Displaying 81 - 90 results of 340 for ""
Published: 7 December 2015
Category:
Activity management
,
Research programme
,
Research & reports
| Audiences:
Road controlling authorities,
Road traffic engineers & consultants,
Roading contractors
The application of geosynthetics (ie geogrids) for the stabilisation of basecourses prepared with a River Run rounded gravel aggregate was investigated.
Published: February 2003
Category:
Research & reports
| Audience:
Road controlling authorities
The objectives of this study were to: determine the extent to which inadequate or inappropriate levels of visibility of roadside furniture is a road safety problem (ie crash cause) both in New Zealand and overseas identify methods (New Zealand and in…
Published: October 2005
Category:
Research & reports
| Audience:
Road controlling authorities
The purpose of the report is twofold.
Published: December 2021
Category:
Construction
,
Asphalt
,
Specifications
| Audiences:
Road controlling authorities,
Road traffic engineers & consultants,
Roading contractors
The T23 method for the estimation of the density of compacted aggregate layers by direct transmission is used to quantify the vertical uniformity of aggregate compacted in a pavement layer.
Published: December 2021
Category:
Construction
,
Asphalt
,
Specifications
| Audiences:
Road controlling authorities,
Road traffic engineers & consultants,
Roading contractors
The M32 specification for high modulus asphalt (EME 2) (version 1) and notes (version 1) cover EME 2 high modulus asphalt for roads, industrial pavements and related applications.
Published: 1995
Category:
Construction
,
Chipsealing
,
Specifications
| Audiences:
Road controlling authorities,
Road traffic engineers & consultants
The specification and guidance notes for resealing on an existing sealcoat or primed surface.
Published: 17 December 2021
Category:
Technical advice note
| Audiences:
Road controlling authorities,
Road traffic engineers & consultants,
Roading contractors
This note is to advise that amendments have been made to the Waka Kotahi NZ Transport Agency “Contractor health and safety expectations: guidance for supply chain partners” document.
Published: 17 December 2021
Category:
Technical advice note
| Audiences:
Road controlling authorities,
Road traffic engineers & consultants,
Roading contractors
This note is to advise that a Design Framework has been introduced for use on all current and future corridors and sites that form part of Road to Zero Speed and Infrastructure Programme (SIP).
Published: 17 December 2021
Category:
Technical advice note
| Audiences:
Road controlling authorities,
Road traffic engineers & consultants,
Roading contractors
This note is to advise staff and suppliers who update the Road Asset Maintenance Management (RAMM) database system that there has been some significant changes to the updating requirements.
Published: 16 February 2023
Category:
Guidance for specialists
| Audiences:
Advice and assistance,
Local & regional government,
Road controlling authorities
Multi-criteria analysis (MCA) is used to assess multiple criteria, both quantitative and qualitative, to compare different alternatives and options.