National Land Transport Programme 2009-2012

Manawatu-Whanganui regional NLTP table

Return to Manawatu-Whanganui regional tables page

Phase Regional priority Profile Status Work category Indicative FAR* Total phase cost 2009/10 NLTF ($000) 2010/11 NLTF ($000) 2011/12 NLTF ($000) Funding priority Funding source*
DOC (Manawatu-Whanganui)
Renewal of local roads
Road renewals SPR App. 640.0 270.0 270.0 100.0 N
Operation and maintenance of local roads
Road operations and maintenance SPR App. 480.0 160.0 160.0 160.0 N
New & improved infrastructure for local roads
Minor improvements 2009/12 SPR App. 341 - 34.4 30.6 18.2 N
Horizons Manawatu
Public transport services
Bus & ferry concession fares Operations App. 513 50% 246.2 39.6 41.0 42.5 N
Bus services Operations App. 511 50% 7,213.7 1,202.3 1,202.3 1,202.3 N
Public transport facilities maintenance and operations Operations App. 514 60% 951.3 149.9 154.6 266.3 N
Public transport professional services/ administration Operations App. 50% 768.2 127.6 128.3 128.3 N
Total mobility flat payments Operations App. 521 100% 516.9 170.6 172.3 174.0 N
Total mobility operations Operations App. 517 50% 2,085.8 347.6 347.6 347.6 N
Wheelchair hoists Operations App. 519 60% 120.0 24.0 24.0 24.0 N
Palmerston North Bus Service Improvements Implementation 9 MMM Cat2 511 50% - 176.3 182.2 187.0 Possible N
Demand management & community programmes
Community Programmes 2009/12 Implementation App. 432 75% - 697.1 - - N
Transport planning
Regional land transport planning management Implementation App. 001 100% 442.1 152.0 145.1 145.0
Supergold card
Supergold trip adminstration Implementation App. 27.0 9.0 9.0 9.0
Supergold trip payments Implementation App. 300.0 100.0 100.0 100.0
Horowhenua District Council
Renewal of local roads
Road renewals Local Roads App. 6,154.4 995.7 974.4 922.5 N
Operation and maintenance of local roads
Road operations and maintenance Local Roads App. 5,811.7 920.2 928.0 938.0 N
E/Works 2007/08 Construction - Com 141 47% - 141.0 - - N
New & improved infrastructure for local roads
Minor improvements 2009/12 Local Roads App. 341 - 153.3 135.4 130.5 N
Manawatu District Council
Renewal of local roads
Road renewals Local Roads App. 23,867.8 4,036.5 4,136.4 4,238.4 N
Operation and maintenance of local roads
Road operations and maintenance Local Roads App. 11,922.3 2,028.8 2,079.1 2,131.0 N
New & improved infrastructure for local roads
Minor improvements 2009/12 Local Roads App. 341 - 485.2 442.4 446.6 N
Strategic Roading Network - Feilding to Palmerston North Construction 12 MMM Cat2 324 62% 7,200.0 124.0 1,550.0 2,170.0 Possible R/N
Kopane Bridge Replacement Construction 13 MML Reserve 322 62% 380.0 235.6 - - Res. A
Improve, expand or replace network group Group allocation Alloc. - - -
Stewart Road/Awahuri Feilding Road Intersection Improvement Construction - MML Reserve 324 62% 450.0 124.0 155.0 - Res. A
Walking and cycling facilities
Walking and Cycling - Access and community benefits Group allocation Alloc. - - -
Cycleway Construction Construction - LMM Reserve 452 62% 635.0 35.3 36.0 37.2 Res. A
Manawatu/Whanganui Highway & Network Operations
Renewal of state highways
Road renewals State Highways App. 39,277.2 14,139.0 12,569.1 12,569.1 N
Preventive Maintenance 9/12 Construction - Cat2 241 100% 2,539.8 2,086.6 226.6 226.6
Scour Investigation 9/12 Construction 5 Cat2 241 100% 525.0 170.0 175.0 180.0
Operation and maintenance of state highways
Road operations and maintenance State Highways App. 38,583.2 12,855.4 12,863.9 12,863.9 N
EW SH4 Braeburn Riverbank West Whanganui Construction - Com 141 100% - 3,007.3 - - N
EW SH4 Raukawa Falls West Whanganui Construction - Com 141 100% - 30.0 - - N
EW West Whanganui 06/07 Construction - Com 141 100% - 1,972.2 - - N
EW West Whanganui 06/07 (Okura) Construction - Com 141 100% - 700.0 - - N
New & improved infrastructure for State highways
Manawatu Hill Realignment Property 5 Com 331 100% 275.0 59.0 107.0 109.0 N
Ohingaiti-Makohine Realignment Construction - Com 324 100% 15,074.4 4,854.2 3,029.7 - R
SH2 Papatawa Realignment Design - Com 324 100% 200.0 200.0 - - R
SH2 Papatawa Realignment Property - Com 331 100% 772.5 772.5 - - R
Carlton/ Alma/Jackson Intersection Design Com 100% 60.0 10.0 - - N
Concord Line Curve Realignment Investigation Com 100% 70.0 20.0 - - N
Corby Road South Curves Design Com 100% 80.0 10.0 - - N
Desert Road North Passing Lane Construction Com 100% 673.7 15.0 - - N
Duddings Lake North P/L Construction Com 100% 1,649.9 206.0 - - R
Foxton South Curves Construction Com 100% 4,435.1 203.6 - - R
Hansen Line and Taonui Nth Curves Construction Com 100% 650.0 350.0 - - N
Linnet-Huia St Curve Imp Design Com 100% 50.0 20.0 - - N
Lismore Corner Design Com 100% 50.0 11.0 - - N
London Street - High School Safety Improvements Package Design Com 100% 40.0 20.0 - - R
Makerua I/S SH56/57 Construction Com 100% 3,299.9 233.6 - - R
Manunui Intersection Construction Com 100% 323.7 22.0 - - N
North of Upokongaro Realignment Construction Com 100% 523.8 18.1 - - N
Otamaraho Curve P/L Extension Design Com 100% 120.0 110.6 - - N
P/L Merge Treatments (Region 8) Design Com 100% 100.0 50.0 - - N
Pukepapa Road South P/L Construction Com 100% 1,260.0 1,290.0 200.0 - N
Rangitikei Line Tremaine Ave Intersection Improvement Design Com 100% 80.0 17.5 - - N
Region 8 Stock Effluent Disposal Facilities Design Com 100% 110.0 32.0 - - N
SH3 SH54 Intersection Investigation Com 100% 70.0 75.0 - - N
SH56/57 Drainage Safety Profiling Investigation Com 100% 60.0 30.0 - - N
Waiauti Bridge Realignment Design Com 100% 285.0 35.0 - - N
Wikitoria I/S Construction Com 100% 1,800.0 1,470.0 320.0 - N
Wilson Road South Curve Improvements Construction Com 100% 2,430.0 1,380.0 - - N
Minor improvements 2009/12 State Highways App. 341 - 1,743.5 1,744.1 1,744.1 N
Manawatu Hill Realignment Construction 5 MMM Cat2 324 100% 12,481.0 - - 2,216.1 Probable R/N
Manawatu Hill Realignment Design 5 MMM Cat2 324 100% 209.1 103.1 105.9 - Probable R/N
Mangaweka South Realignment Design 2 MMM Cat2 324 100% 156.8 77.7 79.1 - Probable R/N
North of Levin to Otaki (Levin Bypass) Design - HML Cat2 323 100% 10,500.0 - 2,200.0 2,600.0 Probable R/N
North of Levin to Otaki (Levin Bypass) Investigation - HML Cat2 323 100% 1,200.0 400.0 400.0 400.0 Probable R/N
SH2 Papatawa Realignment Construction - MMM Cat2 324 100% 9,337.7 1,518.1 4,872.0 2,947.5 Probable R/N
Tahoraiti Railway Crossing Investigation 2 LMM Cat2 324 100% 217.0 - 52.8 164.2 Possible N
Whakaruatapu Stream Bridge Replacement & Realignment Construction 1 LMM Cat2 324 100% 5,464.8 - 1,593.3 2,190.9 Probable N
Whakaruatapu Stream Bridge Replacement & Realignment Property LMM Cat2 324 100% 83.6 41.3 42.4 - Probable N
Strategic network group Group allocation Alloc. 656.3 721.9 721.9
Muhunoa Road I/S Construction 1 HML Cat2 324 100% 456.0 - 456.0 - Probable R/N
Waiauti Bridge Realignment Construction 1 HML Cat2 324 100% 3,771.0 - - 1,863.0 Probable R/N
Waitarere Road Realignment Investigation 2 HML Cat2 324 100% 22.0 - - 22.0 Probable R/N
Improve, expand or replace network group Group allocation Alloc. 7,000.0 7,700.0 7,700.0
Dannevirke SE Disposal facility Construction 16 MMH Cat2 321 100% 212.0 - 212.0 - Probable R
Golf Road South Passing Lane Design 7 MMH Cat2 324 100% 41.0 41.0 - - Probable R
Golf Road South Passing Lane Construction 7 MMH Cat2 324 100% 796.0 - 796.0 - Probable R
Gorge Woodville SW Investigation 6 MMH Cat2 324 100% 41.0 41.0 - - Probable R
Gorge Woodville SW Design 6 MMH Cat2 324 100% 42.0 - 42.0 - Probable R
Levin - Makerua Passing Lanes Investigation 1 MMH Cat2 324 100% 85.0 - 85.0 - Probable R
Levin - Makerua Passing Lanes Design 1 MMH Cat2 324 100% 55.0 - - 55.0 Probable R
Linnet-Huia St Curve Imp Construction 1 MMH Cat2 324 100% 318.0 - 318.0 - Probable R
Lismore Corner Design 7 MMH Cat2 324 100% 23.0 23.0 - - Probable R
Millrick-Kendall Realignment Design 1 MMH Cat2 324 100% 209.0 103.0 106.0 - Probable R
Millrick-Kendall Realignment Construction 1 MMH Cat2 324 100% 4,500.0 - - 600.0 Probable R
National Park SE Disposal facility Construction 16 MMH Cat2 321 100% 219.0 - - 219.0 Probable R
Otamaraho Curve P/L Extension Construction 14 MMH Cat2 324 100% 3,667.0 - - 1,088.0 Probable R
P/L Merge Treatments (Region 8) Design 1 MMH Cat2 324 100% 50.0 50.0 - - Probable R
Rangitikei Line JFKennedy Drive Intersection Construction 12 MMH Cat2 324 100% 515.0 515.0 - - Probable R
Rangitikei Line Tremaine Ave Intersection Improvement Construction 12 MMH Cat2 324 100% 1,255.0 619.0 636.0 - Probable R
Sanson South P/L Design 13 MMH Cat2 324 100% 42.0 - 42.0 - Probable N
SH3 SH54 Intersection Design 14 MMH Cat2 324 100% 53.0 53.0 - - Probable R
SH3 SH54 Intersection Construction 14 MMH Cat2 324 100% 1,186.0 - 531.0 655.0 Probable R
SH56/57 Drainage Safety Profiling Design 6 MMH Cat2 324 100% 66.0 66.0 - - Probable R
SH56/57 Drainage Safety Profiling Construction 6 MMH Cat2 324 100% 3,015.0 - 1,487.0 1,528.0 Probable R
Taihape SE Disposal facility Construction 16 MMH Cat2 321 100% 206.0 206.0 - - Probable R
Hapokopoko Stream North Realignment Design 2 MMM Cat2 324 100% 74.0 - 74.0 - Probable R/N
Improved Driver Information 9/12 Construction 8 MMM Cat2 321 100% 690.3 223.3 230.0 236.9 Probable R/N
London Street - High School Safety Improvements Package Construction 8 MMM Cat2 324 100% 328.0 - - 328.0 Probable R/N
Marangai Road South P/L Construction 14 MMM Cat2 324 100% 1,517.0 - 422.0 1,095.0 Probable R/N
Mt Stewart North Passing Lane Construction 8 MMM Cat2 324 100% 1,192.0 927.0 265.0 - Probable R/N
Oroua Road North P/L Design 14 MMM Cat2 324 100% 62.0 41.0 21.0 - Probable R/N
Pavement Smoothing 9/12 Construction 5 MMM Cat2 324 100% 1,035.0 479.4 289.0 266.6 Probable R/N
Piriaka Rail Bridge & Approaches Investigation 8 MMM Cat2 324 100% 22.0 - - 22.0 Probable R/N
Property Acquisitions 9/12 Property 5 MMM Cat2 331 100% 1,324.3 428.5 441.3 454.5 Probable R/N
Ratana Hill Investigation 3 MMM Cat2 324 100% 54.0 - 21.0 33.0 Probable R/N
Ratana Hill Design 3 MMM Cat2 324 100% 22.0 - - 22.0 Probable R/N
Rehabilitation Seal Widening 9/12 Construction 8 MMM Cat2 324 100% 862.9 279.2 287.5 296.2 Probable R/N
Safety Retrofit 9/12 Construction 5 MMM Cat2 324 100% 2,588.6 837.5 862.6 888.5 Probable R/N
Seismic Retrofit 9/12 Construction 5 MMM Cat2 322 100% 2,399.0 61.0 274.0 2,064.0 Probable R/N
Strategic Plan Initiatives 9/12 Construction 5 MMM Cat2 324 100% 2,070.9 670.0 690.1 710.8 Probable R/N
Dalvey Road South P/L Design 15 MML Cat2 324 100% 53.0 - 53.0 - Possible N
Mangaweka South Realignment Construction 2 Reserve 26,310.0 Res. B
North of Levin to Otaki (Levin Bypass) Construction Reserve 196,876.9 Res. B
North of Levin to Otaki (Levin Bypass) Property - Reserve 30,112.6 Res. B
Tahoraiti Railway Crossing Property 2 Reserve 114.0 Res. B
Demand management & community programmes
Community Advertising 9/12 - Manawatu-Whanganui Implementation App. 432 100% - 38.9 - - N
Walking and cycling facilities
Walking and Cycling - Key safety and congestion Group allocation Alloc. 98.4 98.4 98.4
Turitea Stream Bridge Widening Design 4 MMM Cat2 452 100% 101.5 50.0 51.5 - Possible R
Turitea Stream Bridge Widening Construction 4 MMM Cat2 452 100% 1,182.9 - - 636.5 Possible R
Walking and Cycling - Access and community benefits Group allocation Alloc. - - -
Bulls Bridge Cycleway Design 8 LMM Reserve 452 100% 151.5 100.0 51.5 - Res. A
Bulls Bridge Cycleway Construction 8 LMM Reserve 452 100% 2,082.4 - 1,030.0 1,052.4 Res. A
Manawatu River Bridge SH3 Ashhurst Cycle/walkway Investigation 4 LMM Reserve 452 100% 80.0 80.0 - - Res. A
Manawatu River Bridge SH3 Ashhurst Cycle/walkway Design 4 LMM Reserve 452 100% 156.0 - 103.0 53.0 Res. A
Manawatu River Bridge SH3 Ashhurst Cycle/walkway Construction 4 LMM Reserve 452 100% 2,153.6 - - 1,060.9 Res. A
Cobham Bridge South - Wikitoria Design 3 LMM Reserve 452 100% 72.1 - 72.1 - Res. A
Cobham Bridge South - Wikitoria Construction 3 LMM Reserve 452 100% 750.0 525.0 215.0 - Res. A
Rauma Railway Walkway Investigation 9 LMM Reserve 452 100% 40.0 40.0 - - Res. A
Rauma Railway Walkway Design 9 LMM Reserve 452 100% 114.8 - 61.8 53.0 Res. A
Rauma Railway Walkway Construction 9 LMM Reserve 452 100% 510.4 - - 106.1 Res. A
Manawatu River Bridge SH1 Whirokino Cycle/Walkway Investigation 4 LMM Reserve 452 100% 61.8 - 61.8 - Res. A
Manawatu River Bridge SH1 Whirokino Cycle/Walkway Design 4 LMM Reserve 452 100% 127.3 - - 127.3 Res. A
Old West Road (North) SW Construction 2 LML Reserve 452 100% 1,100.0 1,100.0 - - Res. A
Transport planning
Regional funding for parallel and peer reviews Study Com 002 100% 250.0 127.3 - - N
Whanganui PFR Funding for Annual Plans Study Com 002 100% 30.0 7.5 - - N
Activity management plans Study Cat2 003 100% 1,290.1 429.9 430.1 430.1 N
Mana-Wang Kiwirap Black Route Safety Study Study - MM_ Cat2 002 100% 100.0 34.0 33.0 33.0 N
Mana-Wang safe, sustainable and efficient routes study Study - MM_ Cat2 002 100% 100.0 34.0 33.0 33.0 N
Palmerston North City Council
Renewal of local roads
Road renewals Local Roads App. 11,856.9 1,751.4 1,756.7 1,946.1 N
Operation and maintenance of local roads
Road operations and maintenance Local Roads App. 12,538.4 1,912.3 1,918.7 1,949.6 N
New & improved infrastructure for local roads
Railway Road Improvement Construction - Com 324 56% 2,782.0 616.0 - - R
Minor improvements 2009/12 Local Roads App. 341 - 293.1 261.6 273.2 N
New Bridge - Advance Land Purchase Construction 13 MMM Cat2 333 56% 3,007.0 1,344.0 269.9 70.0 Possible R/N
New Bridge Manawatu River Design 13 MMM Cat2 322 56% 2,800.0 224.0 560.0 784.0 Possible R/N
Strategic Roading - North Eastern Link Construction 12 MML Reserve 324 56% 1,452.0 42.0 288.4 296.2 Res. A
Improve, expand or replace network group Group allocation Alloc. 220.0 330.0 330.0
Rangitikei Tremaine Signal Upgrade - Local share Construction 12 MMH Cat2 324 56% 823.0 - 460.9 - Probable R
Featherston Street widening Property - MMM Cat2 333 56% 1,235.0 - 691.6 - Possible R/N
Ashhurst Street Improvements Construction - MMM Cat2 324 56% 250.0 140.0 - - Possible R/N
Walding St safety upgrade Construction - MMM Cat2 324 56% 300.0 168.0 - - Possible R/N
Ferguson Ruahine Intersection Upgrade Construction - MMM Cat2 324 56% 257.0 143.9 - - Possible R/N
Grey Albert Roundabout Construction - MMM Cat2 324 56% 290.0 - 162.4 - Possible R/N
James Line reconstruction - stage II Construction - MML Reserve. 324 56% 1,151.0 - 432.3 - Res. A
Public transport infrastructure
General access & community benefits PT group Group allocation Alloc. 560.0 560.0 560.0
Passenger Transport - Bus terminal Construction 10 LMM Reserve 531 56% 10,000.0 - 840.0 2,520.0 Res. A
Urban transport choice, network improvements & safety PT group Group allocation Alloc. 20.3 20.3 20.3
Passenger Transport Road Improvements Construction - MMM Cat2 533 56% 746.0 66.1 26.9 29.1 Probable R/N
Demand management & community programmes
Travel Planning 2009/12 Implementation N/F
Walking and cycling facilities
Walking and Cycling - Access and community benefits Group allocation Alloc. - - -
Cycling / walking improvements 09/12 Construction - LMM Reserve 452 56% 88.0 49.3 - - Res. A
Cycling / walking improvements 09/12 Construction - LMM Reserve 452 56% 1,382.0 - 773.9 - Res. A
Cycling / walking improvements 09/12 Construction - LMM Reserve 452 56% 5,836.0 - - 871.4 Res. A
Transport planning
Aokautere Bypass Study Study - MM_ Cat2 002 75% 144.0 - 108.0 - N
Joint Strategic Roading Study Study - MM_ Cat2 002 75% 62.5 46.9 - - N
Rangitikei District Council
Renewal of local roads
Road renewals Local Roads App. 19,885.1 3,728.0 3,983.1 4,021.1 N
Operation and maintenance of local roads
Road operations and maintenance Local Roads App. 10,880.1 2,132.0 2,156.6 2,168.7 N
New & improved infrastructure for local roads
Taihape Napier Road Seal Extension (R) Construction - Com 325 85% 11,850.0 4,381.7 - - N & R
Minor improvements 2009/12 Local Roads App. 341 - 468.8 437.0 434.1 N
Improve, expand or replace network group Wylies Bridge Renewal Group allocation Investigation 13 MML Alloc. Reserve 322 69% 155.0 -- -- - 107.0 Res. A
Transport planning
Route Strategy Studies Study - MM_ Cat2 002 75% 150.0 37.5 37.5 37.5 N
Ruapehu District Council
Renewal of local roads
Road renewals Local Roads App. 14,126.2 2,413.0 3,165.3 3,179.9 N
Operation and maintenance of local roads
Road operations and maintenance Local Roads App. 9,982.1 2,106.1 2,029.0 2,063.2 N
New & improved infrastructure for local roads
Dobbs Bluff Reconstruction Construction - Com 324 72% 601.0 252.7 - - R
Mountain Road (SPR) Bridge at 9 km Construction - Com 322 75% 1,150.0 843.8 - - N
Okahukura Saddle Road Seal Extension (R) Construction 15 Com 325 73% 1,870.0 769.7 - - R
River Rd / Raetihi-Pipiriki Road (R) Construction - Com 325 79% 4,080.0 592.5 592.5 312.7 R
Minor improvements 2009/12 Local Roads App. 341 - 361.5 369.7 367.7 N
improve, expand or replace network group Group allocation Alloc. 75.0 - 75.0
Mountain Road (SPR) 7.6km Fatality Site Design - MMH Cat2 324 75% 100.0 75.0 - - Probable R
Mountain Road (SPR) 3km Passing Lane Construction - MMM Cat2 324 75% 120.0 - - 90.0 Possible R/N
Mountain Road (SPR) Hair Pin at 13.0 km Investigation - MMM Cat2 324 75% 50.0 - - 37.5 Possible R/N
User benefits improvements group Group allocation Alloc. - - -
Waitaanga Road Seal Extension Design - LMM Reserve 325 72% 50.0 - - 36.0 Res. A
Demand management & community programmes
Community Programme 2009/12 Implementation N/F
Ruapehu District Council SPR
Renewal of local roads
Road renewals SPR App. 998.4 323.0 332.6 342.8 N
Operation and maintenance of local roads
Road operations and maintenance SPR App. 805.5 260.6 268.5 276.4 N
New & improved infrastructure for local roads
Minor improvements 2009/12 SPR App. 341 - 46.7 42.8 43.4 N
Tararua District Council
Renewal of local roads
Road renewals Local Roads App. 17,762.3 3,507.5 3,552.5 3,597.5 N
Operation and maintenance of local roads
Road operations and maintenance Local Roads App. 12,912.3 2,572.8 2,599.3 2,623.3 N
New & improved infrastructure for local roads
Coast Rd Seal Extension 08-09 Construction - Com 325 70% 220.0 144.8 - - N
Minor improvements 2009/12 Local Roads App. 341 - 486.4 437.9 436.2 N
Pahiatua Track Route Realignment ( R Funded) 09-12 Construction 5 MMM Cat2 324 70% 8,700.0 2,100.0 2,800.0 1,190.0 Possible R/N
User benefits improvements group Group allocation Alloc. - - -
Coast Road Seal Extension 09-12 Construction - LMH Reserve. 325 70% 1,180.0 266.0 276.5 283.5 Res. A
Whanganui District Council
Renewal of local roads
Road renewals Local Roads App. 15,020.5 3,034.9 3,133.1 3,144.8 N
Preventative Maintenance - Somme Parade Construction - Cat2 241 62% 540.0 334.8 - -
Operation and maintenance of local roads
Road operations and maintenance Local Roads App. 13,871.4 2,870.5 2,890.5 2,909.9 N
New & improved infrastructure for local roads
Forestry on Rural Roads - Study Study - Com 311 72% 90.0 57.6 - - N
River Rd / Raetihi-Pipiriki Road (R) Construction - Com 325 79% 4,080.0 592.5 592.5 312.7 R
Minor improvements 2009/12 Local Roads App. 341 - 472.4 428.8 424.6 N
Improve, expand or replace network group Group allocation Alloc. - 20.0 45.0
Mangamahu - Bridge Renewal - Wylies Bridge - No.46 Investigation 13 MMM Cat2 322 72% 25.0 - - 18.0 Possible R/N
Mangamahu - Bridge Renewal - Wylies Bridge - No.46 Design 13 MMM Cat2 322 72% 130.0 - - 93.6 Possible R/N
User benefits improvements group Group allocation Alloc. 100.0 100.0 100.0
Walking and cycling facilities
Walking and Cycling - Access and community benefits Group allocation Alloc. - - -
Phase 2.1 Construction - LMH Reserve 452 72% 377.0 271.4 - - Res. A
Phase 2.2 Construction - LMH Reserve 452 72% 382.0 - 275.0 - Res. A
Phase 2.3 Construction - LMH Reserve 452 72% 393.0 - - 283.0 Res. A
Transport planning
Urban Whanganui Transportation Study Study - MM_ Cat2 002 75% 155.0 75.0 41.3 - N