Meet drone operator Jeff Gatchell, an Engineering Surveyor in the Mt Messenger Alliance survey team.
Jeff is working alongside designers and constructors to ensure the new six-kilometre bypass is built as effectively as possible in some of the most steep and challenging terrain.