Displaying 571 - 580 results of 635 for ""
Published: August 2007
Category:
Manuals
| Audience:
Road traffic engineers & consultants
This appendix supports Transit NZ's policy on passing and overtaking in section 3.4.3 of the PPM.
Published: June 2006
Category:
Research & reports
| Audience:
Road traffic engineers & consultants
In 2006, the Board of Transit NZ (now the NZ Transport Agency) approved the passing and overtaking (PO) policy.
Published: October 2004
Category:
Construction
,
Pavement & surfacing
,
Specifications
| Audiences:
Road traffic engineers & consultants,
Roading contractors
This specification and guidance notes set out requirements for basecourse aggregate for use on state highways and other heavily trafficked roadways.
Published: 1 July 2009
Category:
Austroads guides
,
Manuals
| Audiences:
General,
Local & regional government,
Road controlling authorities,
Road traffic engineers & consultants,
Roading contractors
The NZ Transport Agency will be formally integrating the new guides into their business from the 1st August 2010.
Published: 2 November 2010
Category:
Planning, design, funding, building, maintenance of the transport network
,
Guidance for specialists
| Audience:
Road traffic engineers & consultants
This guideline is for the use of road controlling authorities, consultants and contractors when designing and installing audio tactile profiled roadmarkings.
Published: 2007
Category:
Materials
,
Road marking
,
Specifications
| Audiences:
Road traffic engineers & consultants,
Roading contractors
This specification and guidance notes apply only to audio tactile profiled (ATP) road markings.
Published: 10 January 2011
Category:
Urban design
,
Planning, design, funding, building, maintenance of the transport network
,
Guidance for specialists
| Audiences:
Road traffic engineers & consultants,
Roading contractors
The Western Ring Route urban and landscape design framework was prepared to provide an overall design direction for State Highway 20 (Maioro Road to Waterview) and State Highway 16 (St Lukes Road to Lincoln Road).
Published: July 2009
Category:
Urban design
,
Planning, design, funding, building, maintenance of the transport network
,
Guidance for specialists
| Audience:
Road traffic engineers & consultants
The purpose of this framework is to describe the urban and landscape design concept for the Tauranga Eastern Link Project.
Published: March 2010
Category:
Urban design
,
Planning, design, funding, building, maintenance of the transport network
,
Guidance for specialists
| Audience:
Road traffic engineers & consultants
The purpose of this framework is to provide urban design for the specimen design, procurement, design and construction, and asset management stages of the Victoria Park Tunnel Project (VPT).
Published: 1992
Category:
Service covers
,
Maintenance
,
Specifications
| Audiences:
Road traffic engineers & consultants,
Roading contractors
This specification and accompanying guidance notes set out the requirements for the adjustment of service covers necessary before asphaltic concrete paving, after a pavement reseal, settlement of the pavement adjacent to service covers, or settlement…