Displaying 61 - 70 results of 146 for ""
Published: 2006
Category:
Digouts
,
Maintenance
,
Specifications
| Audiences:
Road traffic engineers & consultants,
Roading contractors
This specification, HM12 Digouts, replaces specification TNZ C4 Specification for digout repairs in flexible pavements.
Published: 2006
Category:
Operations
,
Maintenance
,
Specifications
| Audiences:
Road traffic engineers & consultants,
Roading contractors
This specification replaces specification TNZ C15 Specification for removal of surface detritus.
Published: 2006
Category:
Monitoring
,
Network
,
Specifications
| Audiences:
Road traffic engineers & consultants,
Roading contractors
This specification sets out the requirements for the selection of sites and the installation of inductive loops at traffic monitoring sites located on state highways.
Published: 1991
Category:
Barriers
,
Maintenance
,
Specifications
| Audiences:
Road traffic engineers & consultants,
Roading contractors
Guidance notes to the Specification for maintenance of guardrails and median barriers.
Published: June 1975
Category:
Materials
,
Chipsealing
,
Specifications
| Audiences:
Road traffic engineers & consultants,
Roading contractors
Specification for pre-coating sealing chips.
Published: October 2012
Category:
Construction
,
Chipsealing
,
Specifications
| Audiences:
Road traffic engineers & consultants,
Roading contractors
This specification and guidance notes set out the performance requirements for: single coat reseals using sealing chip with an average dimension greater than 5.5mm; multilayer seals using sealing chips in the range of grade 2 to grade 6, as defined i…
Published: 2013
Category:
Construction
,
Pavement & surfacing
,
Specifications
| Audiences:
Road traffic engineers & consultants,
Roading contractors
Specification and guidance notes for F2 Pipe Subsoil Drain Construction.
Published: December 2010
Category:
Construction
,
Pavement & surfacing
,
Specifications
| Audiences:
Road traffic engineers & consultants,
Roading contractors
Specification and guidance notes for pipe culverts including the construction of trenches; supply and placement of bedding; supply and laying of pipes; jointing of the pipes; construction of headwalls, wing-walls, aprons, drops, and intakes and outle…
Published: June 1977
Category:
Construction
,
Pavement & surfacing
,
Specifications
| Audiences:
Road traffic engineers & consultants,
Roading contractors
This test procedure covers the determination of the rebound deflection of a pavement under a standard wheel load and tyre pressure, with or without temperature measurements.
Published: February 2012
Category:
Skid resistance & texture
,
Surfacing
,
Specifications
| Audience:
Roading contractors
The NZ Transport Agency has released a pilot version of the P25 Specification for calcined bauxite for trial and comment.