Published: 28 June 2016 | Category: Technical advice note | Audiences: Road controlling authorities, Road traffic engineers & consultants, Roading contractors
Updates have been made to preliminary instructions for maintenance and minor improvement works.
All documents relating to the State highway annual plan instructions manual (SM018) are available on the Highways Information Portal at the following link:
The SM018 Annual plan instructions (maintenance and operations) 2017/18 - Volume 1 and the SM018 Annual plan instructions (capital) 2017/18 documents have been updated with information for planning for the 17/18 year and the next National Land Transport Programme (NLTP) period.
Maintenance and operations instructions will have a further two volumes released in August 2016 and October 2016.
The following documents which support SM018 Maintenance and Operations Vol.1 have also been updated/added:
The following documents which support SM018 Annual Plan Instructions (Capital) 2017/18 have also been updated/added:
Contact Mark O’Connor from the Highways and Network Operations' Outcome Delivery team at Mark.O’Connor@nzta.govt.nz.
Kevin Reid