DV2 underslip aerial of completed worksite 20 March 2024. DV2 underslip completed retaining wall and culvert 20 March 2024 - image 1 DV2 underslip completed retaining wall and culvert 20 March 2024 - image 2 SH16 Cleasby Hill Lookout slips - northbound aerial shot showing repair works underway 20 March 2024. SH16 Cleasby Hill Lookout slips - repair work is underway 20 March 2024. SH16 Cleasby Hill Lookout slips - significant earthworks are underway 20 March 2024. Work involves the construction of a retaining wall to repair the underslip on the northbound lane and a road realignment on the southbound lane. SH16 Cleasby Hill Lookout slips - southbound aerial shot showing repair works underway 20 March 2024. DV6 completed upslope stabilisation. This involved the removal of slip material and construction of a new retaining wall.
DV2 underslip after Cyclone Gabrielle DV2 underslip retaining wall June 2023 DV6 overslip February 2023 - image 1 DV6 overslip February 2023 - image 2 DV6 overslip February 2023 - image 3 DV6 overslip February 2023 - image 4 DV6 overslip February 2023 - image 5 DV6 overslip loading material February 2023 DV8 overslip - constructing the retaining wall to protect from rock slips. This wall was constructed in 4 days to get the road open. DV8 overslip retaining wall July 2023 DV8 overslip clearing material DV8 overslip retaining wall DV8 second overslip rockfall, spilling over the temporary barrier and onto the road.