Scam alerts: we’ve seen an increase in scam texts and emails claiming to be from us, asking for payments.
Check our example scams or report a scam to us

NZTA App: our mobile app provides a simple and secure way to access your driver licence and vehicle information.
Learn more and download the NZTA app

Resources

Back to Resources

Digouts

Published: | Category: Digouts , Maintenance , Specifications | Audiences: Road traffic engineers & consultants, Roading contractors

This specification, HM12 Digouts, replaces specification TNZ C4 Specification for digout repairs in flexible pavements. However, if TNZ C4 is referred to in existing contract documents then you may continue to use it. Alternatively you could use MR09 Pre-surfacing Repairs if you plan to include all of the following specifications in a single surfacing contract: C4, C5, C6, C7 and C8.

Publication details

  • Author:
  • Published: 2006
  • Reference: TNZ HM/12
  • Conditions: Use is mandatory on state highways and recommended on other road controlling authority roads.
  • Also known as: HM12

Browse section/chapter

  1. Digouts — 6 pages, 201 KB