Published: June 2025 | Category: Construction , Chipsealing , Specifications | Audiences: Road traffic engineers & consultants, Roading contractors
P03 Specification for first coat chip sealing sets out a client-prescribed method for the construction of a chip seal on a newly constructed granular basecourse pavement.
The areas covered by the specification include:
P03: 2025 specification replaces the version issued in 1995.