SH25 Whangapoua – Night works starting Sunday (23 June)

|

NZ Transport Agency Waka Kotahi (NZTA) is advising motorists that surface repairs are scheduled to take place overnight from this Sunday 23 June to Thursday 27 June from 8pm to 6am on State Highway 25 at Whangapoua Hill

There are multiple small worksites from north of the Maraetotara Reserve for approximately 2km.

The work is to repair patches of damaged pavement to improve the road surface and increase its longevity over the wetter winter months. SH25 is too narrow to allow both traffic and the large machinery to safely operate at the same time.

To ensure the safety of both the crew and traffic, this work needs to be completed under stop/stop traffic controls and traffic will be held for short periods. Traffic may be held for up to 30 minutes at a time to allow work to take place, meaning there could be delays.

There will also be a temporary speed limits in place of 30km/h and 50 km/h through the worksite.

Drivers are advised to allow extra time for their trips and stay up to date on our journey planner. NZTA thanks motorists for their patience.

journeys.nzta.govt.nz(external link)

Tags