local roads - rural all (km) | 2,932 |
65,432
|
4%
|
Local roads - rural sealed (km) | 1,476 |
33,432
|
4%
|
State Highway - all (km) | 645 |
10,893
|
6%
|
State Highway - sealed (km) | 645 |
10,837
|
6%
|
State Highway - motorway (km) | - |
172
|
|
Data based on 2006/07 figures
1 Crude indicaton only - based on a ratio determined in 2002 by BAH between inter-national and inter-regional freight movements.
2 Includes both inter-national and inter-regional freight movement.
« Return to NLTP 2008 table of contents
Phase | Profile | Status | Expected start year | Work category | FAR | Total phase cost ($000) | Total cost 2008/09 ($000) | 2008/09 NLTA ($000) | Indicative funding source | |
---|---|---|---|---|---|---|---|---|---|---|
Marlborough District Council | ||||||||||
Maintenance and operation of local roads | ||||||||||
Routine maintenance | App | 2008/09 | 3,627.6 | 3,627.6 | 1,676.8 | N | ||||
Renewal of local roads | ||||||||||
Periodic maintenance | App | 2008/09 | 4,211.3 | 4,211.3 | 1,937.2 | N | ||||
Improvement of local roads | ||||||||||
New road infrastructure | ||||||||||
Bridge Replacement Programme 08/09 | C | Cat 2 | 2008/09 | 322 | 243.0 | 243.0 | R* | |||
Kaituna Tuamarina Rehabilitation 'R' Funded | C | Cat 2 | 2008/09 | 324 | 771.6 | 771.6 | N | |||
Northbank Road - Stage 6 | C | Cat 2 | 2008/09 | 324 | 300.0 | 300.0 | N/R | |||
Old Renwick Rd/ Jacksons Rd Intersection Upgrade | C | Cat 2 | 2008/09 | 324 | 640.0 | 640.0 | N/R | |||
Minor improvements | ||||||||||
Minor improvements allocation | App | 2008/09 | 341 | 56 | 627.1 | 627.1 | 351.2 | N | ||
Use of the land transport system | ||||||||||
Community focused activities | ||||||||||
Community Co-ordination | I | HHH | App | 2008/09 | 431 | 75 | 75.0 | 75.0 | 42.2 | N |
Safe Transport - Vehicle Users | I | HMH | App | 2008/09 | 432 | 75 | 55.0 | 55.0 | 41.3 | N |
Safe Transport -Vunerable Users | I | HMH | App | 2008/09 | 432 | 75 | 94.0 | 94.0 | 70.5 | N |
Sustainable Transport | I | HMH | App | 2008/09 | 432 | 75 | 47.0 | 47.0 | 35.3 | N |
Passenger transport | ||||||||||
Services and operations | ||||||||||
Bus services | App | 2008/09 | 511 | 50 | 130.0 | 130.0 | 65.0 | N | ||
Bus & ferry facilities maintenance and operations | App | 2008/09 | 514 | 60 | 2.0 | 2.0 | 1.2 | N | ||
Total mobility services | App | 2008/09 | 517 | 40 | 90.0 | 90.0 | 36.0 | N | ||
Total Mobility Flat Payments | App | 2008/09 | 521 | 100 | 18.0 | 18.0 | 18.0 | N | ||
Administration | ||||||||||
Regional | ||||||||||
RLTP administration | App | 2008/09 | 631 | - | - | 37.6 | N | |||
Passenger Transport administration | App | 2008/09 | 632 | 50 | 2.0 | 2.0 | 1.0 | N | ||
Total Mobility administration | App | 2008/09 | 633 | 25 | 12.0 | 12.0 | 3.0 | N | ||
Territorial | ||||||||||
Administration support 2008/09 | App | 2008/09 | 621 | - | - | 93.5 | N | |||
Marlborough District Council SPR | ||||||||||
Maintenance and operation of local roads | ||||||||||
Routine maintenance | App | 2008/09 | 29.0 | 29.0 | 29.0 | N | ||||
Renewal of local roads | ||||||||||
Periodic maintenance | App | 2008/09 | 1.0 | 1.0 | 1.0 | N | ||||
Improvement of local roads | ||||||||||
Minor improvements | ||||||||||
Minor improvements allocation | App | 2008/09 | 341 | 100 | 2.4 | 2.4 | 2.4 | N | ||
Administration | ||||||||||
Territorial | ||||||||||
Administration support 2008/09 | App | 2008/09 | 621 | - | - | 0.7 | N | |||
Nelson City Council | ||||||||||
Maintenance and operation of local roads | ||||||||||
Routine maintenance | App | 2008/09 | 2,391.5 | 2,391.5 | 1,028.3 | N | ||||
Renewal of local roads | ||||||||||
Periodic maintenance | App | 2008/09 | 1,225.0 | 1,225.0 | 526.8 | N | ||||
Preventive maintenance | ||||||||||
Retaining Wall Replacement Programme | C | Cat 2 | 2008/09 | 241 | 1,006.4 | 64.0 | N | |||
Improvement of local roads | ||||||||||
New road infrastructure | ||||||||||
Corridor Study Implementation (R Funded) | I | Cat 2 | 2008/09 | 324 | 21,300.0 | 300.0 | R* | |||
Marsden / Ridgeway Intersection | C | Cat 2 | 2008/09 | 324 | 710.0 | 710.0 | N/R | |||
Road studies | ||||||||||
Crash Reduction Studies | S | Cat 2 | 2008/09 | 311 | 20.0 | 20.0 | N | |||
Minor improvements | ||||||||||
Minor improvements allocation | App | 2008/09 | 341 | 53 | 289.3 | 289.3 | 153.3 | N | ||
Use of the land transport system | ||||||||||
Studies | ||||||||||
Corridor Study Model Update | S | Cat 2 | 2008/09 | 411 | 35.0 | 35.0 | N | |||
Traval Demand Outcomes from Corridor Study | S | Cat 2 | 2008/09 | 412 | 75.0 | 75.0 | N | |||
Walking and cycling | ||||||||||
Footpath Construction | C | HML | Com | 2006/07 | 451 | 53 | 1,336.0 | 358.0 | 189.7 | N |
NCC cycle strategy review and implementation (package) | C | Cat 2 | 452 | 840.0 | 840.0 | N/R | ||||
Community focused activities | ||||||||||
Road Safety and Travel planning co-ordination | I | HHH | App | 2008/09 | 431 | 75 | 125.0 | 125.0 | 93.8 | N |
Community road safety and sustainability projects | I | HMH | App | 2008/09 | 432 | 75 | 115.5 | 115.5 | 86.6 | N |
Passenger transport | ||||||||||
Services and operations | ||||||||||
Bus services | App | 2008/09 | 511 | 50 | 110.0 | 110.0 | 55.0 | N | ||
Bus & ferry concession fares | App | 2008/09 | 513 | 50 | 146.4 | 146.4 | 73.2 | N | ||
Bus & ferry facilities maintenance and operations | App | 2008/09 | 514 | 60 | 95.5 | 95.5 | 57.3 | N | ||
Total mobility services | App | 2008/09 | 517 | 40 | 205.3 | 205.3 | 82.1 | N | ||
Replacement wheelchair hoists | App | 2008/09 | 519 | 60 | 2.0 | 2.0 | 1.2 | N | ||
Total Mobility Flat Payments | App | 2008/09 | 521 | 100 | 48.9 | 48.9 | 48.9 | N | ||
Administration | ||||||||||
Regional | ||||||||||
RLTP administration | App | 2008/09 | 631 | - | - | 27.8 | N | |||
Passenger Transport administration | App | 2008/09 | 632 | 50 | 20.0 | 20.0 | 10.0 | N | ||
Total Mobility administration | App | 2008/09 | 633 | 25 | 60.0 | 60.0 | 15.0 | N | ||
Territorial | ||||||||||
Administration support 2008/09 | App | 2008/09 | 621 | - | - | 47.3 | N | |||
Tasman District Council | ||||||||||
Maintenance and operation of local roads | ||||||||||
Routine maintenance | App | 2008/09 | 4,301.0 | 4,301.0 | 2,107.5 | N | ||||
Renewal of local roads | ||||||||||
Periodic maintenance | App | 2008/09 | 6,623.0 | 6,623.0 | 3,245.3 | N | ||||
Preventive maintenance | ||||||||||
Preventive Maintenance - Carriageway Slumping | C | MMH | Com | 2007/08 | 241 | 49 | 104.0 | 53.0 | 26.0 | N |
Improvement of local roads | ||||||||||
New road infrastructure | ||||||||||
Advanced I and D Fees. 2008/09 | D | Cat 2 | 2008/09 | 324 | 150.0 | 150.0 | R* | |||
Paton Road Reconstruction - R FUNDING | C | Cat 2 | 2008/09 | 324 | 3,800.0 | 2,000.0 | N/R | |||
Pavement Smoothing | C | Cat 2 | 2008/09 | 324 | 114.1 | 114.1 | R* | |||
Talbot Street Salisbury Road Intersection | I | Cat 2 | 2008/09 | 324 | 300.0 | 300.0 | R* | |||
Bridge Valley Road Seal Extension Stage 2 | C | Cat 2 | 2008/09 | 325 | 111.7 | 111.7 | R* | |||
Minor improvements | ||||||||||
Minor improvements allocation | App | 2008/09 | 341 | 59 | 873.9 | 873.9 | 515.6 | N | ||
Use of the land transport system | ||||||||||
Walking and cycling | ||||||||||
Cycleways-Project Related | C | Cat 2 | 2008/09 | 452 | 211.4 | 211.4 | N/R | |||
Shared Use Path-School Rd to Community Rd | C | Cat 2 | 2008/09 | 452 | 171.7 | 171.7 | N/R | |||
Community focused activities | ||||||||||
Road Safety Coordination | I | HHH | App | 2008/09 | 431 | 75 | 124.5 | 124.5 | 93.4 | N |
Road Safety Activities and Programmes | I | HMH | App | 2008/09 | 432 | 75 | 91.0 | 91.0 | 68.3 | N |
Administration | ||||||||||
Territorial | ||||||||||
Administration support 2008/09 | App | 2008/09 | 621 | - | - | 136.3 | N | |||
Tasman District Council SPR | ||||||||||
Maintenance and operation of local roads | ||||||||||
Routine maintenance | App | 2008/09 | 89.0 | 89.0 | 89.0 | N | ||||
Renewal of local roads | ||||||||||
Periodic maintenance | App | 2008/09 | 54.0 | 54.0 | 54.0 | N | ||||
Improvement of local roads | ||||||||||
Minor improvements | ||||||||||
Minor improvements allocation | App | 2008/09 | 341 | 100 | 11.4 | 11.4 | 11.4 | N | ||
Administration | ||||||||||
Territorial | ||||||||||
Administration support 2008/09 | App | 2008/09 | 621 | - | - | 3.5 | N | |||
Transit - Nelson/Marlborough/Tasman | ||||||||||
Maintenance and operation of state highways | ||||||||||
Routine maintenance | App | 2008/09 | 100 | 11,294.3 | 11,294.3 | 11,294.3 | N | |||
Emergency works | ||||||||||
E/Works 07/08 Tasman | C | Com | 2007/08 | 141 | 100 | 1,245.0 | 763.0 | 763.0 | N | |
E/Works Eureka Bend 10.91 | C | Com | 2006/07 | 141 | 100 | 2,300.0 | 1,450.7 | 1,450.7 | N | |
Renewal of state highways | ||||||||||
Periodic maintenance | App | 2008/09 | 100 | 8,149.4 | 8,149.4 | 8,149.4 | N | |||
Improvement of state highways | ||||||||||
New road infrastructure | ||||||||||
Awatere Bridge | C | Com | 2005/06 | 322 | 100 | 13,706.0 | 20.0 | 20.0 | N | |
Ruby Bay Bypass A | C | Com | 2008/09 | 323 | 100 | 30,099.3 | 8,420.0 | 8,420.0 | N | |
Ruby Bay Bypass A | D | Com | 2006/07 | 323 | 100 | 918.6 | 134.9 | 134.9 | R-NMT | |
Whangamoa South Realign | D | Cat 2 | 323 | 1,500.0 | 500.0 | R-NMT | ||||
Minor improvements | ||||||||||
Minor improvements allocation | App | 2008/09 | 341 | 100 | 1,603.9 | 1,603.9 | 1,603.9 | N | ||
Block programme | ||||||||||
Hira EF (ex Richmond) | C | Cat 2 | 321 | 463.5 | 463.5 | N | ||||
Eves Valley Bridge 2L | D | Cat 2 | 322 | 103.0 | 103.0 | N | ||||
3 Brothers Corner I/S | D | Cat 2 | 324 | 77.3 | 77.3 | N | ||||
Sneiders Creek Realignment | D | Cat 2 | 324 | 123.6 | 123.6 | N | ||||
McGlashen Avenue I/S | C | Cat 2 | 324 | 2,940.0 | 1,465.0 | N | ||||
SH62 Rapaura - Wratts to SH1 | D | Cat 2 | 324 | 263.5 | 56.6 | N | ||||
SH62 Rapaura - Jefferies to Wratts | D | Cat 2 | 324 | 103.0 | 103.0 | N | ||||
Grovetown NB PL | C | Cat 2 | 324 | 800.0 | 800.0 | N | ||||
SH6 Gentle Annie Passing Lanes | I | Cat 2 | 324 | 98.9 | 98.9 | N | ||||
Hutchinson Bridge | I | Cat 2 | 61.8 | 61.8 | N | |||||
SH6 Quarantine Road I/S | I | Cat 2 | 45.3 | 45.3 | N | |||||
Doctors Creek Bridge | I | Cat 2 | 82.4 | 82.4 | N | |||||
Nelson Marlborough out of context Curves - Stage 1 | I | Cat 2 | 59.7 | 59.7 | N | |||||
SH6 Atawhai Drive Intersections | I | Cat 2 | 86.5 | 86.5 | N | |||||
Lions Back Safety Improvements | D | Cat 2 | 233.8 | 233.8 | N | |||||
Rai Saddle second curve realignment | I | Cat 2 | 206.0 | 206.0 | N | |||||
Dashwood Overbridge | D | Cat 2 | 206.0 | 206.0 | N | |||||
Cable Bay Road Intersection | I | Cat 2 | 51.5 | 51.5 | N | |||||
SH6 Colemans I/S | D | Cat 2 | 31.9 | 31.9 | N | |||||
Hutchinson Bridge | D | Cat 2 | 322 | - | - | N | ||||
Doctors Creek Bridge | D | Cat 2 | 322 | - | - | N | ||||
Eves Valley Bridge 2L | C | Cat 2 | 322 | - | - | N | ||||
Dashwood Overbridge | C | Cat 2 | 322 | - | - | N | ||||
Sneiders Creek Realignment | C | Cat 2 | 324 | - | - | N | ||||
Nelson Marlborough out of context Curves - Stage 1 | D | Cat 2 | 324 | - | - | N | ||||
Lions Back Safety Improvements | C | Cat 2 | 324 | - | - | N | ||||
Rai Saddle second curve realignment | D | Cat 2 | 324 | - | - | N | ||||
Rai Saddle second curve realignment | C | Cat 2 | 324 | - | - | N | ||||
Cable Bay Road Intersection | D | Cat 2 | 324 | - | - | N | ||||
3 Brothers Corner Intersection | C | Cat 2 | 324 | - | - | N | ||||
SH62 Rapaura-Jefferies to Wratts | C | Cat 2 | 324 | - | - | N | ||||
SH62 Rapaura-Wratts to SH1 | C | Cat 2 | 324 | - | - | N | ||||
Quarantine Road Intersection Improvement | D | Cat 2 | 324 | - | - | N | ||||
Atawhai Drive Intersections | D | Cat 2 | 324 | - | - | N | ||||
Colemans Intersection Improvement | D | Cat 2 | 324 | - | - | N | ||||
Gentle Annie PL | D | Cat 2 | 324 | - | - | N | ||||
Strategic studies | ||||||||||
Motueka Transportation Study | S | Cat 2 | 311 | - | - | - | N | |||
Region 10 Passing Lane Study | S | Cat 2 | 311 | - | - | - | N | |||
SH1 Blenheim to Christchurch | S | Cat 2 | 311 | - | - | N | ||||
Use of the land transport system | ||||||||||
Walking and cycling | ||||||||||
Appleby River Bridge WC | Cat 2 | 452 | - | 66.0 | N | |||||
Richmond Deviation Walking and Cycling | C | Cat 2 | 452 | - | - | N |
« Return to NLTP 2008 table of contents
Project name |
FTE Staff
|
Funding ($000)
|
---|---|---|
Police district managed activities |
|
|
Network-wide strategic road policing - enhanced alcohol CBT project |
4.9
|
768.4
|
Network-wide strategic road policing - traffic camera operations |
2.4
|
368.6
|
Court orders |
0.3
|
41.5
|
Transit NZ |
|
|
Highway strategic road policing - Highway Patrol |
14.2
|
2,207.7
|
Kaikoura and Marlborough Districts |
|
|
Highway strategic road policing |
1.3
|
202.5
|
Rural strategic road policing |
2.0
|
306.3
|
Urban strategic road policing |
5.0
|
778.8
|
Crash attendance and investigation |
2.0
|
306.3
|
Traffic management |
0.3
|
41.5
|
School road safety education |
0.6
|
88.3
|
Police community services |
0.2
|
36.3
|
Nelson City and Tasman District |
|
|
Highway strategic road policing |
2.9
|
446.5
|
Rural strategic road policing |
1.1
|
166.1
|
Urban strategic road policing |
10.9
|
1,697.8
|
Crash attendance and investigation |
3.6
|
560.7
|
Traffic management |
0.7
|
109.0
|
School road safety education |
0.9
|
135.0
|
Police community services |
0.5
|
72.7
|
Strategic road policing comprises the pro-active road policing activities of speed control, drinking or drugged driver control, restraint device control, and visible road safety and general enforcement.