Displaying 131 - 140 results of 502 for ""
Published: November 2020
Category:
Setting of speed limits
,
Bylaws
| Audiences:
Road controlling authorities,
Road traffic engineers & consultants,
Roading contractors
Amending the schedules to set new speed limits.
Published: November 2020
Category:
Setting of speed limits
,
Bylaws
| Audiences:
Road controlling authorities,
Road traffic engineers & consultants,
Roading contractors
Amending the schedules to set new speed limits.
Published: September 2020
Category:
Setting of speed limits
,
Bylaws
| Audiences:
Road controlling authorities,
Road traffic engineers & consultants,
Roading contractors
Amending the schedules to set new speed limits.
Published: September 2020
Category:
Setting of speed limits
,
Bylaws
| Audiences:
Road controlling authorities,
Road traffic engineers & consultants,
Roading contractors
Amending the schedules to set new speed limits.
Published: August 2020
Category:
Setting of speed limits
,
Bylaws
| Audiences:
Road controlling authorities,
Road traffic engineers & consultants,
Roading contractors
Amending the schedules to set new speed limits.
Published: 10 December 2007
Category:
Travel demand management
,
Manuals
| Audiences:
Road traffic engineers & consultants,
Roading contractors
This manual provides practical advice and assistance in interpreting and putting into practice travel demand management techniques.
Published: May 2005
Category:
Planning, design, funding, building, maintenance of the transport network
,
Guidance for specialists
| Audiences:
Road traffic engineers & consultants,
Roading contractors
Papers from the Surface Friction conference, held in Christchurch, New Zealand in May 2005.
Published: 28 October 2011
Category:
Research & reports
| Audience:
Roading contractors
This paper will discuss the process for developing NZ Transport Agency’s passing and overtaking (PO) plans.
Published: October 2014
Category:
Activity management
,
Research programme
,
Research & reports
| Audience:
Roading contractors
The research investigated aspects of the use of epoxy modified bitumen for construction of chip seals.
Published: 2005
Category:
Winter maintenance
,
Maintenance
,
Specifications
| Audiences:
Road traffic engineers & consultants,
Roading contractors
This TNZ C/22 specification and guidance notes sets out the requirements for maintenance of a road network that is at risk of snow and ice events to ensure the required road availability and levels of service are achieved during winter.