Scam alerts: we’ve seen an increase in scam texts and emails claiming to be from us, asking for payments.
Check our example scams or report a scam to us

NZTA App: our mobile app provides a simple and secure way to access your driver licence and vehicle information.
Learn more and download the NZTA app

Resources

Back to Resources

Procedure for the estimation of the kerosene content of cutback bitumen (T09)

Published: | Category: Materials , Chipsealing , Specifications | Audiences: Road traffic engineers & consultants, Roading contractors

NZTA T09 Procedure for the Procedure for the Estimation of the Kerosene Content of Cutback Bitumen sets out a procedure by which the kerosene content of cutback bitumen is estimated from the kinematic viscosity of a sample. The viscosity of the base bitumen and the contribution of other diluents is assumed.

The areas covered by the procedure include:

  • determination of the kinematic viscosity of a cutback bitumen sample
  • the calculation of the estimated kerosene content.

NZTA T09 specification replaces the version issued in 2003.

Publication details

  • Author:
  • Published: 5 June 2025
  • Reference: NZTA T09
  • Contact: pavements@nzta.govt.nz
  • Conditions: This specification is mandatory for state highways and recommended for local roads.
  • Also known as: T/9; T/09