RUC FOR ELECTRIC VEHICLES: Road user charges now apply to EVs and plug-in hybrids
SCAM ALERTS: We’ve seen an increase in scam texts and emails claiming to be from NZTA, asking for payments. Learn more about the latest phishing scams or report a phishing scam to us
Road foundation work on the SH6 Luggate to Wanaka link into the Mt Iron roundabout. A stunning drone photo of the new Mt Iron roundabout. Mesh laying as part of road foundation work on the SH6 Luggate to Wanaka leg of the Mt Iron roundabout. Compacting part of the newly formed road on the SH6 Luggate to Wanaka Lane showing eastbound lane still operating. The newly formed road on one lane of the SH6 leg looking towards Cardrona Bridge. Both lanes of Luggate-Cromwell leg of roundabout in operation. Vehicles using the newly completed Luggate-Cromwell leg of Mt Iron roundabout.
Construction of structural asphalt area on Riverbank Road leg of the new roundabout. Westbound lane construction on the SH6 Cromwell approach to the roundabout. The final stages of footpath preparations alongside the roundabout. Traffic heading towards Cromwell on the new roundabout.
Darren Rewi from Mana Tāhuna (right) performed an iwi blessing on the site ahead of works starting. He was joined by invited guests including deputy mayor Quentin Smith (second right).