Surface flooding on SH2, Bay Link project

|

Waka Kotahi NZ Transport Agency advises there is surface flooding on the Bay Link site between the Bayfair and Te Maunga roundabouts.

This comes as heavy rain continues to place additional pressure on the site’s drainage system.

The project team are putting measures in place to help clear the water, and we ask motorists to take extra care when driving through the site.

A temporary 30km/h speed limit applies around the Bayfair roundabout and a 50km/h temporary speed limit applies on SH2 between Te Maunga roundabout and Concord Ave.

More information about the Bay Link project.

Plan ahead for a safe, enjoyable journey. Keep up to date with:

Tags