Displaying 41 - 50 results of 148 for ""
Published: July 2012
Category:
Construction
,
Pavement & surfacing
,
Specifications
| Audiences:
Road traffic engineers & consultants,
Roading contractors
Stabilisation of pavement layers has a long history in New Zealand.
Published: 1995
Category:
Shoulder
,
Maintenance
,
Specifications
| Audiences:
Road traffic engineers & consultants,
Roading contractors
This specification and guidence notes set out the requirements and maintenance standard for unsealed shoulders, both gravel and grassed, including feather edges, tapers and surface water channels where adjacent pavement is sealed.
Published: 1992
Category:
Drainage
,
Maintenance
,
Specifications
| Audiences:
Road traffic engineers & consultants,
Roading contractors
This specification sets out the requirements routine maintenance of stormwater structures.
Published: 14 January 2011
Category:
Materials
,
Surfacing
,
Specifications
| Audience:
Roading contractors
Test method to assess the long-term field durability (resistance to oxidative hardening) of NZTA M1 penetration grade bitumens.
Published: 2009
Category:
Materials
,
Road marking
,
Specifications
| Audiences:
Road traffic engineers & consultants,
Roading contractors
This specification describes the procedure for determining the retroreflectivity of road marking material.
Published: 2009
Category:
Materials
,
Road marking
,
Specifications
| Audiences:
Road traffic engineers & consultants,
Roading contractors
This specification describes the procedure for determining the heavy metal content in glass beads intended for use in pavement marking materials.
Published: 2003
Category:
Structures
,
Maintenance
,
Specifications
| Audiences:
Road traffic engineers & consultants,
Roading contractors
This specification and guidance notes are for the maintenance painting of structural steelwork coated with lead-based paint.
Published: 2000
Category:
Construction
,
Pavement & surfacing
,
Specifications
| Audiences:
Road traffic engineers & consultants,
Roading contractors
This specification and guidance notes refer to the use of perforated corrugated plastic pipe of up to 110 mm nominal outside diameter in subsoil drains under light duty conditions, eg for use in agricultural land, playing fields and lightly loaded or…
Published: 1995
Category:
Construction
,
Chipsealing
,
Specifications
| Audiences:
Road traffic engineers & consultants,
Roading contractors
The specification and guidance notes for first coat seals applied upon the finished surface of compacted granular basecourse pavement.
Published: 1983
Category:
Construction
,
Pavement & surfacing
,
Specifications
| Audiences:
Road traffic engineers & consultants,
Roading contractors
This method can be used to provide a simple quality control test to determine the permeability of a fabric.