UPDATE 13 March: Night Closure planned – State Highway 1 Basin Reserve and Adelaide Road (PLANNED WORKS HAVE BEEN POSTPONED).
These planned works have been postponed and will no longer proceed as scheduled tomorrow night (Thursday, 14 March).
The aim is to carry these works out in April. However, a specific date is still to be finalised. NZTA/Waka Kotahi and the Wellington Transport Alliance will provide an update when details and timings are confirmed.
8 March
Road crews will be hard at work on State Highway 1 near the Basin Reserve next Thursday night (14 March).
Resurfacing works are planned for the intersection of State Highway 1 and Adelaide Road. The work is essential maintenance required for an urban stretch of State Highway 1 that carries around 16 thousand vehicles every day.
While traffic will still be able to travel on State Highway 1 around the Basin Reserve, the entrance and exit from Adelaide Road will be closed between midnight and 5:30am.
Initial works will begin at 7pm and drivers can expect delays while traffic management is put in place.
To ensure disruption is kept to an absolute minimum, the resurfacing will be done at night when traffic volumes are lower.
Local road detours will be available, but drivers can expect longer travel time – especially when travelling between Newtown and the Wellington CBD.
NZTA/Waka Kotahi and the Wellington Transport Alliance want to thank drivers in advance for their patience and cooperation while this work is underway.
Motorists are asked to obey all traffic management controls and temporary speed limits. This ensures everyone, road crews and road users, are kept safe.