Back to Resources

Marlborough Nelson Tasman

National Land Transport Programme (NLTP) - 2008/09 Marlborough/Nelson/Tasman

NZ Transport Agency logo

Regional and nationwide programmes | June 2008

Marlborough/Nelson/Tasman

This section presents the key aspects of the NLTP for the Marlborough/Nelson/Tasman region. It sets out the key statistic of transport in the region and presents tables of the new National Land Transport Programme (NLTP) appropriate to the region.

Overview of transport system: Marlborough

 Region
New Zealand
Region as % of NZ
Population 134,000
4,228,000
3%
Land area (km2) 22,715
275,446
8%
Imports (gross tonne)1, 2 4,600,000
76,000,000
6%
Exports (gross tonne)1, 2 4,800,000
67,000,000
7%
Gross Domestic Product (GDP) ($) 4,619,600,000
163,387,000,000
3%
Passenger Transport - Bus - boardings 50,580
89,683,159
0%
Passenger Transport - Rail - boardings -
16,913,205
 
Passenger Transport - Ferry - boardings -
4,224,398
 
Motor vehicles 105,000
2,850,000
4%
VKT (km) 1,331,500,000
39,845,600,000
3%
Fatalities on the roads 10
423
2%
Fatal and injury crashes on the roads 380
12,047
3%
Local roads - urban all (km) 557
17,251
3%
Local roads - urban sealed (km) 550
16,869
3%
Local roads - rural all (km) 2,932
65,432
4%
Local roads - rural sealed (km) 1,476
33,432
4%
State Highway - all (km) 645
10,893
6%
State Highway - sealed (km) 645
10,837
6%
State Highway - motorway (km) -
172
 

Data based on 2006/07 figures
1 Crude indicaton only - based on a ratio determined in 2002 by BAH between inter-national and inter-regional freight movements.
2 Includes both inter-national and inter-regional freight movement.

« Return to NLTP 2008 table of contents

 PhaseProfileStatusExpected start yearWork categoryFARTotal phase cost ($000)Total cost 2008/09 ($000)2008/09 NLTA ($000)Indicative funding source
Marlborough District Council
Maintenance and operation of local roads
Routine maintenance     App 2008/09     3,627.6 3,627.6 1,676.8 N
Renewal of local roads
Periodic maintenance     App 2008/09     4,211.3 4,211.3 1,937.2 N
Improvement of local roads
New road infrastructure
Bridge Replacement Programme 08/09 C   Cat 2 2008/09 322   243.0 243.0   R*
Kaituna Tuamarina Rehabilitation 'R' Funded C   Cat 2 2008/09 324   771.6 771.6   N
Northbank Road - Stage 6 C   Cat 2 2008/09 324   300.0 300.0   N/R
Old Renwick Rd/ Jacksons Rd Intersection Upgrade C   Cat 2 2008/09 324   640.0 640.0   N/R
Minor improvements
Minor improvements allocation     App 2008/09 341 56 627.1 627.1 351.2 N
Use of the land transport system
Community focused activities
Community Co-ordination I HHH App 2008/09 431 75 75.0 75.0 42.2 N
Safe Transport - Vehicle Users I HMH App 2008/09 432 75 55.0 55.0 41.3 N
Safe Transport -Vunerable Users I HMH App 2008/09 432 75 94.0 94.0 70.5 N
Sustainable Transport I HMH App 2008/09 432 75 47.0 47.0 35.3 N
Passenger transport
Services and operations
Bus services     App 2008/09 511 50 130.0 130.0 65.0 N
Bus & ferry facilities maintenance and operations     App 2008/09 514 60 2.0 2.0 1.2 N
Total mobility services     App 2008/09 517 40 90.0 90.0 36.0 N
Total Mobility Flat Payments     App 2008/09 521 100 18.0 18.0 18.0 N
Administration
Regional
RLTP administration     App 2008/09 631   - - 37.6 N
Passenger Transport administration     App 2008/09 632 50 2.0 2.0 1.0 N
Total Mobility administration     App 2008/09 633 25 12.0 12.0 3.0 N
Territorial
Administration support 2008/09     App 2008/09 621   - - 93.5 N
Marlborough District Council SPR
Maintenance and operation of local roads
Routine maintenance     App 2008/09     29.0 29.0 29.0 N
Renewal of local roads
Periodic maintenance     App 2008/09     1.0 1.0 1.0 N
Improvement of local roads
Minor improvements
Minor improvements allocation     App 2008/09 341 100 2.4 2.4 2.4 N
Administration
Territorial
Administration support 2008/09     App 2008/09 621   - - 0.7 N
Nelson City Council
Maintenance and operation of local roads
Routine maintenance     App 2008/09     2,391.5 2,391.5 1,028.3 N
Renewal of local roads
Periodic maintenance     App 2008/09     1,225.0 1,225.0 526.8 N
Preventive maintenance
Retaining Wall Replacement Programme C   Cat 2 2008/09 241   1,006.4 64.0   N
Improvement of local roads
New road infrastructure
Corridor Study Implementation (R Funded) I   Cat 2 2008/09 324   21,300.0 300.0   R*
Marsden / Ridgeway Intersection C   Cat 2 2008/09 324   710.0 710.0   N/R
Road studies
Crash Reduction Studies S   Cat 2 2008/09 311   20.0 20.0   N
Minor improvements
Minor improvements allocation     App 2008/09 341 53 289.3 289.3 153.3 N
Use of the land transport system
Studies
Corridor Study Model Update S   Cat 2 2008/09 411   35.0 35.0   N
Traval Demand Outcomes from Corridor Study S   Cat 2 2008/09 412   75.0 75.0   N
Walking and cycling
Footpath Construction C HML Com 2006/07 451 53 1,336.0 358.0 189.7 N
NCC cycle strategy review and implementation (package) C   Cat 2   452   840.0 840.0   N/R
Community focused activities
Road Safety and Travel planning co-ordination I HHH App 2008/09 431 75 125.0 125.0 93.8 N
Community road safety and sustainability projects I HMH App 2008/09 432 75 115.5 115.5 86.6 N
Passenger transport
Services and operations
Bus services     App 2008/09 511 50 110.0 110.0 55.0 N
Bus & ferry concession fares     App 2008/09 513 50 146.4 146.4 73.2 N
Bus & ferry facilities maintenance and operations     App 2008/09 514 60 95.5 95.5 57.3 N
Total mobility services     App 2008/09 517 40 205.3 205.3 82.1 N
Replacement wheelchair hoists     App 2008/09 519 60 2.0 2.0 1.2 N
Total Mobility Flat Payments     App 2008/09 521 100 48.9 48.9 48.9 N
Administration
Regional
RLTP administration     App 2008/09 631   - - 27.8 N
Passenger Transport administration     App 2008/09 632 50 20.0 20.0 10.0 N
Total Mobility administration     App 2008/09 633 25 60.0 60.0 15.0 N
Territorial
Administration support 2008/09     App 2008/09 621   - - 47.3 N
Tasman District Council
Maintenance and operation of local roads
Routine maintenance     App 2008/09     4,301.0 4,301.0 2,107.5 N
Renewal of local roads
Periodic maintenance     App 2008/09     6,623.0 6,623.0 3,245.3 N
Preventive maintenance
Preventive Maintenance - Carriageway Slumping C MMH Com 2007/08 241 49 104.0 53.0 26.0 N
Improvement of local roads
New road infrastructure
Advanced I and D Fees. 2008/09 D   Cat 2 2008/09 324   150.0 150.0   R*
Paton Road Reconstruction - R FUNDING C   Cat 2 2008/09 324   3,800.0 2,000.0   N/R
Pavement Smoothing C   Cat 2 2008/09 324   114.1 114.1   R*
Talbot Street Salisbury Road Intersection I   Cat 2 2008/09 324   300.0 300.0   R*
Bridge Valley Road Seal Extension Stage 2 C   Cat 2 2008/09 325   111.7 111.7   R*
Minor improvements
Minor improvements allocation     App 2008/09 341 59 873.9 873.9 515.6 N
Use of the land transport system
Walking and cycling
Cycleways-Project Related C   Cat 2 2008/09 452   211.4 211.4   N/R
Shared Use Path-School Rd to Community Rd C   Cat 2 2008/09 452   171.7 171.7   N/R
Community focused activities
Road Safety Coordination I HHH App 2008/09 431 75 124.5 124.5 93.4 N
Road Safety Activities and Programmes I HMH App 2008/09 432 75 91.0 91.0 68.3 N
Administration
Territorial
Administration support 2008/09     App 2008/09 621   - - 136.3 N
Tasman District Council SPR
Maintenance and operation of local roads
Routine maintenance     App 2008/09     89.0 89.0 89.0 N
Renewal of local roads
Periodic maintenance     App 2008/09     54.0 54.0 54.0 N
Improvement of local roads
Minor improvements
Minor improvements allocation     App 2008/09 341 100 11.4 11.4 11.4 N
Administration
Territorial
Administration support 2008/09     App 2008/09 621   - - 3.5 N
Transit - Nelson/Marlborough/Tasman
Maintenance and operation of state highways
Routine maintenance     App 2008/09   100 11,294.3 11,294.3 11,294.3 N
Emergency works
E/Works 07/08 Tasman C   Com 2007/08 141 100 1,245.0 763.0 763.0 N
E/Works Eureka Bend 10.91 C   Com 2006/07 141 100 2,300.0 1,450.7 1,450.7 N
Renewal of state highways
Periodic maintenance     App 2008/09   100 8,149.4 8,149.4 8,149.4 N
Improvement of state highways
New road infrastructure
Awatere Bridge C   Com 2005/06 322 100 13,706.0 20.0 20.0 N
Ruby Bay Bypass A C   Com 2008/09 323 100 30,099.3 8,420.0 8,420.0 N
Ruby Bay Bypass A D   Com 2006/07 323 100 918.6 134.9 134.9 R-NMT
Whangamoa South Realign D   Cat 2   323   1,500.0 500.0   R-NMT
Minor improvements
Minor improvements allocation     App 2008/09 341 100 1,603.9 1,603.9 1,603.9 N
Block programme
Hira EF (ex Richmond) C   Cat 2   321   463.5 463.5   N
Eves Valley Bridge 2L D   Cat 2   322   103.0 103.0   N
3 Brothers Corner I/S D   Cat 2   324   77.3 77.3   N
Sneiders Creek Realignment D   Cat 2   324   123.6 123.6   N
McGlashen Avenue I/S C   Cat 2   324   2,940.0 1,465.0   N
SH62 Rapaura - Wratts to SH1 D   Cat 2   324   263.5 56.6   N
SH62 Rapaura - Jefferies to Wratts D   Cat 2   324   103.0 103.0   N
Grovetown NB PL C   Cat 2   324   800.0 800.0   N
SH6 Gentle Annie Passing Lanes I   Cat 2   324   98.9 98.9   N
Hutchinson Bridge I   Cat 2       61.8 61.8   N
SH6 Quarantine Road I/S I   Cat 2       45.3 45.3   N
Doctors Creek Bridge I   Cat 2       82.4 82.4   N
Nelson Marlborough out of context Curves - Stage 1 I   Cat 2       59.7 59.7   N
SH6 Atawhai Drive Intersections I   Cat 2       86.5 86.5   N
Lions Back Safety Improvements D   Cat 2       233.8 233.8   N
Rai Saddle second curve realignment I   Cat 2       206.0 206.0   N
Dashwood Overbridge D   Cat 2       206.0 206.0   N
Cable Bay Road Intersection I   Cat 2       51.5 51.5   N
SH6 Colemans I/S D   Cat 2       31.9 31.9   N
Hutchinson Bridge D   Cat 2   322   - -   N
Doctors Creek Bridge D   Cat 2   322   - -   N
Eves Valley Bridge 2L C   Cat 2   322   - -   N
Dashwood Overbridge C   Cat 2   322   - -   N
Sneiders Creek Realignment C   Cat 2   324   - -   N
Nelson Marlborough out of context Curves - Stage 1 D   Cat 2   324   - -   N
Lions Back Safety Improvements C   Cat 2   324   - -   N
Rai Saddle second curve realignment D   Cat 2   324   - -   N
Rai Saddle second curve realignment C   Cat 2   324   - -   N
Cable Bay Road Intersection D   Cat 2   324   - -   N
3 Brothers Corner Intersection C   Cat 2   324   - -   N
SH62 Rapaura-Jefferies to Wratts C   Cat 2   324   - -   N
SH62 Rapaura-Wratts to SH1 C   Cat 2   324   - -   N
Quarantine Road Intersection Improvement D   Cat 2   324   - -   N
Atawhai Drive Intersections D   Cat 2   324   - -   N
Colemans Intersection Improvement D   Cat 2   324   - -   N
Gentle Annie PL D   Cat 2   324   - -   N
Strategic studies
Motueka Transportation Study S   Cat 2   311   - - - N
Region 10 Passing Lane Study S   Cat 2   311   - - - N
SH1 Blenheim to Christchurch S   Cat 2   311   - -   N
Use of the land transport system
Walking and cycling
Appleby River Bridge WC     Cat 2   452   - 66.0   N
Richmond Deviation Walking and Cycling C   Cat 2   452   - -   N

 

« Return to NLTP 2008 table of contents

Police

Project name
FTE Staff
Funding ($000)
Police district managed activities
 
 
Network-wide strategic road policing - enhanced alcohol CBT project
4.9
768.4
Network-wide strategic road policing - traffic camera operations
2.4
368.6
Court orders
0.3
41.5
Transit NZ
 
 
Highway strategic road policing - Highway Patrol
14.2
2,207.7
Kaikoura and Marlborough Districts
 
 
Highway strategic road policing
1.3
202.5
Rural strategic road policing
2.0
306.3
Urban strategic road policing
5.0
778.8
Crash attendance and investigation
2.0
306.3
Traffic management
0.3
41.5
School road safety education
0.6
88.3
Police community services
0.2
36.3
Nelson City and Tasman District
 
 
Highway strategic road policing
2.9
446.5
Rural strategic road policing
1.1
166.1
Urban strategic road policing
10.9
1,697.8
Crash attendance and investigation
3.6
560.7
Traffic management
0.7
109.0
School road safety education
0.9
135.0
Police community services
0.5
72.7

Strategic road policing comprises the pro-active road policing activities of speed control, drinking or drugged driver control, restraint device control, and visible road safety and general enforcement.

Page updated: 25 June 2008