National Land Transport Programme 2009-2012

Hawke's Bay regional NLTP table

Return to Hawke's Bay regional tables page

Phase Regional priority Profile Status Work category Indicative FAR* Total phase cost 2009/10 NLTF ($000) 2010/11 NLTF ($000) 2011/12 NLTF ($000) Funding priority Funding source*
Central Hawkes Bay District Council
Renewal of local roads
Road renewals Local Roads App. 18,887.7 3,561.5 3,570.7 3,633.8 N
Operation and maintenance of local roads
Road operations and maintenance Local Roads App. 10,149.6 1,877.0 1,931.7 1,989.1 N
New & improved infrastructure for local roads
Atua Road - Seal Extension Construction - Com 325 67% 700.0 435.5 - - N
Minor improvements 2009/12 Local Roads App. 341 - 435.1 391.7 394.3 N
Walking and cycling facilities
Waipawa Cyclelane Network Construction - Com 452 67% 19.2 10.9 - -
Waipukurau Cyclelane Network Construction - Com 452 67% 31.0 18.1 - - N
Walking and Cycling - Access and community benefits Group allocation Alloc. - - -
Walking & Cycling Construction 122 LMM Reserve 452 67% 17.5 11.7 - - Res. A
Walking & Cycling Construction 122 LMM Reserve 452 67% 24.2 - 16.2 - Res. A
Walking & Cycling Construction 122 LMM Reserve 452 67% 18.9 - - 12.7 Res. A
Transport planning
Asset Management Plan Study 107 MM_ Cat2 003 75% 60.0 15.0 15.0 15.0 N
Bridge Renewal Study 2009/11 Study 108 MM_ Cat2 003 75% 105.0 52.5 26.3 - N
Traffic Study 2009/11 Study 109 MM_ Cat2 002 75% 105.0 52.5 26.3 - N
DOC (Hawkes Bay)
Operation and maintenance of local roads
Road operations and maintenance SPR App. 105.0 35.0 35.0 35.0 N
New & improved infrastructure for local roads
Minor improvements 2009/12 SPR App. 341 - 2.8 2.5 2.5 N
Hastings District Council
Renewal of local roads
Road renewals Local Roads App. 25,579.3 4,342.0 4,349.2 4,354.3 N
Operation and maintenance of local roads
Road operations and maintenance Local Roads App. 18,498.0 3,098.1 3,159.1 3,207.8 N
Emergency Works 08/09 Construction - Com 141 51% - 239.7 - - N
New & improved infrastructure for local roads
Northern Arterial Route (R Funded)-up to design Design 1 Com 323 61% 562.0 159.8 - - R
Minor improvements 2009/12 Local Roads App. 341 - 595.2 534.5 530.3 N
Northern Arterial Route (R Funded) - Updated Construction 1 MML Reserve 323 61% 18,500.0 1,830.0 3,172.0 3,172.0 Res. A
Improve, expand or replace network group Group allocation Alloc. 630.0 635.0 635.0
Te Aute Rd Route Treatment - New Construction - MMH Cat2 324 61% 619.0 122.0 125.7 129.9 Probable R/N
Ruahapia Route Safety Treatment - New Construction - MMH Cat2 324 61% 260.0 158.6 - - Probable R/N
Various Major safety improvements - New Construction - MMH Cat2 324 61% 544.0 - 163.5 168.4 Probable R/N
Taihape Road, Seal Extension - Updated Construction 1 MMH App. 325 61% 3,000.0 610.0 610.0 610.0 Probable R/N
User benefits improvements group Group allocation Alloc. - - -
Aroapaonui Rd Seal Extension - Route - Updated Construction - LMH Reserve 325 61% 420.0 256.2 - - Res. A
Aroapaonui Rd Seal Extension - Route - Updated Construction - LMH Reserve 325 61% 191.0 - - 116.5 Res. A
Matahoura Road 8 - Seal Extension Route - Updated Construction - LMH Reserve 325 61% 430.0 - - 262.3 Res. A
Price Cockburn (Stages) - Seal Extension - New Construction - LMH Reserve 325 61% 223.0 - - 136.0 Res. A
Waihau Road (Stage5+6) - Seal Extension - New Construction - LMH Reserve 325 61% 500.0 - 305.0 - Res. A
Public transport infrastructure
General access & community benefits PT group Group allocation Alloc. 5.2 5.2 5.2
Park 'N Ride Facilities - New Investigation 129 LMM Reserve 531 60% 103.0 30.0 - 31.8 Res. A
Demand management & community programmes
Travel Planning - Community Focused - New Implementation N/F
Walking and cycling facilities
Walking and Cycling - Access and community benefits Group allocation Alloc. - - -
Cycleways Strategy Implementation - Updated Construction 121 LMM Reserve 452 61% 300.0 183.0 - - Res. A
Cycleways Strategy Implementation - Updated Construction 121 LMM Reserve 452 61% 360.0 - 219.6 - Res. A
Cycleways Strategy Implementation - Updated Construction 121 LMM Reserve 452 61% 425.0 - - 259.3 Res. A
Pathway Strategy Implementation - New Construction 121 LMM Reserve 451 61% 103.0 - 62.8 - Res. A
Pathway Strategy Implementation - New Construction 121 LMM Reserve 451 61% 106.0 - - 64.7 Res. A
Transport planning
Asset Management Plans 2009-12 - New Study 106 ML_ Cat2 003 61% 3,496.0 173.9 179.3 183.6 N
Bus Priority Measures 2009-12 - New Study 114 MM_ Cat2 002 75% 103.0 37.5 - 39.8 N
CBD Parking and Pricing Strategy - NEW Study 115 MM_ Cat2 002 75% 103.0 37.5 - 39.8 N
Corridor Planning Study - New Study 116 MM_ Cat2 002 75% 286.0 - 39.0 - N
HB Regional Transportation Study - Heretaunga Plains (HDC) Study 101 MH_ Cat2 002 75% 152.0 56.3 57.8 - N
Travel Demand Management - New Study 120 MM_ Cat2 002 75% 155.0 37.5 39.0 39.8 N
Walking & Cycling Strategy - New Study - N/F
Hawkes Bay Highway & Network Operations
Renewal of state highways
Road renewals State Highways App. 30,536.4 11,630.9 9,452.7 9,452.7 N
Preventive Maintenance 9/12 Construction 1 Cat2 241 100% 794.6 219.1 111.2 464.3
Scour Investigation 9/12 Construction 1 Cat2 241 100% 358.0 116.0 119.0 123.0
Operation and maintenance of state highways
Road operations and maintenance State Highways App. 26,534.3 8,840.9 8,846.7 8,846.7 N
New & improved infrastructure for State highways
HB Expressway Southern Extension Construction - Com 323 100% 12,000.0 5,005.5 5,996.3 998.2 R
Matahorua Gorge Realignment Construction - Com 324 100% 31,300.0 4,107.3 10,604.7 8,726.0 R
Matahorua Gorge Realignment Design - Com 324 100% 450.0 450.0 - - R
Matahorua Gorge Realignment Property - Com 331 100% 36.0 36.0 - - N
Prebensen Drive / Hyderabad Road Interchange Investigation Com 323 100% 201.5 50.0 - - R
Waipukurau Overbridge Realignment Construction - Com 324 100% 6,124.2 4,739.9 - - N
Waipukurau Overbridge Realignment Design - Com 324 100% 366.0 10.0 - - R
Bay View -70kph Zone Traffic Management Investigation Com 100% 75.0 75.0 - - N
Corkscrew Gully Northbound Passing Lane Investigation Com 100% 60.0 25.0 - - N
Corkscrew Gully Southbound Passing lane Investigation Com 100% 60.0 25.0 - - N
Dillons Hill Realignment Construction Com 100% 4,000.0 1,574.1 - - N
Dillons Hill Realignmernt Stage 2 Construction Com 100% 1,100.0 1,100.0 - - N
Glencoe Gorge Realignment Investigation Com 100% 100.0 20.0 - - N
Glengarry Hill Stock Effluent Disposal Facility (ex Bay View Construction Com 100% 600.0 600.0 - - N
HB Expressway Meeanee Quay Intersection Investigation Com 100% 150.0 130.0 - - N
Mohaka Seismic Retrofit Construction Com 100% 1,654.0 604.0 - - N
Napier Airport to Bay View Passing Lanes Design Com 100% 94.9 27.8 - - N
North of Tunanui Rd Realignment Investigation Com 100% 145.0 5.0 - - N
Opapa Passing Lane Northbound - SH2 Pakipaki Investigation Com 100% 40.0 30.0 - - N
Opapa Passing Lane Southbound - SH2 Pakipaki Investigation Com 100% 40.0 30.0 - - N
Poukawa Swamp Sth Passing Lane Investigation Com 100% 45.0 25.0 - - N
SH2 Kennels Corner and Curve South Investigation Com 100% 100.0 90.0 - - N
SH2 Napier Road Intersection Investigation Com 100% 70.0 25.0 - - N
SH2 Pilcher Rd Intersection Investigation Com 100% 70.0 25.0 - - N
SH2 South of SH50 Passing Lane Design Com 100% 40.0 35.0 - - N
Te Mahanga Nth Passing Lane Design Com 100% 48.2 13.0 - - N
Te Mahanga Sth -Passing Lane Design Com 100% 59.7 30.0 - - N
Waitangi Washout Bridge Replacement Investigation Com 100% 432.1 50.0 - - N
Whakaki Rd Curves Improvements Investigation Com 100% 242.0 102.0 - - N
Minor improvements 2009/12 State Highways App. 341 - 1,322.2 1,254.9 1,254.9 N
Tarawera Hill Realignment and PL's Investigation 8 MMH Cat2 324 100% 273.2 - - 273.2 Probable R/N
Waitangi Washout Bridge Replacement Construction - MMH Cat2 322 100% 9,135.2 - - 1,434.3 Probable R/N
Waitangi Washout Bridge Replacement Design MMH Cat2 322 100% 363.6 257.6 105.9 - Probable R/N
Prebensen Drive / Hyderabad Road Interchange Design 1 LML Reserve 323 100% 430.7 - 212.5 218.2 Res. A
Prebensen Drive / Hyderabad Road Interchange Property LML Reserve 323 100% 1,639.3 - 424.8 768.7 Res. A
Improve, expand or replace network group Group allocation Alloc. 4,812.5 5,293.8 5,293.8
Bay View -70kph Zone Traffic Management Construction - MMH Cat2 321 100% 656.0 - - 656.0 Probable R/N
Bay View to SH2/SH5 Intersection Seal Widening Investigation 10 MMH Cat2 324 100% 60.0 - 10.0 50.0 Probable R/N
College Road to Silverstream Realignment & PL Design 21 MMH Cat2 324 100% 95.0 - - 95.0 Probable R/N
Corkscrew Gully Northbound Passing Lane Design 36 MMH Cat2 324 100% 72.0 72.0 - - Probable R/N
Glencoe Gorge Realignment Design 20 MMH Cat2 324 100% 106.0 - 106.0 - Probable R/N
HB Expressway Kennedy to Ngaruroro Improvements Investigation 18 MMH Cat2 324 100% 150.0 - 150.0 - Probable R/N
Mohaka Bridge Deck Repairs Investigation 3 MMH Cat2 322 100% 134.0 134.0 - - Probable R/N
Mohaka Bridge Deck Repairs Design 3 MMH Cat2 322 100% 318.0 - 318.0 - Probable R/N
Napier Road Intersection Design 6 MMH Cat2 324 100% 77.0 77.0 - - Probable R/N
Napier Road Intersection Construction 6 MMH Cat2 324 100% 1,060.0 - 1,060.0 - Probable R/N
North of Tunanui Rd Realignment Design 12 MMH Cat2 324 100% 77.0 77.0 - - Probable R/N
Poukawa Swamp Nth Passing lane - SH2 Pakipaki Design 29 MMH Cat2 324 100% 55.0 - - 55.0 Probable R/N
Poukawa Swamp Sth Passing Lane Design 30 MMH Cat2 324 100% 53.0 - 53.0 - Probable R/N
SH2 Pilcher Rd Intersection Design 7 MMH Cat2 324 100% 44.0 - - 44.0 Probable R/N
SH2/50 Intersection Improvements Design 13 MMH Cat2 324 100% 45.0 45.0 - - Probable R/N
SH2/SH5 Intersection Improvements Investigation 11 MMH Cat2 324 100% 109.0 109.0 - - Probable R/N
SH2/SH5 Intersection Improvements Design 11 MMH Cat2 324 100% 109.0 - - 109.0 Probable R/N
Tahaenui Bridge Replacement and Realignment Investigation 25 MMH Cat2 324 100% 75.0 - - 75.0 Probable R/N
Tangoio Straight Seal Widening Investigation 23 MMH Cat2 324 100% 32.8 - - 32.8 Probable R/N
Tuiroa Cutting Realignment and Seal Widening Investigation 33 MMH Cat2 324 100% 106.0 - 106.0 - Probable R/N
Tuiroa Cutting Realignment and Seal Widening Design 33 MMH Cat2 324 100% 87.0 - - 87.0 Probable R/N
Wairoa Stock Effluent Disposal Facility Design 34 MMH Cat2 321 100% 53.0 - 53.0 - Probable R/N
Wairoa Stock Effluent Disposal Facility Construction 34 MMH Cat2 321 100% 273.0 - - 273.0 Probable R/N
Waitangi Washout Bridge Replacement Design 4 MMH Cat2 324 100% 364.0 258.0 106.0 - Probable R/N
Crash Reduction Studies 9/12 Construction 1 MMM Cat2 324 100% 766.8 248.1 255.5 263.2 Probable R/N
Improved Driver Information 9/12 Construction - MMM Cat2 321 100% 551.5 178.4 183.8 189.3 Probable R/N
Pavement Smoothing 9/12 Construction 1 MMM Cat2 324 100% 45.4 15.3 15.6 14.4 Probable R/N
Property Acquisitions 9/12 Property 1 MMM Cat2 331 100% 486.5 157.4 162.1 167.0 Probable R/N
Rehabilitation Seal Widening 9/12 Construction 1 MMM Cat2 324 100% 689.4 223.1 229.7 236.6 Probable R/N
Safety Retrofit 9/12 Construction 1 MMM Cat2 324 100% 2,068.3 669.2 689.2 709.9 Probable R/N
Seismic Retrofit 9/12 Construction 1 MMM Cat2 322 100% 3,693.0 1,060.0 2,525.0 108.0 Probable R/N
SH2 Napier to Gisborne Passing Opportunities Design 9 MMM Cat2 324 100% 200.0 - 200.0 - Probable R/N
SH2 Napier to Gisborne Passing Opportunities Construction 9 MMM Cat2 324 100% 2,300.0 - 300.0 500.0 Probable R/N
SH2 Tutira Section Corridor Mass Action Design 15 MMM Cat2 324 100% 93.0 93.0 - - Probable N
SH2/50A Paki Paki Junction with SH50A Investigation 26 MMM Cat2 324 100% 84.4 - - 84.4 Probable N
SH5 Turangakumu to Windy gap mass action Investigation 14 MMM Cat2 324 100% 50.0 50.0 - - Probable N
SH5 Turangakumu to Windy gap mass action Design 14 MMM Cat2 324 100% 100.0 100.0 - - Probable N
SH5 Turangakumu to Windy gap mass action Construction 14 MMM Cat2 324 100% 2,500.0 - 2,500.0 - Probable N
Strategic Plan Initiatives 9/12 Construction 1 MMM Cat2 324 100% 1,654.6 535.3 551.4 567.9 Probable R/N
Tutira section corridor mass action Investigation 15 MMM Cat2 324 100% 93.0 - 93.0 - Probable N
Tutira section corridor mass action Design 15 MMM Cat2 324 100% 93.0 - - 93.0 Probable N
Whakaki Rd Curves Improvements Design 22 MMM Cat2 324 100% 53.0 - 53.0 - Probable N
SH5 Te Pohue golf course to mistletoe mass action Investigation 16 MML Cat2 324 100% 150.0 - - 150.0 Possible N
Waikaremoana seal extension SH38 Design 46 MML Cat2 325 100% 75.0 - 75.0 - Possible N
Waikaremoana seal extension SH38 Construction 46 MML Cat2 325 100% 4,500.0 - - 1,000.0 Possible N
Tarawera Hill Realignment and PL's Design 8 Reserve 281.4 Res. B
Manga-O-Nuku Bridges Investigation 40 Reserve 225.1 Res. B
Manga-O-Nuku Bridges Design Reserve 528.7 Res. B
Paki Paki to Waipawa Seal Widening Construction Reserve 5,554.2 Res. B
Paki Paki to Waipawa Seal Widening Design Reserve 127.5 Res. B
Paki Paki to Waipawa Seal Widening Investigation Reserve 168.8 Res. B
Prebensen Drive / Hyderabad Road Interchange Construction 1 Reserve 26,061.0 Res. B
Tarawera Hill Realignment and PL's Construction Reserve 7,060.5 Res. B
Tarawera Hill Realignment and PL's Property 8 Reserve 172.0 Res. B
Takapau Plains Seal Widening Design Reserve 209.0 Res. B
Demand management & community programmes
Community Advertising 9/12 - Hawkes Bay Implementation App. 432 100% - 18.3 - - N
Walking and cycling facilities
Walking and Cycling - Key safety and congestion Group allocation Alloc. 42.7 42.7 42.7
Omahu Rd/Expressway Pedestrian Crossing Investigation 123 MMM Cat2 451 100% 50.0 50.0 - - Probable R/N
Omahu Rd/Expressway Pedestrian Crossing Design 123 MMM Cat2 451 100% 75.0 75.0 - - Probable R/N
Omahu Rd/Expressway Pedestrian Crossing Construction 123 MMM Cat2 451 100% 515.0 - 515.0 - Probable R/N
Walking and Cycling - Access and community benefits Group allocation Alloc. - - -
Waipawa to Waipukurau Cycleway Design 126 LMM Reserve 452 100% 30.0 30.0 - - Res. A
Waipawa to Waipukurau Cycleway Construction 126 LMM Reserve 452 100% 412.0 - 412.0 - Res. A
Waipukurau Cycle Lane Network SH 2 Design 125 LMM Reserve 452 100% 30.0 30.0 - - Res. A
Waipukurau Cycle Lane Network SH 2 Construction 125 LMM Reserve 452 100% 103.0 - 103.0 - Res. A
Bay View Cycleway - HB Strategy Design 127 LMM Reserve 452 100% 75.0 75.0 - - Res. A
Bay View Cycleway - HB Strategy Construction 127 LMM Reserve 452 100% 1,260.7 - 412.0 848.7 Res. A
Transport planning
Napier PFR Funding Study Com 002 100% 30.0 22.9 - - N
Activity management plans Study Cat2 003 100% 944.8 325.9 309.5 309.5 N
Hawke's Bay Kiwirap Black Route Safety Strategic Studies Study 110 MM_ Cat2 002 100% 100.0 34.0 33.0 33.0 N
Heretaunga Plains Transportation Study Update Study 101 MH_ Cat2 002 100% 152.3 75.0 77.3 - N
Hawkes Bay Regional Council
Public transport services
Bus services Operations App. 511 50% 6,007.0 1,001.2 1,001.2 1,001.2 N
Public transport facilities maintenance and operations Operations App. 514 60% 525.5 102.6 105.3 107.4 N
Public transport professional services/ administration Operations App. 50% 652.0 107.5 108.5 110.0 N
Total mobility flat payments Operations App. 521 100% 335.6 106.5 111.8 117.4 N
Total mobility operations Operations App. 517 50% 1,076.0 166.2 181.0 190.8 N
Wheelchair hoists Operations App. 519 60% 41.0 12.0 - 12.6 N
Passenger Transport (Bus) Improvements for 09-12 - new Implementation 117 MMM Cat2 511 50% - 22.5 603.4 1,003.3 Possible N
Demand management & community programmes
Community Programme 2009-2012 Implementation App. 432 75% - 283.2 - - N
Travel Planning - Workplace and Schools Implementation N/F
Transport planning
Regional land transport planning management Implementation App. 001 100% 336.4 115.7 110.4 110.3
Hawke's Bay Rural Transport Study Study 102 MM_ Cat2 002 75% 50.0 - 37.5 - N
HB Regional Transportation Study - Heretaunga Plains (HBRC) Study 101 MH_ Cat2 002 75% 150.0 56.3 56.3 - N
Regional Public Transport Plan Study - MM_ Cat2 003 75% 50.0 11.3 22.5 3.8 N
Hawke’s Bay Rail and Coastal Shipping Study Study - N/F
Regional Walking and Cycling Study Study - N/F
Supergold card
Supergold trip adminstration Implementation App. 30.0 10.0 10.0 10.0
Supergold trip payments Implementation App. 350.0 110.0 120.0 120.0
Napier City Council
Renewal of local roads
Road renewals Local Roads App. 8,795.6 1,407.2 1,407.3 1,407.3 N
Operation and maintenance of local roads
Road operations and maintenance Local Roads App. 9,523.0 1,507.3 1,544.4 1,547.1 N
New & improved infrastructure for local roads
Minor improvements 2009/12 Local Roads App. 341 - 233.2 210.1 207.2 N
Awatoto to Expressway Link Design 37 MMM Cat2 323 58% 768.0 - 219.5 225.9 Possible R/N
Prebensen 4 Laning and Hyderabad Overbridge Construction 1 MMM Cat2 323 58% 6,963.0 - 1,933.1 2,105.4 Possible R/N
Prebensen 4 Laning and Hyderabad Overbridge Design 1 MMM Cat2 323 58% 900.0 522.0 - - Possible R/N
Improve, expand or replace network group Group allocation Alloc. 180.0 400.0 400.0
Guppy Meeanee Intersection upgrade stage 2 Design - MMH Cat2 321 58% 100.0 - 58.0 - Probable R/N
Guppy Meeanee Intersection upgrade stage 2 Construction - MMH Cat2 321 58% 500.0 - - 290.0 Probable R/N
Lee Rd Meeanee Rd intersection Design - MMM Cat2 324 58% 200.0 116.0 - - Possible R/N
Lee Rd Meeanee Rd intersection Construction - MMM Cat2 324 58% 2,100.0 - 1,218.0 - Possible R/N
Maadii Kennedy Wycliffe Intersection Upgrade Construction - MMM Cat2 324 58% 600.0 348.0 - - Possible R/N
Demand management & community programmes
NAP's Ahuriri West Quay/Pirimai Implementation N/F
Neighbourhood Accesability Plan - Maraenui and Napier Hill Implementation N/F
Walking and cycling facilities
Cycleway Project Stage 6 Construction - Com 452 58% 675.0 89.9 - - N
Walking and Cycling - Access and community benefits Group allocation Alloc. - - -
Cycleway Project Stage 6 Construction - LMM Reserve 452 58% 325.0 188.5 - - Res. A
Cycleway Project Stage 6 Construction - LMM Reserve 452 58% 750.0 - 145.0 145.0 Res. A
Transport planning
HB Regional Transportation Study - Heretaunga Plains (NCC) Study 101 MH_ Cat2 002 75% 150.0 56.3 56.3 - N
TDM/Walking/Cycling Strategy Study - N/F
Wairoa District Council
Renewal of local roads
Road renewals Local Roads App. 7,464.8 1,536.9 1,662.0 1,727.9 N
Operation and maintenance of local roads
Road operations and maintenance Local Roads App. 13,995.7 3,047.7 3,075.8 3,119.5 N
Emergency Works. 2008/09 - May Event Construction - Com 141 66% - 356.4 - - N
New & improved infrastructure for local roads
Minor improvements 2009/12 Local Roads App. 341 - 366.8 337.2 339.9 N
Ormond Drive Realignment Construction - MMM Cat2 324 76% 446.0 339.0 - - Possible N
Walking and cycling facilities
Walking and Cycling - Access and community benefits Group allocation Alloc. - - -
Cycleway/Walkway Implementation Construction 128 LML Reserve 452 76% 550.0 167.2 123.6 127.2 Res. A
Regional development
Cricklewood Road (RDR) Construction - Com 324 100% 400.0 400.0 - -
Willowflat Road (RD) Construction - Com 324 100% 230.0 220.0 - -
Riverina road (RDR) Construction - Cat2 324 100% 50.0 - 50.0 -
Waitai Valley Road (RDR) Construction - Cat2 324 100% 240.0 - 240.0 -
Wairoa District Council SPR
Renewal of local roads
Road renewals SPR App. 115.0 35.9 39.0 40.1 N
Operation and maintenance of local roads
Road operations and maintenance SPR App. 1,173.3 362.7 399.4 411.2 N
New & improved infrastructure for local roads
Minor improvements 2009/12 SPR App. 341 - 31.9 31.2 31.6 N