National Land Transport Programme 2009-2012

Tasman regional NLTP table

Return to Tasman regional tables page

Phase Regional priority Profile Status Work category Indicative FAR* Total phase cost 2009/10 NLTF ($000) 2010/11 NLTF ($000) 2011/12 NLTF ($000) Funding priority Funding source*
Tasman District Council
Renewal of local roads
Road renewals Local Roads     App.     20,041.0 3,132.8 3,343.3 3,344.0   N
Preventive Drainage and Slip Retention Works 2009/12 Construction -   Cat2 241 49% 300.0 49.0 49.0 49.0    
Operation and maintenance of local roads
Road operations and maintenance Local Roads     App.     13,930.1 2,146.7 2,253.5 2,425.5   N
E/Works 08/09 Construction -   Com 141 49% - 196.0 - -   N
E/Works SPR 08/09 Construction -   Com 141 100% - 450.0 - -   N
New & improved infrastructure for local roads
Minor improvements 2009/12 Local Roads     App. 341   - 422.4 398.4 404.6   N
Advance I&D Fees 2009/12 Design - MMM Cat2 324 59% 464.4 88.5 91.5 94.0 Possible N
Improve, expand or replace network group Group allocation     Alloc.       75.0 125.0 125.0    
Bridge Replacement Programme 2009/12 Construction - MMM Cat2 322 59% 360.0 212.4 - - Possible N
Bridge Replacement Programme 2009/12 Construction - MMM Cat2 322 59% 450.0 - 265.5 - Possible N
Bridge Replacement Programme 2009/12 Construction - MMM Cat2 322 59% 440.0 - - 259.6 Possible N
User benefits improvements group Group allocation     Alloc.       - - -    
Eighty Eight Valley Road Seal Extn 2009/10 Construction - LMM Reserve 325 59% 543.0 320.4 - - Res. A  
Gibbs Valley Road Seal Extn Construction - LMM Reserve 325 59% 245.0 - 14.5 130.1 Res. A  
Demand management & community programmes
Tasman District Council Community Programmes 2009/2012 Implementation     App. 432 75% - 142.2 - -   N
Walking and cycling facilities
Richmond Railway Reserve Shared Use Path Construction -   Com 452 59% 335.0 64.9 - -   N
Shared Use Path-School Rd to Community Rd Construction -   Com 452 59% 148.0 17.7 - -   N
Walking and Cycling - Key safety and congestion Group allocation     Alloc.       205.9 205.9 205.9    
Transport planning
Cycling and Walking Strategy 2008/09 Study -   Com 002 75% 26.2 4.4 - -   N
Regional land transport planning management Implementation     App. 001 100% 140.6 48.3 46.1 46.1    
Activity Management Plan 2009/12 Study - ML_ Cat2 003 59% 75.0 - 23.6 20.7   N
Road Transport Studies / Strategies Study - MM_ Cat2 002 59% 175.0 38.4 35.4 29.5   N
Tasman District Council SPR
Renewal of local roads
Road renewals SPR     App.     206.3 91.0 56.9 58.4   N
Operation and maintenance of local roads
Road operations and maintenance SPR     App.     288.1 93.0 96.2 98.9   N
New & improved infrastructure for local roads
Minor improvements 2009/12 SPR     App. 341   - 14.7 10.9 11.0   N
Tasman Highway & Network Operations
Renewal of state highways
Road renewals State Highways     App.     13,008.6 4,486.2 4,261.2 4,261.2   N
Scour Investigation 9/12 Construction 26   Cat2 241 100% 225.0 73.0 75.0 77.0    
Operation and maintenance of state highways
Road operations and maintenance State Highways     App.     23,846.8 7,945.4 7,950.7 7,950.7   N
EW SH 60 Eureka Bend Slump Construction -   Com 141 100% - 245.0 - -   N
EW Storm Tasman Aug 08 Construction -   Com 141 100% - 500.0 - -   N
New & improved infrastructure for State highways
Ruby Bay Bypass A Construction 1   Com 323 100% 28,123.0 13,009.5 4,462.2 698.1   N & R
Ruby Bay Bypass A Property     Com 324 100% 247.0 247.0 - -   N
Doctors Creek Bridge Design     Com   100% 184.7 125.0 - -   N
McGlashen Avenue I/S Construction     Com   100% 4,144.9 1,359.8 - -   N
Minor improvements 2009/12 State Highways     App. 341   - 802.9 837.4 837.4   N
Improve, expand or replace network group Group allocation     Alloc.       2,031.3 2,234.4 2,234.4    
Doctors Creek Bridge Construction 20 MMH Cat2 324 100% 1,673.0 - 673.0 1,000.0 Probable N
Doctors Creek Bridge Investigation 18 MMH Cat2 324 100% 60.0 60.0 - - Probable N
Arnold Bridge Widening Investigation 22 MMM Cat2 322 100% 76.0 - 76.0 - Probable N
Arnold Bridge Widening Design 23 MMM Cat2 322 100% 59.0 - - 59.0 Probable N
Improved Driver Information 9/12 Construction 40 MMM Cat2 321 100% 386.5 125.0 128.8 132.7 Probable N
Pavement Smoothing 9/12 Construction 43 MMM Cat2 324 100% 483.8 163.0 166.9 154.0 Probable N
Pipers to Tunnicliff Realignment Design 24 MMM Cat2 324 100% 31.0 31.0 - - Probable N
Property Acquisitions 9/12 Property 21 MMM Cat2 331 100% 541.9 175.3 180.6 186.0 Probable N
Rehabilitation Seal Widening 9/12 Construction 43 MMM Cat2 324 100% 483.1 156.3 161.0 165.8 Probable N
Safety Retrofit 9/12 Construction 27 MMM Cat2 324 100% 1,449.4 468.9 483.0 497.5 Probable N
Seismic Retrofit 9/12 Construction 30 MMM Cat2 322 100% 605.0 137.0 468.0 - Probable N
SH6 Aniseed Valley/Eden Road I/S Investigation 25 MMM Cat2 324 100% 99.0 99.0 - - Probable N
SH6 Aniseed Valley/Eden Road I/S Design 28 MMM Cat2 324 100% 89.0 - 89.0 - Probable N
SH60 Robinson Road I/S Investigation 29 MMM Cat2 324 100% 85.0 - - 85.0 Probable N
Strategic Plan Initiatives 9/12 Construction 39 MMM Cat2 324 100% 1,159.5 375.1 386.4 398.0 Probable N
Tasman Region PL Investigation 42 MMM Cat2 324 100% 124.0 124.0 - - Probable N
Tasman Region PL Design 44 MMM Cat2 324 100% 127.0 - 127.0 - Probable N
Tasman Region PL Construction 45 MMM Cat2 324 100% 765.0 - - 765.0 Probable N
Demand management & community programmes
Community Advertising 9/12 - Tasman Implementation     App. 432 100% - 19.1 - -   N
Walking and cycling facilities
Walking and Cycling - Access and community benefits Group allocation     Alloc.       - - -    
SH6 Aniseed Valley to Brightwater Cycle Lanes Investigation 32 LMM Reserve 452 100% 96.0 96.0 - -   Res. A
SH6 Aniseed Valley to Brightwater Cycle Lanes Design 34 LMM Reserve 452 100% 86.5 - 86.5 -   Res. A
SH6 Aniseed Valley to Brightwater Cycle Lanes Construction 36 LMM Reserve 452 100% 1,103.3 - - 1,103.3   Res. A
SH6 Richmond to Aniseed Valley Cycle Lane Widening Investigation 33 LMM Reserve 452 100% 96.0 96.0 - -   Res. A
SH6 Richmond to Aniseed Valley Cycle Lane Widening Design 35 LMM Reserve 452 100% 86.5 - 86.5 -   Res. A
SH6 Richmond to Aniseed Valley Cycle Lane Widening Construction 37 LMM Reserve 452 100% 979.5 - - 979.5   Res. A
Transport planning
Motueka Transportation Study Study     Com 002 100% 100.0 100.0 - -   N
Activity management plans Study     Cat2 003 100% 611.4 198.2 206.6 206.6   N
Tasman safe, Sustainable and Efficient Routes Study 31 MM_ Cat2 002 100% 100.0 34.0 33.0 33.0   N