A series of planned road closures will be in place at the Domain Road interchange on State Highway 2 (SH2) over the next week, as work on the Tauranga Eastern Link (TEL) continues.
The NZ Transport Agency says SH2 between Domain Road and Welcome Bay Road will be closed to allow contractors to construct the Te Puke approach into the new Domain Road interchange roundabout.
A detour via Domain Road, Tara Road, Parton Road and Bell Road will be in place during the road closures.
Closure details are as follows:
Sunday September 7
Each night from Monday September 8 through to Friday September 12
The Domain Road interchange roundabout will connect traffic between Te Puke and Papamoa and will run underneath the TEL.
The Transport Agency thanks drivers for their patience while these necessary works are carried out.
For personalised information about driving conditions on their frequently used routes, motorists can check out and sign up to On The Move at www.onthemove.govt.nz(external link).
For real time information on highway conditions and incidents visit www.nzta.govt.nz(external link) call 0800 4 HIGHWAYS or follow @nztawaibop on twitter.
For more information please contact:
Natalie Dixon
Media Manager
Waikato and Bay of Plenty region
T: 07 928 7908
M: 021 928 413
natalie.dixon@nzta.govt.nz