Summer maintenance on State Highway 29 to deliver smoother journeys

|

State Highway 29 is a key focus as part of NZ Transport Agency Waka Kotahi summer maintenance programme.

Between October 2024 and May 2025 there are 9 significant sites on the Bay of Plenty side of the Kaimai Range where we will be rebuilding and resurfacing the road.

Once complete, drivers will have smoother and safer journeys along this section of the SH29 corridor.

The work is part of the $235 million 2024-27 National Land Transport Programme maintenance investment in state highways across the Bay of Plenty.

To minimise impacts to traffic, most of the works will be carried out in the evening, between 7pm and 6am, on Sunday to Thursday nights (excluding public holidays) with stop/go in place.

Starting this weekend, contractors will begin with a road rebuild near Hanga Road on Sunday 20 October*, for an expected period of 3 weeks, followed by resurfacing near Old Kaimai Road on Sunday 17 November until Thursday 28 November.

A temporary speed limit of 30km/h will be in place and some work sites will have stop/go traffic lights. People should expect delays when travelling through the area.

Meanwhile, further west on SH29, resurfacing work will get underway between Gargan Road and Redwood Lane on Sunday 3 November.

This work will be completed over 5 nights between 7pm and 5am with stop/go and a temporary reduced speed limit of 30km/h at night and 50km/h during the day.

The next round of Kaimai Range closures is also scheduled to take place, starting on Sunday 17 November, from 8pm to 3.30am for 5 nights. The closures are needed to undertake asphalt work and other routine maintenance activities such as clearing drains, sign maintenance and road marking.

The closure points on the western (Waikato) side are at the SH29/24 and SH29/28 intersections and on the eastern (BOP) side at the SH29/Cambridge Road intersection. Emergency services will have access at all times, and residents can access their property from the relevant side of the closure.

Other upcoming work sites scheduled to get underway in December include near Soldiers Road and Kaimai School. View more on these in the map below.

View/download map [PDF, 275 KB]

As much work as possible will be completed ahead of Christmas and a short break over the holiday period. Crews will then get back into it until autumn sets in.

In addition to this, the SH29 Tauriko Enabling Works project is also underway, with lots of activity along the state highway between Belk and Cambridge Roads. 

Tauriko Enabling Works

Meanwhile on the Waikato side, works are also ongoing at the SH1/29 intersection in Piarere. 

SH1/SH29 intersection

People are encouraged to plan ahead and see where disruptive works are by using the NZTA Journey Planner.

NZTA Journey Planner(external link)

NZ Transport Agency Waka Kotahi thanks road users and the community for their patience.

*All dates are subject to weather.

Tags