Transmission Gully update – 11 March 2022 11 March 2022 4:17 pm | Waka Kotahi NZ Transport Agency CPB HEB, the company subcontracted to build Transmission Gully, has now had 67 of the 81 remaining safety and quality assurance tests required before the road can open accepted as meeting the required standards.