A stretch of State Highway 1 south of the Manakau Rail overbridge between Ōtaki and Levin will be under stop/go traffic management on Monday night.
During the overnight work, crews will be providing a more permanent fix for potholes in the area.
Crews will be onsite near Whakahoro Road on the evening of Monday 23 September, between 7pm and 6am to complete the work.
While work is underway stop/go traffic management will be in place, with a 30km/h speed limit. We expect minimal delays due to this work.
This work will see a more permanent solution to the potholes that have developed over the winter months. We understand the importance of ensuring potholes are repaired and filled as quickly, and safely as possible, for the safety of all road users.
This work is weather dependent and could be postponed to a later date if necessary.