Night closure Pelorus/Te Hoiere Bridge, SH6, Marlborough Sounds

|

Waka Kotahi NZ Transport Agency crews will be working at the Pelorus/Te Hoiere Bridge, on SH6, between Nelson and Havelock, for one night in a week’s time: Monday, 13 December.


Stop press - 9 December: This work is not happening on 13 December due to wet weather forecast for that night. We will keep you informed on when it will be rescheduled.


The work will run between 7 pm and 6 am the next day but traffic will be allowed over the bridge at specified intervals. (See below).

If it is wet Monday, the work will transfer to Tuesday.

Waka Kotahi crews will be undertaking asphalt works at the Nelson end of the Bridge.

Updates to the time/date if this work changes (external link)

Can we get over the bridge at all? Yes – hourly and bi-hourly

  • Traffic will be allowed through on the hour with a ten to 15-minute window to get traffic through each way from 7 pm to 10pm. 
  • From 10pm until 4am, traffic will be allowed through every two hours – ie at midnight, 2 am and 4 am. 
  • After 4 am, traffic can get across the bridge on the hour until full opening at 6 am. (5 am then 6 am opening).

Waka Kotahi thanks all drivers who may be inconvenienced by this work for their patience if they have to wait an hour or more.

Tags