Ensuring the wider contracting market is ready for the IDM going live is critical to its success. As such NZTA has released a small set of documentation to provide awareness of the contract ahead of time.
The documents that have been released can be found below.
Title | Description | Published date |
---|---|---|
Volume 3: Working together [PDF, 787 KB] | This document outlines the way in which the Principal (NZTA) wishes to work with each network Contractor as part of the IDM. This brings together elements covered in other parts of the Contract into a single place to support personnel of the Principal and the Contractor to understand the IDM approach to maintaining the state highway network, their respective responsibilities, and the way that they will work together. | May 2025 |
Volume 4: Preliminary and general [PDF, 731 KB] | The Technical Specifications describe the Principal’s (NZTA’s) requirements of the Contractor within the Contract area (as set out in the Network Maps). The preliminary and general section covers establishment, general contract and network management requirements and technology and information management requirements. | May 2025 |
Volume 4: Technical specifications [PDF, 1.7 MB] | The Technical Specifications describe the Principal’s (NZTA’s) requirements of the Contractor within the Contract area (as set out in the Network Maps). The technical specification covers maintenance, renewals, and correction of defects in line with, and to meet all requirements and provisions of the Contract and these Specifications. | May 2025 |