National Land Transport Programme 2009-2012

Wellington regional NLTP table

Return to Wellington regional tables page

Phase Regional priority Profile Status Work category Indicative FAR* Total phase cost 2009/10 NLTF ($000) 2010/11 NLTF ($000) 2011/12 NLTF ($000) Funding priority Funding source*
Carterton District Council
Renewal of local roads
Road renewals Local Roads App. 4,247.0 722.7 724.5 761.2 N
Operation and maintenance of local roads
Road operations and maintenance Local Roads App. 3,559.3 618.6 620.5 635.2 N
Operation and maintenance of local roads
Minor improvements 2009/12 Local Roads App. 341 - 107.3 95.7 97.9 N
User benefits improvements group Group allocation Alloc. - - -
Short St S.E Construction - LMM Reserve 325 62% 100.0 - 62.0 - Res. A
Parkers Rd SE Construction - LMM Reserve 325 62% 167.0 - - 103.5 Res. A
Transport planning
Procurement Strategy Study 2 MM_ Cat2 003 75% 15.0 11.3 - - N
Greater Wellington
Public transport infrastructure
Real Time Passenger Information System Construction -1 Com 531 80% 10,850.0 3,880.0 3,560.0 1,160.0 R & C1
Stations - Kapiti Stations Upgrade and Modifications Construction -1 Com 531 90% 15,000.0 2,187.0 2,700.0 - C2
Stations - Platform, Buildings, Carparks and Security Construction -1 Com 532 90% 13,000.0 1,292.9 720.0 - N & C1
Stations - Platform, Buildings, Carparks and Security Design -1 Com 532 90% 424.0 5.7 - - N & C1
Regional Rail Plan - Passenger Rail Improvements Construction 33 HHL Cat2 531 60% 177,786.5 - - 6,813.9 Probable N/C1/C2
Electronic Ticketing Construction 315 MML Cat2 531 60% 15,063.3 - - 190.8 Probable N/C1
Electronic Ticketing Investigation 2 MML Cat2 531 60% 731.5 - 216.3 222.6 Probable N/C1
Urban transport choice, network improvements & safety PT group Group allocation Alloc. 175.0 170.0 200.0
Public Transport asset maintenance and renewals >$20k Construction - MMM Cat2 531 60% 288.1 172.9 - - Probable R/N
Public Transport asset maintenance and renewals >$20k Construction - MMM Cat2 531 60% 2,457.7 - 166.8 199.9 Probable R/N
Public transport services
Bus & ferry concession fares Operations App. 513 50% 3,583.5 578.5 597.0 616.2 N
Bus services Operations App. 511 50% 123,748.4 20,624.7 20,624.7 20,624.7 N
Passenger ferry services Operations App. 512 50% 856.2 142.7 142.7 142.7 N
Passenger rail services Operations App. 515 60% 94,710.2 14,956.9 18,501.7 23,367.6 N
Public transport facilities maintenance and operations Operations App. 514 60% 11,150.9 2,413.9 2,078.5 2,198.1 N
Public transport professional services/ administration Operations App. 50% 25,469.3 4,214.0 4,214.8 4,305.8 N
Total mobility flat payments Operations App. 521 100% 561.0 187.0 187.0 187.0 N
Total mobility operations Operations App. 517 50% 5,710.1 977.6 938.7 938.7 N
Wheelchair hoists Operations App. 519 60% 142.1 27.6 28.4 29.3 N
Bus Service Improvements Implementation 311 MMM Cat2 511 50% - - - 1,068.4 Possible N
Demand management & community programmes
Travel Behaviour Change Programme Implementation Com 432 75% - 976.7 - - N
Travel Behaviour Change Programme (Outyears) Implementation Cat2 432 75% - - - - N
Transport planning
Wgtn-Public Transport Model Development Study -1 Com 002 75% 160.0 120.0 - - N
Regional land transport planning management Implementation App. 001 100% 993.8 341.7 326.2 325.9
Wgtn-Airport PT Feasability Study Study 2 HM_ Cat2 002 75% 1,000.0 - - 562.5 N
Wgtn-Strategic Transport Model Upgrade Study 2 HM_ Cat2 002 75% 1,820.9 - 755.5 453.1 N
Supergold card
Supergold trip adminstration Implementation App. 90.0 30.0 30.0 30.0
Supergold trip payments Implementation App. 11,880.0 4,000.0 3,940.0 3,940.0
Hutt City Council
Renewal of local roads
Road renewals Local Roads App. 21,189.0 3,295.6 3,295.6 3,367.6 N
Operation and maintenance of local roads
Road operations and maintenance Local Roads App. 18,039.1 2,812.5 2,838.5 2,838.5 N
New & improved infrastructure for local roads
Ngauranga Triangle (Grenada to Gracefield) Strategic Study Investigation -1 Com 311 75% 250.0 112.5 - - N
Minor improvements 2009/12 Local Roads App. 341 - 488.7 436.6 435.2 N
Improve, expand or replace network group Group allocation Alloc. 150.0 150.0 200.0
Smoothing 2009-10 Construction - MMH Cat2 324 57% 342.0 194.9 - - Probable R
Smoothing 2010-11 Construction - MMH Cat2 324 57% 342.0 - 194.9 - Probable R
Smoothing 2011-12 Construction - MMH Cat2 324 57% 342.0 - - 194.9 Probable R
Cuba Street Bridge Construction - MML Reserve 322 57% 500.0 - - 285.0 Res. A
Demand management & community programmes
Hutt City Community Focused Activities 09/12 Implementation App. 432 75% - 64.1 - - N
Walking and cycling facilities
Walking and Cycling - Key safety and congestion Group allocation Alloc. 109.9 109.9 109.9
Walking and Cycling - Access and community benefits Group allocation Alloc. - - -
(New) Wainuiomata Hill Road Shared Path Construction 2 LML Reserve 452 57% 800.0 - - 456.0 Res. A
Transport planning
FWD Surveys Study 2 MH_ App. 003 57% 20.0 11.4 - - N
Network Efficiency Study Study 2 MH_ App. 003 57% 40.0 22.8 - - N
Asset Revaluation Study 2 MH_ Cat2 003 57% 90.0 - - 17.1 N
d'TIMS Modeling Study 2 MM_ Cat2 003 57% 126.0 3.4 3.4 14.8 N
Kapiti Coast District Council
Renewal of local roads
Road renewals Local Roads App. 6,955.4 1,135.6 921.7 933.5 N
Preventative Mtce - Raumati Sth Costal Erosion Construction - Com 241 43% 80.0 3.9 - -
Preventative Mtce - Paekakariki Costal Erosion Construction - Cat2 241 43% 1,540.0 60.2 60.2 60.2
Operation and maintenance of local roads
Road operations and maintenance Local Roads App. 6,773.7 972.2 979.0 989.4 N
New & improved infrastructure for local roads
Western Link Road Investigation 31 Com 323 48% 1,649.0 48.0 - - N
Western Link Road ALP Construction 31 Com 333 90% 29,900.0 13,510.4 - - R & C1
Minor improvements 2009/12 Local Roads App. 341 - 168.6 135.3 134.8 N
Western Link Road ALP, Ihakara Street Ext. connection to WLR Stage 1 Construction 31 HML Cat2* 333 53% 1,200.0 - - 636.0 Probable N/C2
Western Link Road ALP, Stage 3 Construction 35 HML Cat2* 333 53% 5,000.0 530.0 2,120.0 - Probable N
Western Link Road Construction- Ihakara Street link to the WLR Construction 31 HML Cat2* 323 90% 9,100.0 - - 8,190.0 Possible R/N
Western Link Road Construction Stage 1 Construction 31 HML Cat2* 323 90% 80,000.0 14,400.0 14,400.0 14,400.0 Probable N/C2
Western Link Road Construction Stage 1 Pre - Construction Construction 31 HML Cat2* 323 90% 500.0 360.0 90.0 - Probable N/C2
Western Link Road Construction Stage 3 Construction 35 HML Cat2* 323 53% 26,000.0 - 4,558.0 4,611.0 Possible R/N
Western Link Road, Ihakara Street Connection to WLR Stage 1 Design 31 HML Cat2* 323 53% 300.0 - 159.0 - Possible R/N
Western Link Road, Ihakara Street extension connection to WLR Stage 1 Investigation 2 HML Cat2* 323 53% 200.0 53.0 53.0 - Possible R/N
Western Link Road, Stage 3 Design 35 HML Cat2* 323 53% 2,000.0 - 530.0 530.0 Possible R/N
Western Link Road, Stage 3 Investigation 2 HML Cat2* 323 53% 1,000.0 265.0 265.0 - Possible R/N
Improve, expand or replace network group Group allocation Alloc. 350.0 550.0 350.0
Arawhata Road / Kapiti Road Design - MMH Cat2 324 53% 50.0 - 26.5 - Probable R
Arawhata Road / Kapiti Road Construction - MMH Cat2 324 53% 600.0 - - 291.5 Probable R
Kapiti/Rimu Intersection Construction - MMM Cat2 324 53% 1,300.0 344.5 344.5 - Possible R/N
Matatua Stream Bridge Construction - MMM Cat2 322 53% 2,200.0 1,166.0 - - Possible R/N
KCDC Strategic Advanced Land Purchase Property - MMM Cat2 333 53% 492.0 85.3 86.9 88.5 Possible R/N
Demand management & community programmes
Community Programmes - KCDC Implementation App. 432 75% - 142.6 - - N
Walking and cycling facilities
Cycleway Construction Construction -1 Com 452 53% 368.5 2.7 - - N
Walking and Cycling - Key safety and congestion Group allocation Alloc. 146.9 146.9 146.9
Cycleway Facility Construction 2 MMM Cat2 452 53% 1,386.0 510.9 111.3 112.4 Possible R/N
Transport planning
Activity Management Plan Review Study 2 ML_ Cat2 003 53% 652.0 125.1 93.8 126.7 N
Crash Reduction Study Study 2 MM_ Cat2 002 75% 34.0 - 25.5 - N
Procurement Strategy Development Study 2 MM_ Cat2 003 75% 30.0 22.5 - - N
Strategy Studies Study - N/F
Masterton District Council
Renewal of local roads
Road renewals Local Roads App. 11,137.9 2,059.6 2,020.5 2,045.8 N
Operation and maintenance of local roads
Road operations and maintenance Local Roads App. 6,909.7 1,265.5 1,286.8 1,289.9 N
E/works 08/09 Construction - Com 141 55% - 165.0 - - N
New & improved infrastructure for local roads
Minor improvements 2009/12 Local Roads App. 341 - 266.0 235.4 233.9 N
Improve, expand or replace network group Group allocation Alloc. - 200.0 150.0
Manawa No3 Bridge Construction - MMM Cat2 322 65% 370.0 240.5 - - Possible R/N
Masterton Eastern Bypass Design 318 MMM Cat2 324 65% 300.0 - - 195.0 Possible R/N
Demand management & community programmes
Wairarapa Road Safety 09/12 Implementation App. 432 75% - 109.6 - - N
Transport planning
Forestry Roading Study Study 2 MM_ Cat2 002 75% 70.0 52.5 - - N
Masterton AMP Updates and Improvements Study 2 ML_ Cat2 003 65% 400.0 26.0 26.0 26.0 N
Masterton Crash Reduction Study Study 2 MM_ Cat2 002 75% 40.0 - - 15.0 N
Masterton Cycle & Pedestrian Strategy & Implementation Plans Study - N/F
Porirua City Council
Renewal of local roads
Road renewals Local Roads App. 3,362.7 479.4 497.3 502.9 N
Preventive Maint - Paekakriki Hill Road Construction - Com 241 44% 263.0 115.7 - -
PREVENTATIVE MAINTENANCE 2009-2012 Construction - Cat2 241 44% 500.0 132.0 44.0 44.0
Operation and maintenance of local roads
Road operations and maintenance Local Roads App. 6,222.1 907.1 923.4 932.5 N
New & improved infrastructure for local roads
Minor improvements 2009/12 Local Roads App. 341 - 110.9 101.1 100.7 N
Improve, expand or replace network group Group allocation Alloc. - 50.0 200.0
Airlie Road's Bridge - Renewal Construction - MMM Cat2 322 54% 1,095.0 54.0 537.3 - Possible R/N
Demand management & community programmes
Community Programmes 2009/12 Implementation App. 432 75% - 131.3 - - N
Walking and cycling facilities
Pauatahanui - Camborne Cycleway\Walkway Construction - Com 452 54% 175.0 35.3 - - N
Walking and Cycling - Access and community benefits Group allocation Alloc. - - -
Camborne to Motukaraka Point Cycleway Construction 2 LMM Reserve 452 54% 500.0 - 270.0 - Res. A
Transport planning
Transportation Study Study - Com 002 54% 105.0 21.6 - - N
Transport Planning 2009/2012 Study 2 MM_ Cat2 002 75% 120.0 30.0 30.0 30.0 N
South Wairarapa District Council
Renewal of local roads
Road renewals Local Roads App. 3,582.8 579.7 586.7 589.2 N
Operation and maintenance of local roads
Road operations and maintenance Local Roads App. 5,951.4 956.9 975.4 990.0 N
New & improved infrastructure for local roads
Minor improvements 2009/12 Local Roads App. 341 - 122.9 111.2 110.7 N
Improve, expand or replace network group Group allocation Alloc. - - 230.0
Burlings Bridge Replacement - Western Lake Road Construction - MMH Cat2 322 59% 400.0 - - 236.0 Probable R
User benefits improvements group Group allocation Alloc. - - -
Wharekauhau Road (Stage 3) Construction - LMH Reserve 325 59% 300.0 177.0 - - Res. A
Moroa Road (Stage 1) Construction - LMH Reserve 325 59% 300.0 - 177.0 - Res. A
Moroa Road (Stage 2) Construction - LMH Reserve 325 59% 300.0 - - 177.0 Res. A
South Wairarapa District Council SPR
Renewal of local roads
Road renewals SPR App. 841.0 265.0 280.0 296.0 N
Operation and maintenance of local roads
Road operations and maintenance SPR App. 1,212.0 385.0 402.0 425.0 N
New & improved infrastructure for local roads
Minor improvements 2009/12 SPR App. 341 - 52.0 48.5 50.6 N
Upper Hutt City Council
Renewal of local roads
Road renewals Local Roads App. 4,642.2 713.9 685.0 690.1 N
Operation and maintenance of local roads
Road operations and maintenance Local Roads App. 6,024.9 914.5 917.8 928.9 N
New & improved infrastructure for local roads
Minor improvements 2009/12 Local Roads App. 341 - 130.3 114.1 113.5 N
Improve, expand or replace network group Group allocation Alloc. 50.0 400.0 300.0
SH2/Gibbons Street to CBD Network Upgrade Construction - MMM Cat2 324 55% 30.9 - 17.0 - Possible R/N
Akatarawa Road Safety Upgrade Construction - MMM Cat2 324 55% 885.2 - 308.1 - Possible R/N
Alexander Road Streetlight Installation Construction - MMM Cat2 324 55% 128.7 - - 70.8 Possible R/N
Totara Park Bridge Construction - MMM Cat2 322 55% 329.2 - 181.1 - Possible R/N
Akatarawa Bridge Replacement Construction - MMM Cat2 322 55% 1,000.0 550.0 - - Possible R/N
Akatarawa Road Bridge Replacement B1/4 Construction - MMM Cat2 322 55% 1,055.3 - - 580.4 Possible R/N
Demand management & community programmes
Community Road Safety Programme 2009/2012 Implementation App. 432 75% - 68.8 - - N
Walking and cycling facilities
Walking and Cycling - Key safety and congestion Group allocation Alloc. 54.9 54.9 54.9
Pedestrian Improvements Construction 2 MMM Cat2 451 55% 71.0 19.3 19.8 - Possible R/N
SH2/Hutt River Trail Extension Construction 2 MMM Cat2 452 55% 641.6 - - 352.9 Possible R/N
Transport planning
SH2/Gibbons Street to CBD Scenario Modelling Study 2 MM_ Cat2 002 75% 154.3 - 115.7 - N
Walking and Cycling Strategy Study 2 MM_ Cat2 002 75% 94.7 - 71.0 - N
Wellington City Council
Renewal of local roads
Road renewals Local Roads App. 33,709.2 4,597.1 4,836.4 5,061.5 N
Preventative Maintenance Construction - Cat2 241 43% 4,527.0 731.0 607.2 608.5
Road Risk Mitigation Construction - Cat2 241 53% 1,452.0 - 384.8 384.8 N
Road Risk Mitigation Design - Cat2 241 53% 100.0 26.5 26.5 - N
Operation and maintenance of local roads
Road operations and maintenance Local Roads App. 34,186.1 4,914.3 4,914.3 4,914.3 N
New & improved infrastructure for local roads
Ngaio Gorge Road Risk Mitigation Construction - Com 322 53% 2,640.0 159.0 356.6 - N
Ngaio Gorge Road Risk Mitigation Construction - Com 322 53% 850.0 291.5 - - N
Ngauranga Triangle (Grenada to Gracefield) Strategic Study Study -1 Com 311 75% 250.0 112.5 - - N
Safer Roads 08/09 Construction - Com 324 53% 850.0 212.0 - - N
Minor improvements 2009/12 Local Roads App. 341 - 760.9 694.1 699.5 N
Westchester To Glenside Construction 317 MMM Cat2 323 53% 8,000.0 - - 2,120.0 Possible R/N
Improve, expand or replace network group Group allocation Alloc. 750.0 900.0 900.0
SaferRoads Berhampore Construction - MMH Cat2 324 53% 1,000.0 530.0 - - Probable R
Pavement Smoothing 2009 - 2012 Construction - MMM Cat2 324 53% 3,780.0 667.8 667.8 667.8 Possible R/N
SaferRoads Te Aro Construction - MMM Cat2 324 53% 3,000.0 - 530.0 530.0 Possible R/N
Advance Fees Investigation - MMM Cat2 324 53% 600.0 106.0 106.0 106.0 Possible R/N
Public transport infrastructure
Bus Priority Construction -1 Com 533 53% 10,645.0 1,232.3 853.3 768.5 N
Demand management & community programmes
Community Activities 09/12 Implementation App. 432 75% - 269.9 - - N
Walking and cycling facilities
Walking and Cycling - Key safety and congestion Group allocation Alloc. 508.8 508.8 508.8
Cycle facilities Construction 2 MML Reserve 452 53% 2,400.0 424.0 424.0 424.0 Res. A
Pedestrian Facilities Construction 2 MML Reserve 451 53% 2,400.0 424.0 424.0 424.0 Res. A
Wellington Highway & Network Operations
Renewal of state highways
Road renewals State Highways App. 20,537.7 6,908.5 6,814.6 6,814.6 N
Preventive Maintenance 9/12 Construction 1 Cat2 241 100% 323.4 96.8 113.3 113.3
Scour Investigation 9/12 Construction 2 Cat2 241 100% 183.0 59.0 61.0 63.0
Operation and maintenance of state highways
Road operations and maintenance State Highways App. 64,508.5 21,493.3 21,507.6 21,507.6 N
New & improved infrastructure for State highways
Basin Reserve Improvements Investigation 32 Com 323 100% 2,600.0 1,301.8 1,298.2 - N
Dowse to Petone I/C Construction -1 Com 324 100% 82,486.8 9,559.7 - - N
Dowse to Petone I/C Property Com 323 100% 385.0 85.4 299.6 - N
Melling I/C Investigation 34 Com 323 100% 3,100.0 1,198.9 1,901.1 - N
Mt Victoria Tunnel - Safety Improvements Design 38 Com 322 100% 3,700.0 2,060.9 1,639.1 - N
Rimutaka Corner Easing (Muldoon's) Construction -1 Com 324 100% 16,500.0 3,703.5 5,103.6 5,155.2 R
Rimutaka Corner Easing (Muldoon's) Design - Com 324 100% 723.0 52.5 - - R
SH2 Moonshine Hill Rd - Silverstream Safety Improvements Design 37 Com 324 100% 252.4 252.4 - - N
SH2/58 Grade Separation Design 310 Com 324 100% 1,500.0 1,500.0 - - R
Terrace Tunnel - Safety Improvements Design 39 Com 322 100% 3,600.0 - - 2,157.5 N
Transmission Gully Investigation Investigation -1 Com 323 100% 4,246.4 2,126.1 2,120.3 - N
Transmission Gully Investigation Property -1 Com* 331 100% 40,393.4 5,329.6 5,494.8 11,736.5 N
Carterton Roundabouts SH2 - Park Road / Belvedere Road Construction Com 100% 220.0 32.5 - - R
Johnsonville to Tawa lighting Investigation Com 100% 85.0 40.0 - - N
MacKays Crossing to Centennial Highway Safety Improvements Investigation Com 100% 282.1 7.7 - - N
Moonshine Intersections Improvements Construction Com 100% 5,502.9 181.0 - - N
Ngauranga to Terrace Tunnel ATMS Construction Com 100% 4,397.7 500.0 - - N
Otaihanga to Waikanae Safety Improvements Investigation Com 100% 175.1 24.9 - - N
Otaki Roundabout Construction Com 100% 802.9 23.5 - - N
Petone to Ngauranga ATMS Construction Com 100% 3,900.0 1,000.0 700.0 - N
SH1 Otaki to Waikanae SB PL Construction Com 100% 4,326.7 2,166.3 - - N
SH2 Moonshine Hill Rd - Silverstream Safety Improvements Investigation Com 100% 184.9 20.0 - - N
Waikanae Transport Interchange Investigation Com 100% 900.0 400.0 - - N
Wellington Region Variable Message Signs Construction Com 100% 3,900.0 1,500.0 500.0 - N
Minor improvements 2009/12 State Highways App. 341 - 1,834.4 1,942.2 1,942.2 N
SH2 Moonshine Hill Rd - Silverstream Safety Improvements Property 37 MMM App. 331 100% 43.3 43.3 - - Probable R/N
Melling I/C Design 34 MMH Cat2 323 100% 4,214.5 - - 2,080.4 Probable R
Basin Reserve Improvements Design 32 HML Cat2 324 100% 2,218.1 - - 1,097.2 Probable R/N
Basin Reserve Improvements Property 32 HML Cat2 331 100% 1,109.5 - 265.4 274.1 Probable R/N
Kapiti Western Link Southern Connection Design 35 HML Cat2 323 100% 1,663.7 - - 817.7 Probable C2
Kapiti Western Link Southern Connection Investigation 2 HML Cat2 323 100% 1,045.4 515.7 529.7 - Probable C2
Kapiti Western Link Southern Connection Property 35 HML Cat2 331 100% 6,862.8 - 1,051.1 1,098.1 Probable C2
Levin to Airport Road of National Significance Development Investigation 2 HML Cat2 324 100% 10,000.0 3,000.0 4,000.0 3,000.0 Probable R/N
Levin to Airport Road of National Significance Development Property 2 HML Cat2 323 100% 9,671.0 - 4,730.0 4,941.0 Probable R/N
MacKays Crossing to Centennial Highway Safety Improvements Construction 36 HML Cat2 324 100% 6,453.7 - 2,657.3 3,796.4 Probable R/N
MacKays Crossing to Centennial Highway Safety Improvements Design 36 HML Cat2 324 100% 360.5 360.5 - - Probable R/N
MacKays Crossing to Centennial Highway Safety Improvements Property 36 HML Cat2 331 100% 412.0 412.0 - - Probable R/N
Mt Victoria Tunnel - Safety Improvements Construction 38 HML Cat2 322 100% 40,524.8 - - 9,879.5 Probable R/N
Ngauranga to Aotea Quay Traffic Management Construction HML Cat2 323 100% 30,567.4 - - 4,939.2 Probable R/N
Ngauranga to Aotea Quay Traffic Management Design 313 HML Cat2 323 100% 1,169.7 - 895.5 274.2 Probable R/N
Ngauranga to Aotea Quay Traffic Management Investigation 2 HML Cat2 323 100% 1,568.0 777.4 790.6 - Probable R/N
Ngauranga to Aotea Quay Traffic Management Property 313 HML Cat2 331 100% 1,045.3 519.0 526.3 - Probable R/N
SH1 Mount Victoria Tunnel Duplication Investigation 2 HML Cat2 322 100% 5,497.2 - 1,060.4 2,192.9 Probable R/N
SH2 Moonshine Hill Rd - Silverstream Safety Improvements Construction 37 MMM Cat2 324 100% 5,740.7 - 1,692.2 4,048.5 Probable R/N
SH2/58 Grade Separation Construction 310 HML Cat2 324 100% 40,854.5 - 22,303.6 18,550.9 Probable C1
Transmission Gully Investigation Investigation -1 HML Cat2 323 100% 7,725.0 7,725.0 - - Probable C3
Waihenga Bridge Replacement Design 2 MMM Cat2 322 100% 546.4 - - 546.4 Probable R/N
Waihenga Bridge Replacement Investigation 2 MMM Cat2 322 100% 265.2 - 265.2 - Probable R/N
Waikanae Transport Interchange Design 312 HML Cat2 323 100% 1,367.4 254.7 265.4 274.1 Probable C2
Waikanae Transport Interchange Property 312 HML Cat2 331 100% 1,066.6 344.2 354.3 182.1 Probable R/N
SH58: SH2 - Pauatahanui Safety Improvements Design 316 MML Cat2 324 100% 2,185.0 - - 2,185.0 Possible N
SH58: SH2 - Pauatahanui Safety Improvements Investigation 2 MML Cat2 324 100% 1,030.0 1,030.0 - - Possible N
SH2 Brown Owl - Fergusson Drive Safety Improvements Investigation 2 LML Reserve 324 100% 2,000.0 - - 1,000.0 Res. A
Strategic network group Group allocation Alloc. 1,343.8 1,478.1 1,478.1
Johnsonville to Tawa lighting Design 2 HML Cat2 324 100% 34.0 34.0 - - Probable R/N
Otaihanga to Waikanae Safety Improvements Design 2 HML Cat2 324 100% 90.0 90.0 - - Probable R/N
Otaihanga to Waikanae Safety Improvements Construction 2 HML Cat2 324 100% 3,187.0 - 1,032.0 1,066.0 Probable R/N
Plimmerton to Paremata Strategic Review Investigation 2 HML Cat2 321 100% 52.0 52.0 - - Probable R/N
Plimmerton to Paremata Strategic Review Design 2 HML Cat2 321 100% 106.0 - 106.0 - Probable R/N
Plimmerton to Paremata Strategic Review Construction 2 HML Cat2 321 100% 983.0 - - 983.0 Probable R/N
SH1 Forest Lakes Safety Improvements Investigation 2 HML Cat2 324 100% 198.0 - 198.0 - Probable R/N
SH1 Forest Lakes Safety Improvements Design 2 HML Cat2 324 100% 201.0 - - 201.0 Probable R/N
SH1 Raumati Straight Improvements Investigation 2 HML Cat2 324 100% 133.0 133.0 - - Probable R/N
SH1 Raumati Straight Improvements Design 2 HML Cat2 324 100% 205.0 - 205.0 - Probable R/N
SH1 Troy Street I/S Design 2 HML Cat2 324 100% 53.6 - 53.6 - Probable R/N
SH1 Troy Street I/S Construction 2 HML Cat2 324 100% 653.5 - - 653.5 Probable R/N
Improve, expand or replace network group Group allocation Alloc. 3,062.5 3,368.8 3,368.8
Electronic Warning Signs Construction 2 MMH Cat2 321 100% 218.0 218.0 - - Probable R
SH2 Buchanans Road I/S Investigation 2 MMH Cat2 324 100% 118.0 118.0 - - Probable R
SH2 Buchanans Road I/S Design 2 MMH Cat2 324 100% 425.0 - 425.0 - Probable R
SH2 Melling Link / Block Rd I/S Intertim Improveme Investigation 2 MMH Cat2 324 100% 116.0 116.0 - - Probable R
SH2 Melling Link / Block Rd I/S Intertim Improveme Design 2 MMH Cat2 324 100% 143.0 - 143.0 - Probable R
SH2 Melling Link / Block Rd I/S Intertim Improveme Construction 2 MMH Cat2 324 100% 2,828.0 - - 1,400.0 Probable R
SH2 Moonshine Road to Gibbons Safety Improvements Investigation 2 MMH Cat2 324 100% 133.0 133.0 - - Probable R
SH2 Moonshine Road to Gibbons Safety Improvements Design 2 MMH Cat2 324 100% 132.0 - 132.0 - Probable R
Crash Reduction Studies 9/12 Construction 2 MMM Cat2 324 100% 844.2 273.1 281.3 289.8 Probable R/N
Improved Driver Information 9/12 Construction 2 MMM Cat2 321 100% 607.2 196.5 202.4 208.4 Probable R/N
Property Acquisitions 9/12 Property 2 MMM Cat2 331 100% 1,175.4 380.3 391.7 403.4 Probable R/N
Rehabilitation Seal Widening 9/12 Construction 2 MMM Cat2 324 100% 759.0 245.6 252.9 260.5 Probable R/N
Safety Retrofit 9/12 Construction 2 MMM Cat2 324 100% 2,277.1 736.7 758.8 781.6 Probable R/N
Seismic Retrofit 9/12 Construction 2 MMM Cat2 322 100% 2,402.0 250.0 2,122.0 30.0 Probable R/N
SH2 Norfolk Road I/S Investigation 2 MMM Cat2 324 100% 104.0 104.0 - - Probable R/N
SH2 Norfolk Road I/S Design 2 MMM Cat2 324 100% 94.0 - 94.0 - Probable R/N
Strategic Plan Initiatives 9/12 Construction 2 MMM Cat2 324 100% 1,821.7 589.4 607.1 625.3 Probable R/N
Kennedy Good Bridge to SH58 lighting Investigation 2 MML Cat2 324 100% 52.0 52.0 - - Possible N
Kennedy Good Bridge to SH58 lighting Design 2 MML Cat2 324 100% 51.0 - 51.0 - Possible N
Otaki to Waikanae SB PL Construction 2 MML Cat2 324 100% 1,571.3 1,571.3 - - Possible N
Terrace Tunnel - Safety Improvements Construction 39 Reserve 47,326.4 Res. B
Transmission Gully Investigation Design -1 Reserve 34,272.9 Res. B
Basin Reserve Improvements Construction Reserve 41,172.0 Res. B
Kapiti Western Link Southern Connection Construction 35 Reserve 27,267.1 Res. B
Melling I/C Construction Reserve 68,428.5 Res. B
Otaki Bypass Construction Reserve 135,036.2 Res. B
Otaki to Peka Peka Construction Reserve 113,000.0 Res. B
Peka Peka to Mackays Construction Reserve 165,000.0 Res. B
SH1 Mount Victoria Tunnel Duplication Design Reserve 6,619.4 Res. B
SH1 Mount Victoria Tunnel Duplication Property Reserve 8,826.8 Res. B
TG to SH2 Link Design Reserve 3,020.8 Res. B
TG to SH2 Link Property Reserve 1,957.8 Res. B
Transmission Gully Investigation Construction Reserve 1,415,598.0 Res. B
Waihenga Bridge Replacement Construction Reserve 9,217.7 Res. B
Waikanae to Mackays Construction Reserve 205,802.0 Res. B
Waikanae Transport Interchange Construction 312 Reserve 44,291.5 Res. B
Otaki Bypass Investigation Reserve 8,093.0 Res. B
Otaki Bypass Property Reserve 16,342.0 Res. B
SH1 Mount Victoria Tunnel Duplication Construction Reserve - Res. B
TG to SH2 Link Construction Reserve 84,510.0 Res. B
TG to SH2 Link Investigation Reserve 2,154.0 Res. B
Pukerua Bay - Intersection & Pedestrian Facility Improvement Construction - N/F
Pukerua Bay - Intersection & Pedestrian Facility Improvement Design - N/F
Demand management & community programmes
Community Advertising 9/12 - Wellington Implementation App. 432 100% - 18.3 - - N
Walking and cycling facilities
Petone to Ngauranga Cycleway Interim Safety Improvements Construction - Com 452 100% 880.0 250.0 - - N
Petone to Ngauranga Cycleway Safety Construction - Com 452 100% 290.0 190.0 - - N
Walking and Cycling - Key safety and congestion Group allocation Alloc. 166.4 166.4 166.4
Walking and Cycling - Access and community benefits Group allocation Alloc. - - -
SH1 Mt Victoria Tunnel W/C Improvements Investigation 2 LMM Reserve 451 100% 100.0 100.0 - - Res. A
SH1 Mt Victoria Tunnel W/C Improvements Design 2 LMM Reserve 451 100% 103.0 - 103.0 - Res. A
SH1 Mt Victoria Tunnel W/C Improvements Construction 2 LMM Reserve 451 100% 1,060.9 - - 1,060.9 Res. A
Paraparaumu Rail Overbridge Clip-on Cycle Lane Design 2 LML Reserve 452 100% 84.0 74.0 - - Res. A
Paraparaumu Rail Overbridge Clip-on Cycle Lane Construction 2 LML Reserve 452 100% 1,174.2 - 1,174.2 - Res. A
Transport planning
Ngauranga to Airport Strategic Study Study Com 002 100% 790.1 64.2 - - N
SH1 Kapiti Strategic Study Study Com 002 100% 490.0 195.1 - - N
SH2 Hutt Corridor Strategic Study Study Com 002 100% 130.0 85.1 - - N
Wellington PFR Funding for 0809 Study Com 002 100% 50.0 41.6 - - N
Activity management plans Study Cat2 003 100% 1,411.8 453.2 479.3 479.3 N
Wellington Kiwirap Black Routes safety Study Study 2 MM_ Cat2 002 100% 100.0 34.0 33.0 33.0 N
Wellington Safe, sustainable and efficient routes study Study 2 MM_ Cat2 002 100% 100.0 34.0 33.0 33.0 N