Phase Regional priority Profile Status Work category Indicative FAR* Total phase cost 2009/10 NLTF ($000) 2010/11 NLTF ($000) 2011/12 NLTF ($000) Funding priority Funding source*
Far North District Council
Renewal of local roads
Road renewals Local Roads App. 40,159.3 7,385.5 7,542.6 7,561.2 N
Operation and maintenance of local roads
Road operations and maintenance Local Roads App. 26,421.5 4,909.5 4,932.2 4,954.3 N
E/W 26th-28th July 2008 : Various sites Construction - Com 141 56% - 4,864.7 - - N
E/W event 12 to 14 June 2009 Construction - Com 141 56% - 123.2 - - N
New & improved infrastructure for local roads
Kerikeri Heritage Bypass Construction - Com 323 75% 17,200.0 1,289.4 - - N
Waimate North Road RP 6108-11087m Construction - Com 325 66% 1,550.0 997.3 - - N
Waipapa Road Seal Widening plus W&C Construction - Com 324 66% 3,950.0 891.0 891.0 - N
Minor improvements 2009/12 Local Roads App. 341 - 983.6 888.0 877.6 N
Improve, expand or replace network group Group allocation Alloc. 100.0 220.0 225.0
Sawyers Rd (Bridge F13) Construction - MMM Cat2 322 66% 126.0 83.2 - - Possible R/N
Wainui Rd (Bridge I25) Investigation - MMM Cat2 322 66% 152.4 100.6 - - Possible N
Matawherohia Rd (Bridge I48) Construction - MMM Cat2 322 66% 131.1 - 86.5 - Possible R/N
Waharua Rd (Bridge A39) Construction - MMM Cat2 322 66% 81.5 - 53.8 - Possible R/N
Quarry Rd (Bridge B13) Construction - MMM Cat2 322 66% 54.7 - 36.1 - Possible R/N
Off SH11 (Kawakawa - Paihia Rd) (Bridge T49) Construction - MMM Cat2 322 66% 300.0 - 198.0 - Possible R/N
Jasons Rd (Bridge E95) Construction - MMM Cat2 322 66% 463.8 - - 306.1 Possible R/N
Churtons Rd (Bridge C13) Construction - MMM Cat2 322 66% 356.3 - - 235.1 Possible R/N
Pokapu Rd (Bridge W12) Construction - MMM Cat2 322 66% 31.8 - - 21.0 Possible R/N
Waikuku Rd (Bridge R07) Construction - MMM Cat2 322 66% 176.4 - - 116.4 Possible R/N
Browns Rd (Te Irenga) (Bridge P13) Construction - MML Reserve 322 66% 128.7 84.9 - - Res. A
User benefits improvements group Group allocation Alloc. 330.0 335.0 335.0
Pungaere Rd Seal Extension (RP 8810 - 12410) Construction - LMH Reserve 325 66% 800.0 367.0 161.0 - Res. A
Picadilly Rd Seal Extension (RP 0 - 3000) Construction - LMH Reserve 325 66% 588.0 194.0 194.0 - Res. A
Matawaia - Maromaku Rd Seal Extension Construction - LMM Reserve 325 66% 500.0 - 330.0 - Res. A
Haruru Falls Rd Seal Extension Construction - LMM Reserve 325 66% 910.0 - 231.0 369.6 Res. A
Ngapipito Rd Seal Extension Construction - LMM Reserve 325 66% 525.0 - - 346.5 Res. A
Taheke Rd Seal Extension Construction - LMM Reserve 325 66% 770.0 - - 508.2 Res. A
Oturu Rd Seal Extension Construction - LMM Reserve 325 66% 700.0 - - 462.0 Res. A
Fairburn Rd Seal Extension Construction - LMM Reserve 325 66% 1,050.0 693.0 - - Res. A
Tapui Rd Seal Extension Construction - LMM Cat2 325 83% 500.0 415.0 - - Probable T
Moutukaraka Point Rd Seal Extension Construction - LMM Cat2 325 83% 100.0 - - 83.0 Probable T
Pawarenga Rd Seal Extension Construction - LMM Cat2 325 83% 150.0 124.5 - - Probable T
Te Huia Marae Rd Seal Extension Construction - LMM Cat2 325 83% 120.0 - - 99.6 Probable T
Te Tii Rd Seal Extension Construction - LMM Cat2 325 83% 150.0 124.5 - - Probable T
Rawhiti Rd (North) Seal Extension Construction - LMM Cat2 325 83% 1,150.0 477.3 249.0 228.3 Probable T
Demand management & community programmes
Community Programmes - Far North 2009 - 2012 Implementation App. 432 75% - 470.0 - - N
Walking and cycling facilities
Walking and Cycling - Access and community benefits Group allocation Alloc. - - -
Kerikeri Rd Footpath Construction - LML Reserve 451 66% 411.0 135.6 135.6 - Res. A
State Highway 10 Footpath Construction - LML Reserve 451 66% 346.8 228.9 - - Res. A
Transport planning
Asset Management Plan Review Study - LL_ Cat2 003 66% 1,950.0 99.0 99.0 165.0 N
Bridge load capacity analysis Study - MM_ Cat2 002 75% 618.2 150.0 154.5 159.1 N
Kapiro - Waipapa Link Study - LM_ Cat2 002 75% 50.0 37.5 - - N
Kerikeri Ring Road Study - LM_ Cat2 002 75% 50.0 37.5 - - N
Kerikeri South Eastern Corridor Study - LM_ Cat2 002 75% 50.0 37.5 - - N
Procurement Strategy Study - MM_ Cat2 003 66% 50.0 33.0 - - N
Hone Heke Road Investigations Study - N/F
Regional development
Kohukohu Road - Rp 13650 to 15120 (RDF) Construction - Com 324 100% 900.0 100.0 - -
Mangamuka Road 08_09 RP 1720 - 3220 (RDF) Construction - Com 324 100% 800.0 50.0 - -
2009 - 2012 Regional Development Programme Group allocation - Alloc. 548.2 468.2 -
Kohukohu Rd RDF (RP 16220 - 16800) Construction - Cat2 324 100% 288.1 288.1 - -
Mangamuka Rd RDF (RP 3220 - 4640) Construction - Cat2 324 100% 709.4 - 709.4 -
Mangamuka Rd RDF (RP 4640 - 5420) Construction - Cat2 324 100% 542.5 542.5 - -
Kaipara District Council
Renewal of local roads
Road renewals Local Roads App. 22,556.6 4,438.2 4,510.1 4,585.7 N
Preventative Maintenance 2009/10 (R Fund) Construction - Cat2 241 70% 208.0 145.6 - -
Preventative Maintenance 2009/12 Construction - Cat2 241 60% 1,078.1 396.0 124.2 126.7
Operation and maintenance of local roads
Road operations and maintenance Local Roads App. 17,513.1 3,493.2 3,506.7 3,526.4 N
E/W 26th-30th July 2008 : Various sites Construction - Com 141 60% - 1,200.0 - - N
New & improved infrastructure for local roads
Baldrock Road (Stages 1 & 2) Seal Extension (R Fund) Construction - Com 325 70% 1,995.0 801.5 - - R
Bickerstaffe Road Seal Extension 2008/09 Construction - Com 325 70% 621.0 420.7 - - N
Central Road Bridge 47 Replacement Construction - Com 322 70% 250.0 175.0 - - N
Intersection Safety Sealing 2008/09 Construction - Com 325 70% 1,565.0 815.5 - - N
Omana Road Bridge 158 Replacement Construction - Com 322 70% 350.0 245.0 - - N
Wairere Road Bridge No.318 Replacement Construction - Com 322 70% 457.0 225.7 - - N
Minor improvements 2009/12 Local Roads App. 341 - 634.5 570.6 568.9 N
Improve, expand or replace network group Group allocation Alloc. 650.0 700.0 700.0
Bridge Replacements 2009/12 Construction - MMH Cat2 322 70% 1,862.4 506.1 394.8 402.7 Probable R/N
New Dargaville Link Road Construction - MMM Cat2 323 70% 1,199.4 - - 74.3 Possible R/N
Otamatea Area Road Reconstruction 2009/12 Construction - MMM Cat2 324 70% 2,815.5 525.0 535.5 910.4 Possible R/N
Community Transport Programmes (T Fund) 2009/12 Construction - MML Cat2 324 85% 1,989.3 552.5 563.6 574.8 Probable T
User benefits improvements group Group allocation Alloc. 330.0 335.0 335.0
Seal Extensions 2009/10 Construction - LMM Reserve 325 70% 1,507.0 1,054.9 - - Res. A
Seal Extension 2011/12 Construction - LMM Reserve 325 70% 1,567.9 - - 1,097.5 Res. A
Seal Extensions 2010/11 Construction - LMM Reserve 325 70% 1,537.1 - 1,076.0 - Res. A
Demand management & community programmes
Community Programmes 2009/12 Implementation App. 432 75% - 61.8 - - N
Walking and cycling facilities
Walking and Cycling - Access and community benefits Group allocation Alloc. - - -
Walking and Cycling Facilities 2009/12 Construction - LMM Reserve 452 70% 648.8 148.4 151.4 154.4 Res. A
Transport planning
Activity Management Plan 2009/12 Study - ML_ Cat2 003 70% 128.0 17.5 35.7 36.4 N
Aggregate Study 2011/12 Study - LL_ Cat2 003 75% 52.0 - - 39.0 N
Crash Reduction Study - Arterials 2011/12 Study - MM_ Cat2 002 75% 52.0 - - 39.0 N
Barging Study 2010/11 Study - N/F
Mangawhai/Kaiwaka Roading Network Strategy 2010/11 Study - N/F
Walking and Cycling Strategy Review 2009/10 Study - N/F
Regional development
Regional Development 2009/12 Group allocation - Alloc. 1,400.0 1,428.0 1,456.6
Regional Development 2009/10 Construction - Cat2 324 100% 2,000.0 2,000.0 - -
Regional Development 2010/11 Construction - Cat2 324 100% 2,040.0 - 2,040.0 -
Regional Development 2011/12 Construction - Cat2 324 100% 2,080.8 - - 2,080.8
Northland Highway & Network Operations
Renewal of state highways
Road renewals State Highways App. 53,067.8 18,469.1 17,299.3 17,299.3 N
Flood Mitigation Construction - Cat2 241 100% 3,000.0 2,000.0 1,000.0 -
Preventive Maintenance 9/12 Construction - Cat2 241 100% 2,530.9 841.7 844.6 844.6
Scour Investigation 9/12 Construction - Cat2 241 100% 483.0 156.0 161.0 166.0
Operation and maintenance of state highways
Road operations and maintenance State Highways App. 42,495.9 14,159.1 14,168.4 14,168.4 N
EW Condoleezza Weather Bomb Northland Jul 08 Construction - Com 141 100% - 3,245.0 - - N
EW Heavy Rains Event Northland May 08 Construction - Com 141 100% - 82.5 - - N
EW Severe Rainstorm Event Northland May 2009 Construction - Com 141 100% - 1,370.0 - - N
EW SH1N&14 Rain Storm Event Northland Feb/Mar 09 Construction - Com 141 100% - 700.0 - - N
New & improved infrastructure for State highways
Akerama Curves Realign & PL Design 5 Com 324 100% 581.0 138.9 - - R
Akerama Curves Realign & PL Property 5 Com 331 100% 310.5 257.6 53.0 - R
Bulls Gorge Realign Design 2 Com 324 100% 50.0 50.0 - - N
Bulls Gorge Realign Property 2 Com 331 100% 20.6 20.6 - - N
Kamo Bypass Stage 2 Design 4 Com 323 100% 300.0 300.0 - - R
Waitiki Landing to Cape Reinga SE Stg 2 Construction 1 Com 325 100% 15,877.0 4,980.0 - - R
Waitiki Landing to Cape Reinga SE Stg 2 Property Com 324 100% 11.2 11.2 - - N
Bends Sth of Wakelin Rd SI Investigation Com 100% 100.0 75.0 - - N
Callaghan Rd NB PL Investigation Com 100% 97.0 10.4 - - R
Hukerenui NB PL Extension Design Com 100% 200.0 96.2 - - R
Hukerenui NB PL Extension Investigation Com 100% 134.0 23.9 - - R
Hukerenui NB PL Extension Stg 1 Construction Com 100% 945.9 812.0 - - N
Kaingaroa SI Construction Com 100% 1,400.0 79.4 - - N
Kaiwaka SB PL Investigation Com 100% 250.0 45.0 - - N
Kensington to Tarewa Short Term Improvements Construction Com 100% 600.0 20.0 - - N
Lily Pond Bridge to Quarry Seal Widening Design Com 100% 115.0 115.0 - - N
Opononi-Omapere Safety Improvements Design Com 100% 120.0 120.0 - - N
Ounuwhao Safety Improvements Investigation Com 100% 160.0 150.0 - - N
Plantation North Realign Design Com 100% 93.0 7.0 - - N
Plantation North to Topuni Bridge SI Design Com 100% 214.0 20.0 - - N
Puketona SH11 Int. Impvt Investigation Com 100% 228.7 57.1 - - N
Salesyards Road Intersections Improvements Investigation Com 100% 200.0 44.9 - - N
Selwyn Ave to Fourth Ave 4L Stg 1 Investigation Com 100% 580.1 397.9 - - N
SH14 Intersection Improvement Design Com 100% 290.0 260.0 - - N
Springfield Rd to Oakleigh Service Station Safety Imp Construction Com 100% 3,648.0 1,013.5 - - N
Taumarere Realignment Investigation Com 100% 269.2 71.0 - - N
Waipapa Rd Intersection Improvements Investigation Com 100% 200.0 100.0 - - N
Watercress Crk SB PL Construction Com 100% 1,875.0 45.0 - - N
Whangarei Urban Improvements Investigation Com 100% 350.0 49.0 - - N
Minor improvements 2009/12 State Highways App. 341 - 2,107.4 2,157.9 2,157.9 N
Kamo Bypass Stage 2 Property HML App. 325 100% 20.6 20.6 - - Probable R/N
Puketona SH11 Int. Impvt Construction - MMH Cat2 324 100% 4,428.0 - 2,000.0 2,428.0 Probable R/N
Puketona SH11 Int. Impvt Design - MMH Cat2 324 100% 206.0 206.0 - - Probable R/N
Selwyn Ave to Fourth Ave 4L Stg 2 Construction - HMM Cat2 324 100% 8,448.1 1,000.0 3,607.1 3,841.0 Probable R/N
Selwyn Ave to Fourth Ave 4L Stg 2 Design - HMM Cat2 324 100% 577.0 577.0 - - Probable R/N
Selwyn Ave to Fourth Ave 4L Stg 2 Property - HMM Cat2 331 100% 105.0 52.0 53.0 - Probable R/N
Tarewa I/S Improvements and Tarewa to SH14 4 Laning Construction - HLM Cat2 324 100% 7,780.4 - - 3,270.7 Probable N
Tarewa I/S Improvements and Tarewa to SH14 4 Laning Design - HLM Cat2 324 100% 515.0 515.0 - - Probable N
Tarewa I/S Improvements and Tarewa to SH14 4 Laning Property - HLM Cat2 331 100% 763.7 180.2 583.5 - Probable N
Kamo Bypass Stage 2 Construction 4 HML Cat2 323 100% 15,268.8 7,346.3 7,922.4 - Probable N
Brynderwyn Hill Realignment Investigation - HML Cat2 324 100% 491.7 - - 491.7 Probable N
Akerama Curves Realign & PL Construction 5 MML Cat2 324 100% 6,652.7 - 1,288.2 4,482.6 Possible N
Bulls Gorge Realign Construction 2 MML Cat2 324 100% 8,231.2 1,393.4 3,265.6 3,572.1 Possible N
Matakohe Realign Investigation 2 LMM Cat2 324 100% 556.2 556.2 - - Possible N
Matakohe Realign Property 2 LMM Cat2 331 100% 594.7 - 211.1 383.6 Possible N
Matakohe Realign Design LMM Cat2 324 100% 646.0 - 317.0 329.0
Strategic network group Group allocation Alloc. 3,062.5 3,368.8 3,368.8
Brynderwyn Nrth Waipu Gorge Rd-Artillery Rd Curves Design - HMH Cat2 324 100% 100.0 100.0 - - Probable R
Brynderwyn Nrth Waipu Gorge Rd-Artillery Rd Curves Construction - HMH Cat2 324 100% 1,040.0 - 1,040.0 - Probable R
Plantation North Realign Construction - HMH Cat2 324 100% 1,150.0 567.0 583.0 - Probable R
Topuni Bridge to Ross Rd SW Construction - HMH Cat2 324 100% 937.0 937.0 - - Probable R
Mountain Rd Seal Widening Design - HMM Cat2 324 100% 20.0 20.0 - - Probable R/N
Mountain Rd Seal Widening Construction - HMM Cat2 324 100% 3,517.2 695.0 2,822.2 - Probable R/N
SH14 Intersection Improvement Construction - HMM Cat2 324 100% 3,752.1 2,060.0 1,692.1 - Probable R/N
Improve, expand or replace network group Group allocation Alloc. 8,468.8 9,315.6 9,315.6
Far North Stock Effluent Facilities Investigation - MMH Cat2 321 100% 51.5 51.5 - - Probable R/N
Far North Stock Effluent Facilities Design - MMH Cat2 321 100% 51.5 51.5 - - Probable R/N
Far North Stock effluent facilities Construction - MMH Cat2 321 100% 742.6 - 742.6 - Probable R/N
High Performance Long Life Markings Investigation - MMH Cat2 324 100% 700.0 700.0 - - Probable R/N
High Performance Long Life Markings Design - MMH Cat2 324 100% 700.0 - 700.0 - Probable R/N
High Performance Long Life Markings Construction - MMH Cat2 324 100% 1,500.0 - - 1,500.0 Probable R/N
Old North Rd SB PL Construction - MMH Cat2 324 100% 2,090.0 1,031.0 1,059.0 - Probable R/N
Artillery Rd/ Pilbrow Rd I/S Investigation - MMM Cat2 324 100% 103.0 103.0 - - Probable N
Artillery Rd/ Pilbrow Rd I/S Design - MMM Cat2 324 100% 265.2 - 265.2 - Probable N
Artillery Rd/ Pilbrow Rd I/S Construction - MMM Cat2 324 100% 3,278.2 - - 3,278.2 Probable N
Bends North of Te Wharau SI Investigation - MMM Cat2 324 100% 206.0 206.0 - - Probable N
Bends North of Te Wharau SI Design - MMM Cat2 324 100% 209.1 103.0 106.1 - Probable N
Bends North of Te Wharau SI Construction - MMM Cat2 324 100% 2,668.2 - 2,121.8 546.4 Probable N
Bends Sth of Wakelin Rd SI Design - MMM Cat2 324 100% 40.0 40.0 - - Probable N
Bends Sth of Wakelin Rd SI Construction - MMM Cat2 324 100% 370.0 - 370.0 - Probable N
Bryderwyn North Artillery Road-Piroa Bridge Curves Investigation - MMM Cat2 324 100% 750.0 750.0 - - Probable N
Bryderwyn North Artillery Road-Piroa Bridge Curves Design - MMM Cat2 324 100% 750.0 - 750.0 - Probable N
Bryderwyn North Artillery Road-Piroa Bridge Curves Construction - MMM Cat2 324 100% 1,655.0 - - 1,655.0 Probable N
Improved Driver Information 9/12 Construction - MMM Cat2 321 100% 872.1 282.1 290.6 299.3 Probable R/N
Opononi-Omapere Safety Improvements Construction - MMM Cat2 324 100% 2,186.0 - 708.0 731.0 Probable N
Pavement Smoothing 9/12 Construction - MMM Cat2 324 100% 1,060.7 308.6 391.2 360.9 Probable R/N
Property Acquisitions 9/12 Property - MMM Cat2 331 100% 1,294.6 418.9 431.4 444.4 Probable R/N
Rehabilitation Seal Widening 9/12 Construction - MMM Cat2 324 100% 1,090.1 352.7 363.3 374.2 Probable R/N
Safety Retrofit 9/12 Construction - MMM Cat2 324 100% 3,270.4 1,058.1 1,089.8 1,122.5 Probable R/N
Seismic Retrofit 9/12 Construction - MMM Cat2 322 100% 328.0 328.0 - - Probable R/N
Strategic Plan Initiatives 9/12 Construction - MMM Cat2 324 100% 2,616.3 846.4 871.8 898.0 Probable R/N
Taumarere Realignment Design - MMM Cat2 324 100% 46.0 46.0 - - Probable N
Taumarere Realignment Construction - MMM Cat2 324 100% 2,044.0 - 1,062.0 982.0 Probable N
Waiotu North NB Passing Lane Design - MMM Cat2 324 100% 50.0 50.0 - - Probable N
Waiotu North NB Passing Lane Construction - MMM Cat2 324 100% 4,440.0 - 4,440.0 - Probable N
Callaghan Rd NB PL Design - MML Cat2 324 100% 66.0 - - 66.0 Possible N
Kaiwaka SB PL Design - MML Cat2 324 100% 212.0 - 212.0 - Possible N
Kaiwaka SB PL Construction - MML Cat2 324 100% 3,546.0 - - 1,853.0 Possible N
Martins Bend Safety Impvt Design - MML Cat2 324 100% 50.0 50.0 - - Possible N
Martins Bend Safety Impvt Construction - MML Cat2 324 100% 940.0 - 940.0 - Possible N
Mountain Road Passing Lane SB Extn Design - MML Cat2 324 100% 22.0 - - 22.0 Possible N
Salesyards Road Intersection Improvements Design - MML Cat2 324 100% 200.0 50.0 150.0 - Possible N
Salesyards Road Intersection Improvements Construction - MML Cat2 324 100% 2,000.0 - - 1,500.0 Possible N
Waipapa Rd Intersection Improvements Design - MML Cat2 324 100% 154.5 154.5 - - Possible N
Brynderwyn Hill Realignment Design Reserve 1,278.9 Res. B
Port Marsden H'way I/C Investigation Reserve 405.9 Res. B
Snake Hill Realign Design - Reserve 213.0 Res. B
Demand management & community programmes
Community Advertising 9/12 - Northland Implementation App. 432 100% - 29.3 - - N
Walking and cycling facilities
Walking and Cycling - Access and community benefits Group allocation Alloc. - - -
Transport planning
Cape Reinga to Whangarei SH1/SH10 Strategic Study Study Com 002 100% 350.0 348.3 - - N
Wellsford to Whangarei Strategic Study Study Com 002 100% 350.0 348.8 - - N
Activity management plans Study Cat2 003 100% 1,583.7 519.4 532.1 532.1 N
Northland Kiwirap Black Route Safety studies Study - MM_ Cat2 002 100% 100.0 34.0 33.0 33.0 N
Passing and Overtaking Strategy Study - MM_ Cat2 002 100% 51.5 51.5 - - N
State Highway Optimisation Strategies Study - MM_ Cat2 002 100% 63.7 20.6 21.2 21.9 N
Northland Regional Council
Public transport services
Bus & ferry concession fares Operations App. 513 50% 309.0 51.5 51.5 51.5 N
Bus services Operations App. 511 50% 2,672.9 445.5 445.5 445.5 N
Public transport facilities maintenance and operations Operations App. 514 60% 429.0 81.0 88.2 88.2 N
Public transport professional services/ administration Operations App. 50% 623.9 102.3 104.0 105.8 N
Total mobility flat payments Operations App. 521 100% 112.0 37.3 37.3 37.3 N
Total mobility operations Operations App. 517 50% 618.0 103.0 103.0 103.0 N
Demand management & community programmes
Vehciles on Beaches 2009 - 2012 Implementation App. 432 75% - 11.7 - - N
Vehicles on Beaches Community Advertising 2009 - 2012 Implementation App. 432 75% - 31.1 - - N
Transport planning
Regional land transport planning management Implementation App. 001 100% 497.8 171.2 163.4 163.2
Supergold card
Supergold trip adminstration Implementation App. 30.0 10.0 10.0 10.0
Supergold trip payments Implementation App. 255.0 75.0 90.0 90.0
Waitangi Trust
Operation and maintenance of local roads
Road operations and maintenance SPR App. 40.5 13.0 13.5 14.0 N
New & improved infrastructure for local roads
Minor improvements 2009/12 SPR App. 341 - 1.0 1.0 1.0 N
Whangarei District Council
Renewal of local roads
Road renewals Local Roads App. 23,754.6 3,857.1 4,101.3 4,394.0 N
Preventative Maintenance 2009/12 Construction - Cat2 241 52% 229.0 - - 119.1
Operation and maintenance of local roads
Road operations and maintenance Local Roads App. 25,159.4 4,307.1 4,409.0 4,406.3 N
E/W 4-5 March 2009: Various Sites Construction - Com 141 52% - 35.6 - - N
New & improved infrastructure for local roads
Kokopu Road Culvert 288 Replacement 2007/08 Construction - Com 322 62% 157.0 89.9 - - N
Pavement Smoothing 2008/09 Construction - Com 324 62% 2,290.0 496.0 - - N
Porowini Avenue Extension Construction Construction - Com 323 62% 7,500.0 2,604.0 1,612.0 - R
Price Road Bridge 111 Replacement 2007/08 Construction - Com 322 62% 298.8 155.0 - - N
Whangarei Stock Effulent Disposal Site Construction - Com 321 61% 119.0 45.8 - - N
Minor improvements 2009/12 Local Roads App. 341 - 653.1 605.8 617.1 N
Lower Hatea River Crossing Construction - MMM Cat2 322 62% 33,764.0 - 6,546.0 7,477.2 Possible N
Mill Road/Nixon Street Upgrades Construction - MMM Cat2 324 62% 5,141.0 - 1,571.1 1,616.3 Possible R/N
Mill Road/Nixon Street Upgrades Investigation - MMM Cat2 324 62% 66.0 40.9 - - Possible R/N
Riverside Drive/Onerahi Road Upgrades Investigation - MMM Cat2 324 62% 62.0 38.4 - - Possible R/N
Improve, expand or replace network group Group allocation Alloc. 1,080.0 1,550.0 1,550.0
Pavement Reconstruction 2009/12 Construction - MMH Cat2 324 62% 1,048.9 - 111.3 539.0 Probable R/N
Bridge Replacements 2009/12 Construction - MMH Cat2 322 62% 4,286.0 - 1,008.7 1,065.8 Probable R/N
Spedding Road Link Construction - MMM Cat2 323 62% 2,971.0 1,842.0 - - Possible R/N
Onerahi Road Improvements Construction - MMM Cat2 324 62% 1,355.0 - 32.9 262.9 Possible R/N
One Tree Point Upgrades Construction - MMM Cat2 324 62% 3,348.3 - - 2,076.0 Possible R/N
New Traffic Management Facilities 2009/12 Construction - MMM Cat2 321 62% 461.0 50.2 38.4 197.2 Possible R/N
McEwan Road Upgrades - Stage 1 Construction - MMM Cat2 324 62% 1,059.0 - - 656.6 Possible R/N
User benefits improvements group Group allocation Alloc. 100.0 100.0 100.0
Seal Extensions 2009/10 Construction - LMH Reserve 325 62% 2,000.0 1,240.0 - - Res. A
Seal Extension 2011/12 Construction - LMH Reserve 325 62% 2,118.0 - - 1,313.2 Res. A
Seal Extension 2010/11 Construction - LMH Reserve 325 62% 2,058.0 - 1,276.0 - Res. A
Public transport infrastructure
General access & community benefits PT group Group allocation Alloc. - - -
Whangarei Urban Bus Service Infrastructure 2009/12 Construction - LMM Reserve 531 60% 371.0 66.0 77.4 79.2 Res. A
Demand management & community programmes
Community Programmes 2009/12 Implementation App. 432 75% - 112.5 - - N
Walking and cycling facilities
Walking and Cycling - Access and community benefits Group allocation Alloc. - - -
Whangarei OnRoad Walking and Cycling Paths Construction - LMH Reserve 452 62% 585.1 117.2 121.0 124.6 Res. A
Whangarei Offroad Walking & Cycling Paths Construction - LML Reserve 452 62% 2,107.7 105.5 547.7 653.6 Res. A
Transport planning
Activity Management Plans 2009/12 Study - LL_ Cat2 003 62% 312.1 62.5 64.6 66.4 N
Growth Related Strategy Studies 2009/12 Study - MM_ Cat2 002 75% 316.0 127.5 54.0 55.5 N
Regional development
Mangakahia Road 2008/09 (RDF) Construction 2 Com 324 100% 3,300.0 250.0 - -
Regional Development 2009/12 Group allocation - Alloc. 3,215.9 1,381.1 -
Regional Development Package 1 Construction - Cat2 324 100% 4,500.0 4,500.0 - -
Regional Development Package 2 Construction - Cat2 324 100% 2,914.5 686.9 2,227.6 -