Resources

Displaying 1 - 4 results of 4 for ""

Removal of surface detritus

Published:
Category: Operations , Maintenance , Specifications | Audiences: Road traffic engineers & consultants, Roading contractors

This specification sets out the requirements for the removal and disposal from the surface of the carriageway and drainage channels of detritus as requires removal.

Specification for emergency work

Published:
Category: Operations , Maintenance , Specifications | Audiences: Road traffic engineers & consultants, Roading contractors

This specification and guidence notes describe the service to be provided for emergency work arising from storm damage, floods, debris, slips and the like.

Incident response (maintenance specification)

Published:
Category: Operations , Maintenance , Specifications | Audiences: Road traffic engineers & consultants, Roading contractors

This specification replaces specification TNZ C9 Specification for emergency work.

Detritus and slip removal

Published:
Category: Operations , Maintenance , Specifications | Audiences: Road traffic engineers & consultants, Roading contractors

This specification replaces specification TNZ C15 Specification for removal of surface detritus.