Scam alerts: we’ve seen an increase in scam texts and emails claiming to be from us, asking for payments.
Check our example scams or report a scam to us

NZTA App: our mobile app provides a simple and secure way to access your driver licence and vehicle information.
Learn more and download the NZTA app

Resources

Back to Resources

Pipe culvert construction

Published: | Category: Construction , Pavement & surfacing , Specifications | Audiences: Road traffic engineers & consultants, Roading contractors

Specification and guidance notes for pipe culverts including the construction of trenches; supply and placement of bedding; supply and laying of pipes; jointing of the pipes; construction of headwalls, wing-walls, aprons, drops, and intakes and outlet structures; the construction of connecting and outlet drains; backfill of trenches and reinstatement. Consideration should be given in specifying in the specific contract documents the pipe installation in accordance with a relevant standard that will result in improved methods for construction, for example, NZS 4406: 1984.

Publication details

  • Author:
  • Published: December 2010
  • Version: 2010
  • Conditions: Use is mandatory on state highways and recommended on other road controlling authority roads.
  • Also known as: F/3