Published: 1993 | Category: Operations , Maintenance , Specifications | Audiences: Road traffic engineers & consultants, Roading contractors
This specification sets out the requirements for the removal and disposal from the surface of the carriageway and drainage channels of detritus as requires removal. This specification will be withdrawn in 2011 as it has been replaced by HM20 Detritus and slip removal. However, if TNZ C15 is referred to in existing contract documents then you may continue to use it.