A section of State Highway 2 (SH2) in Dannevirke will be closed to northbound traffic for 4 days, while the road is resurfaced later this month.
This asphalt resurfacing work will take place on SH2 Stanley Street, between Denmark Street and Miller Street from Tuesday 29 October.
During day-time work hours, a detour will be in place for northbound traffic; southbound traffic will continue to flow freely on SH2. The detour is suitable for all vehicle types.
Crews will be working from 6.30am to 5pm each day between Tuesday 29 October and Friday 1 November (weather permitting).
During these work hours, northbound traffic will be detoured via Rawhiti Street, Queen Street, Allan Street and onto Cole Street, before rejoining SH2.
A temporary speed limit of 30km/h will be in place for southbound traffic near the worksite. Outside of work hours, SH2 will be open with a reduced speed limit in place.
This resurfacing work will improve the durability and long-term condition of this section of road. A one-way daytime closure allows crews to complete the work as efficiently and safely as possible while keeping traffic moving, and minimising ongoing disruption and long delay times.
Resident and business access remains and northbound road users are advised to follow the detour to get to your destination. The detour is expected to add less than 5 minutes to journey times.
Thank you for your patience and understanding while we complete this important road renewal work.
We know that a well-maintained state highway network promotes safety and improves options for moving people and freight.
More information about SH2 Dannevirke works
For more information about the 2024/2025 road maintenance season, please visit:
NZTA’s Manawatū-Whanganui maintenance and operations webpage