Resources

Back to Resources

#20-13 State Highway Construction Contract Proforma Manual (SM031) Appendix D Issue 14 and State Highway Maintenance Contract Proforma Manual (SMO32) Appendix B Issue 11

Published: | Category: Technical advice note | Audiences: Road traffic engineers & consultants, Roading contractors

This note is to advise that a new Alliance contract model proforma has been released to be used for all future procurement where an Alliance model will be used. The updated Alliance contract model appears in Appendix D to issue 14 of the Waka Kotahi NZ Transport Agency State highway construction contract proforma manual (SM031) and Appendix B to issue 11 of the Waka Kotahi NZ Transport Agency State highway maintenance contract proforma manual (SM032).

Purpose

This note is to advise that a new Alliance contract model proforma has been released to be used for all future procurement where an Alliance model will be used.  The updated Alliance contract model appears in Appendix D to issue 14 of the Waka Kotahi NZ Transport Agency State highway construction contract proforma manual (SM031) and Appendix B to issue 11 of the Waka Kotahi NZ Transport Agency State highway maintenance contract proforma manual (SM032).

For a copy of the new Alliance contract model,  contact Procurement at Waka Kotahi at the address below.  The changes are mainly internal process changes, all-of-Government and sector requirements and editorial changes.   The new versions of Appendix D and Appendix B apply from the date of this notice.

General information

Appendix D to the State highway construction contract proforma manual (SM031) and Appendix B to the State highway maintenance contract proforma manual (SM032) are used when forming a new Alliance for a construction or maintenance project.

Appendix D to SM031 and Appendix B to SM032 have been updated to reflect current business practice and to align with our Procurement Manual and the Procurement Policy. The processes and procedures outlined in this update to Appendix D to SM031 and Appendix B to SM032 must be followed by Waka Kotahi for all Alliance project procurements that are undertaken from now on.

Purpose of the Manual

Waka Kotahi is responsible for managing the state highway system, including planning, funding, design, supervision, construction, and maintenance and operations, having regard to the contribution to an effective, efficient, and safe land transport system in the public interest (Land Transport Management Act sections 2, 25 and 95). 

The purpose of the Manuals is to fulfil the obligations of the Waka Kotahi to the Land Transport Management Act and also to provide organisations with some guidance in developing their own procedures.  It also allows our contractors to be more aware of our expectations as an organisation.

Changes

The changes to Appendix D to SM031 and Appendix B of SM032 are not considered to have significant effects, consisting of:

  • Corrections to the appendices to align with internal changes such as references to Waka Kotahi standards
  • Incorporating necessary external changes such as changes to legislation
  • Editorial changes to make the appendices easier to read.

All changes to Appendix D to SM031 and Appendix B of SM032 were made in consultation with selected internal and external subject matter experts.

A more detailed list of the appendices’ changes can be found by contacting Procurement at Waka Kotahi at the address below.

Communication plan

Our target audience for Appendix D to SM031 and Appendix B of SM032 is Waka Kotahi staff and those external consultants who conduct procurement on behalf of Waka Kotahi.  Advice of these changes will be promulgated by: 

  • This note advising the release of Appendix D to SM031 and Appendix B of SM032; and
  • Delivery of presentations at the next Project Managers Forum and Tender Secretary and Procurement meeting.

Implementation

Appendix D to SM031 and Appendix B to SM032 are not currently published for use on the Waka Kotahi website and InfoHub. Users of Appendix D to SM031 and Appendix B to SM032 will be able to obtain copies of the updated Appendices, and a copy of the summary of amendments, by contacting Procurement at Waka Kotahi at the address below.

Given this update is reflective of current procedures and processes it was not considered necessary to conduct company-wide, specific training on the changes to Appendix D to SM031 or Appendix B to SM032.

Document review

A full review of the effectiveness of the changes and the current Manuals will be undertaken in June 2021.

Publication details

Author: Waka Kotahi NZ Transport Agency
Published: June 2020
Reference: ISBN: 978-1-98-856167-7
Version: 11
Found at: Contact Procurement

Further information

To submit documents or if you have any questions or feedback, please contact the Senior Procurement Advisor – Procurement Excellence at procurement@nzta.govt.nz with the subject line ‘Feedback for SM031’.

 

[signed]

David Darwin - Chair, Ratification Group

Vanessa Browne - Delegated Approver