SH4 resilience
16 December 2020
In October 2019 a large slip came down close to Raetihi, cutting off parts of SH4. We were quickly able to install a temporary replacement, reconnecting the community within two months. Since then we’ve been working with mana whenua and the community to develop a permanent road for this site, while continuing to improve resilience along SH4.
Minister Phil Twyford gives an update on SH4
1 October 2020
Minister Phil Twyford visited Te Oreore south of Raetihi on State Highway 4 to see the slip site, temporary road and stabilisation work being done following the large slip that occurred in October 2019.