Published: 2006 | Category: Drainage , Maintenance , Specifications | Audiences: Road traffic engineers & consultants, Roading contractors
This specification replaces specification TNZ C16 Specification for maintenance of stormwater structures. However, if TNZ C16 is referred to in existing contract documents then you may continue to use it.