Scam alerts: we’ve seen an increase in scam texts and emails claiming to be from us, asking for payments.
Check our example scams or report a scam to us

NZTA App: our mobile app provides a simple and secure way to access your driver licence and vehicle information.
Learn more and download the NZTA app

State Highway 1 maintenance steps up a gear in Wellington

|

The State Highway Summer Maintenance programme remains in full swing with State Highway 1 between Newlands and Tawa the next in line for attention over the next month.

Mark Owen, Regional Manager Wellington / Top of the South for NZ Transport Agency Waka Kotahi (NZTA) says to date it has been a big maintenance season for the Wellington region, and there is still a lot of work to do.

“State Highway 1 into Wellington is a critical link, and it needs regular maintenance. So, for the second half of February our road crews will be hard at work resurfacing the highway’s northbound lanes between Johnsonville and Glenside.

“These are heavily used routes – for State Highway 1, on an average day, more than  30,000 vehicles use the northbound lanes. That is a lot of wear and tear, which is why this resurfacing is necessary. It is all about ensuring the highway remains safe and reliable,” Mr Owen says.

From Sunday, 16 February until Thursday, 20 February – 9 pm to 4:30 am the highway’s northbound lanes will be closed for resurfacing between the Helston Road overbridge and the Grenada/Glenside offramp. A local road detour will be available via Johnsonville and Middleton Road. People who live in Johnsonville who need to travel north will need to use the Glenside northbound onramp. The highway’s southbound lanes will be open at all times.

The week following, contractors will resurface the Takapu Road roundabout at Tawa/Grenada North interchange. We will provide a further update once these details have been confirmed.

“We are doing these works at night when there is less traffic on the road. Closing the road lets us get the job done quicker and reduces traffic management costs. It is also safer for road workers and the public,” Mr Owen says.

Works Schedule and Detour Route

  • Sunday, 16 February to Thursday, 20 February. 9 pm – 4:30 am
    • SH1 CLOSED to northbound traffic between Johnsonville northbound offramp and Glenside northbound onramp. Local road detour available via Johnsonville and Middleton Road.
    • SH1 southbound lanes will remain OPEN at all times
    • Johnsonville residents will need to access SH1 northbound at Glenside

More Information

Tags