Displaying 101 - 110 results of 641 for ""
Published: October 2013
Category:
Road safety hardware and practice
,
Technical memoranda
| Audience:
Road traffic engineers & consultants
This standard drawing shows details of the accepted curved terminal end terminal treatment as described in Technical memorandum TM2008.
Published: November 2004
Category:
Crash analysis
,
Research & reports
| Audience:
Road traffic engineers & consultants
The Land Transport Safety Authority, Transit New Zealand and local authorities are partners in the Crash Reduction Study Programme (formerly known as the Joint Crash Investigation Programme) in New Zealand.
Published: 2000
Category:
Construction
,
Pavement & surfacing
,
Specifications
| Audiences:
Road traffic engineers & consultants,
Roading contractors
This specification and guidance notes refer to the use of perforated corrugated plastic pipe of up to 110 mm nominal outside diameter in subsoil drains under light duty conditions, eg for use in agricultural land, playing fields and lightly loaded or…
Published: December 2011
Category:
Road safety hardware and practice
,
Technical memoranda
| Audience:
Road traffic engineers & consultants
To advise on the recommended practice for the design and installation of a buried in backslope end treatment.
Published: November 2022
Category:
Structures (bridges & culverts)
,
Manuals
| Audiences:
Road traffic engineers & consultants,
Roading contractors
This NZTA S6 policy document sets out the requirements for the inspection of bridges and other significant structures on the state highway network including the structural aspects of tunnels.
Published: 1995
Category:
Construction
,
Chipsealing
,
Specifications
| Audiences:
Road traffic engineers & consultants,
Roading contractors
The specification and guidance notes for first coat seals applied upon the finished surface of compacted granular basecourse pavement.
Published: 1983
Category:
Construction
,
Pavement & surfacing
,
Specifications
| Audiences:
Road traffic engineers & consultants,
Roading contractors
This method can be used to provide a simple quality control test to determine the permeability of a fabric.
Published: 2003
Category:
Construction
,
Pavement & surfacing
,
Specifications
| Audiences:
Road traffic engineers & consultants,
Roading contractors
This specification and guidance notes apply to the construction of subsoil drains which consist of geotextile lined trenches filled with drainage aggregate.
Published: September 2014
Category:
Environment & resource planning
,
Manuals
| Audiences:
Local & regional government,
Road controlling authorities,
Road traffic engineers & consultants,
Roading contractors
The guidelines have been developed to assist roading practitioners with the selection and design of erosion and sediment control practices.
Published: 25 June 2006
Category:
Planning, design, funding, building, maintenance of the transport network
,
Guidance for specialists
| Audience:
Road traffic engineers & consultants
Best practice guidelines for the use of alternative materials and processes in road construction with respect to environmental issues