Displaying 21 - 30 results of 148 for ""
Published: 2013
Category:
Construction
,
Pavement & surfacing
,
Specifications
| Audiences:
Road traffic engineers & consultants,
Roading contractors
Specification and guidance notes for F2 Pipe Subsoil Drain Construction.
Published: December 2010
Category:
Construction
,
Pavement & surfacing
,
Specifications
| Audiences:
Road traffic engineers & consultants,
Roading contractors
Specification and guidance notes for pipe culverts including the construction of trenches; supply and placement of bedding; supply and laying of pipes; jointing of the pipes; construction of headwalls, wing-walls, aprons, drops, and intakes and outle…
Published: 2006
Category:
Unsealed pavements
,
Maintenance
,
Specifications
| Audiences:
Road traffic engineers & consultants,
Roading contractors
HM23 Unsealed pavements replaces specifications TNZ C11, C12, C13 and C14.
Published: 2006
Category:
Service covers
,
Maintenance
,
Specifications
| Audiences:
Road traffic engineers & consultants,
Roading contractors
This specification, HM15 Service covers, replaces specification TNZ C8 Specification for adjusting service covers.
Published: 2006
Category:
Potholes
,
Maintenance
,
Specifications
| Audiences:
Road traffic engineers & consultants,
Roading contractors
This specification sets out the requirements for the repair of potholes in bituminous surfaced roads and bridge decks.
Published: 2006
Category:
Operations
,
Maintenance
,
Specifications
| Audiences:
Road traffic engineers & consultants,
Roading contractors
This specification replaces specification TNZ C9 Specification for emergency work.
Published: 2006
Category:
Edgebreak
,
Maintenance
,
Specifications
| Audiences:
Road traffic engineers & consultants,
Roading contractors
This specification, HM14 Edgebreak, replaces specification TNZ C7 Repair of edge break.
Published: 2006
Category:
Drainage
,
Maintenance
,
Specifications
| Audiences:
Road traffic engineers & consultants,
Roading contractors
This specification replaces specification TNZ C16 Specification for maintenance of stormwater structures.
Published: 2006
Category:
Digouts
,
Maintenance
,
Specifications
| Audiences:
Road traffic engineers & consultants,
Roading contractors
This specification, HM12 Digouts, replaces specification TNZ C4 Specification for digout repairs in flexible pavements.
Published: 2006
Category:
Operations
,
Maintenance
,
Specifications
| Audiences:
Road traffic engineers & consultants,
Roading contractors
This specification replaces specification TNZ C15 Specification for removal of surface detritus.