Published: July 2021 | Category: Environment , Specifications | Audience: General
This P48 specification outlines the requirements for implementation of the Resource Efficiency Policy for Infrastructure Delivery and Maintenance during the design and delivery of Waka Kotahi infrastructure improvement projects.
A tiered threshold approach has been taken to categorise projects, as per the table below. Tier 1 projects are required to report a wider range of resource efficiency data and complete a detailed carbon footprint. Tier 2 and 3 projects are required to report fewer categories of data, with Tier 2 requiring only a basic carbon footprint. All are required to prepare a resource efficiency and waste minimisation plan (REWMP), however the level of detail in these plans will be commensurate with the size of the project.
Category |
Threshold |
Tier 1 |
>$15 million and duration ≥12 months |
Tier 2 |
>2 million but <15 million, or > 15 million with duration ≤12 months. |
Tier 3 |
<2 million eg low-cost low risk projects. |