Lower North Island/Upper South Island - planned state highway roadworks

|

The details below outline the main planned state highway roadworks occurring in the greater Wellington region and the top of the South Island over the coming week (30 April 2023).

Other important information for road users:

  • Nelson drivers need to plan for a couple of local maintenance projects,
    • There will be resurfacing works on State Highway 6, Whakatu Drive, between the Annesbrook Drive and Quarantine Road roundabouts. Nightworks are planned for Sunday night, 8 pm to 6 am. There will be a northbound lane closure with local detours in place.
    • Cliff stabilisation work is also being done on State Highway 6, Rocks Road - State Highway 6, Rocks Road, cliff stabilisation work(external link)

Further details about regional state highway conditions and roadworks are also published on our website:

NOTE: Roadworks are dependent on weather and other factors. If bad weather should strike, work will be postponed to the next suitable night in the works programme.

Wellington, Porirua, Kāpiti, Hutt

State Highway 1    

SH1 Vivian Street, near Tory Street

  • Sunday to Thursday night, 7 pm-5.30 am
  • One lane closed for various works

SH1 Wellington Urban Motorway, near Hill Street overbridge

  • Sunday to Thursday nights, 7 pm-5.30 am
  • One lane closed each direction for barrier replacement

SH1 North of Ōtaki, rest area bottom of Forest Lakes Hill

  • Sunday to Wednesday nights 7.30 pm-5.30 am
  • Stop/go traffic control for project works

State Highway 59                                                       

SH59 Porirua

  • Sunday to Thursday night, 7 pm-5 am
  • One lane closed for streetlight installation

SH59 Plimmerton, south of Weigh Station

  • Wednesday to Friday during the day, 5.30 am-7 pm
  • One lane closed each direction for power pole replacement

SH59 Paekākāriki, near Transmission Gully merge

  • Sunday to Thursday night, 7 pm-5 am
  • Stop/go traffic control for water works

State Highway 58                                                       

SH58 Paremata - Haywards Road CLOSED(external link) (Between SH1 Transmission Gully interchange and SH2 interchange)

  • 8 pm Friday 28 April to 4 am Monday 1 May
  • CLOSED for road reconstruction works

SH58 Paremata Road, west and east of Postgate Drive

  • Monday night, 7 pm-5.30 am
  • Stop/go traffic control for barrier repairs

SH58 Haywards Hill Road

  • Monday and Tuesday during the day, 9 am-3 pm
  • Stop/go traffic control for various works

State Highway 2                                                      

SH2 Lower Hutt, South of Normandale overbridge 

  • Sunday to Thursday night, 7 pm-5.30 am
  • Southbound one lane closed for electronic sign installation

Wairarapa state highways

State Highway 2                                                          

SH2 Masterton, High Street near S Belt

  • Monday to Friday during the day, 9 am-4 pm
  • Altered lane layout for line-marking

SH2 Between Carterton and Masterton(external link)

  • Northbound and southbound passing lanes closed day/night for safety improvement project works

SH2 South of Greytown, near Bidwills Cutting Road

  • Sunday to Wednesday night, 7 pm-5.30 am
  • Stop/go traffic control for road repairs with water-cutting machine

SH2 North of Greytown, near Hupenui Road

  • Wednesday and Thursday night, 7 pm-5.30 am
  • Stop/go traffic control for roadside levelling

SH2 South of Carterton, near Waihakeke Road

  • Tuesday night, 7 pm-5.30 am
  • Stop/go traffic control for drainage works

SH2 Waingawa

  • Monday to Thursday night, 8 pm-5.30 am
  • Stop/go traffic control for lighting upgrade

SH2 Masterton, North of Cashmere Oaks

  • Monday and Tuesday during the day, 7 am-4 pm
  • Stop/go traffic control for roadside levelling
  • Tuesday and Wednesday during the day, 9 am-3:30 pm
  • Stop/go traffic control for tree trimming

SH2 Opaki, North of Opaki-Kaiparoro Road

  • Wednesday night, 7 pm-5.30 am
  • Stop/go traffic control for road repairs with water-cutting machine

SH2 North of Kiriwhakapapa Road

  • Thursday night, 7 pm-5.30 am
  • Stop/go traffic control for road repairs with water-cutting machine

State Highway 53                                                           

SH53 Featherston, near Donald Street

  • Wednesday during the day, 8 am-4 pm
  • Stop/go traffic control for drainage work

SH53 South Featherston, between Wards Line and Bidwills Cutting Road

  • Wednesday to Friday during the day, 8 am- 4 pm
  • Stop/go traffic control for drainage work

Marlborough state highways

State Highway 1

SH1 Koromiko - Tuamarina

  • Monday – Friday May
  • Resurfacing works

Stop/Go traffic control

State Highway 6                                                          

SH6 Nelson Street, Blenheim(external link)

  • Ongoing until June
  • Watermain works
  • Marlborough District Council project

SH6 Rai Valley to Marlborough Boundary

  • Monday
  • Roadmarking
  • Stop/Go traffic control

State Highway 62

SH62 Spring Creek Roundabout to SH6 Roundabout

  • Tuesday - Friday May
  • Roadmarking
  • Stop/Go traffic control

Nelson/Tasman state highways

State Highway 6

SH6 Dellow’s Bluff, Murchison

  • Traffic management: 50 km/h speed restrictions. Road will be open to two lanes
  • Rockfall area

SH6 Whangamoas

  • Forestry Operations - Long term site,
  • Monday – Friday 6 am – 6 pm. (Except Public Holidays)
  • Traffic Management: Stop/Go traffic lights
  • Expect up to 10 minutes delay

SH6 Gladstone Road, Richmond(external link)

  • Sunday 16 April to Saturday 30 April.
  • Resurfacing work:
  • Nights: Sunday to Saturday, except the night of Monday 24 April to observe Anzac Day
  • Hours of work: 7pm – 7am
  • Traffic management: Stop/Go traffic lights, 30km speed restrictions.
  • Daytime and outside work hours: 30km speed restrictions will remain in place

SH6 Quarantine Road roundabout to Annesbrook Roundabout

  • Nightworks Sunday night to Monday morning. 8pm – 6am
  • Resurfacing work
  • Northbound lane closure – local road detours available

SH6 Rocks Road, Magazine Point area(external link)

  • Sunday to Friday
  • Cliff face maintenance.
  • Nights: Sunday night to Thursday night. 7pm – 6am
  • Traffic management: Stop/Go traffic lights, 30km speed restrictions, one lane.  Potential for some Stop/Stop traffic management for 5 minutes for safety reasons

State Highway 60

SH60 Bird’s Hill, Golden Bay

  • Traffic management: Road is open to two lanes, 50km speed restriction.
  • Project is ongoing
  • Road underslip work

SH60 Takaka, between Reilly Street and Haldane Road

  • 11 April to 12 May.
  • Pavement repairs:
  • Days: Monday to Friday, except public holidays
  • Hours of work: 7.30 am – 6 pm
  • Traffic management: Stop/Go traffic lights, 30 km/h speed restrictions.

Tags