Phase |
Regional priority |
Profile |
Status |
Work category |
Indicative FAR* |
Total phase cost |
2009/10 NLTF ($000) |
2010/11 NLTF ($000) |
2011/12 NLTF ($000) |
Funding priority |
Funding source* |
Central Hawkes Bay District Council |
Renewal of local roads |
Road renewals |
Local Roads |
|
|
App. |
|
|
18,887.7 |
3,561.5 |
3,570.7 |
3,633.8 |
|
N |
Operation and maintenance of local roads |
Road operations and maintenance |
Local Roads |
|
|
App. |
|
|
10,149.6 |
1,877.0 |
1,931.7 |
1,989.1 |
|
N |
New & improved infrastructure for local roads |
Atua Road - Seal Extension |
Construction |
- |
|
Com |
325 |
67% |
700.0 |
435.5 |
- |
- |
|
N |
Minor improvements 2009/12 |
Local Roads |
|
|
App. |
341 |
|
- |
435.1 |
391.7 |
394.3 |
|
N |
Walking and cycling facilities |
Waipawa Cyclelane Network |
Construction |
- |
|
Com |
452 |
67% |
19.2 |
10.9 |
- |
- |
|
|
Waipukurau Cyclelane Network |
Construction |
- |
|
Com |
452 |
67% |
31.0 |
18.1 |
- |
- |
|
N |
Walking and Cycling - Access and community benefits |
Group allocation |
|
|
Alloc. |
|
|
|
- |
- |
- |
|
|
Walking & Cycling |
Construction |
122 |
LMM |
Reserve |
452 |
67% |
17.5 |
11.7 |
- |
- |
Res. A |
|
Walking & Cycling |
Construction |
122 |
LMM |
Reserve |
452 |
67% |
24.2 |
- |
16.2 |
- |
Res. A |
|
Walking & Cycling |
Construction |
122 |
LMM |
Reserve |
452 |
67% |
18.9 |
- |
- |
12.7 |
Res. A |
|
Transport planning |
Asset Management Plan |
Study |
107 |
MM_ |
Cat2 |
003 |
75% |
60.0 |
15.0 |
15.0 |
15.0 |
|
N |
Bridge Renewal Study 2009/11 |
Study |
108 |
MM_ |
Cat2 |
003 |
75% |
105.0 |
52.5 |
26.3 |
- |
|
N |
Traffic Study 2009/11 |
Study |
109 |
MM_ |
Cat2 |
002 |
75% |
105.0 |
52.5 |
26.3 |
- |
|
N |
DOC (Hawkes Bay) |
Operation and maintenance of local roads |
Road operations and maintenance |
SPR |
|
|
App. |
|
|
105.0 |
35.0 |
35.0 |
35.0 |
|
N |
New & improved infrastructure for local roads |
Minor improvements 2009/12 |
SPR |
|
|
App. |
341 |
|
- |
2.8 |
2.5 |
2.5 |
|
N |
Hastings District Council |
Renewal of local roads |
Road renewals |
Local Roads |
|
|
App. |
|
|
25,579.3 |
4,342.0 |
4,349.2 |
4,354.3 |
|
N |
Operation and maintenance of local roads |
Road operations and maintenance |
Local Roads |
|
|
App. |
|
|
18,498.0 |
3,098.1 |
3,159.1 |
3,207.8 |
|
N |
Emergency Works 08/09 |
Construction |
- |
|
Com |
141 |
51% |
- |
239.7 |
- |
- |
|
N |
New & improved infrastructure for local roads |
Northern Arterial Route (R Funded)-up to design |
Design |
1 |
|
Com |
323 |
61% |
562.0 |
159.8 |
- |
- |
|
R |
Minor improvements 2009/12 |
Local Roads |
|
|
App. |
341 |
|
- |
595.2 |
534.5 |
530.3 |
|
N |
Northern Arterial Route (R Funded) - Updated |
Construction |
1 |
MML |
Reserve |
323 |
61% |
18,500.0 |
1,830.0 |
3,172.0 |
3,172.0 |
Res. A |
|
Improve, expand or replace network group |
Group allocation |
|
|
Alloc. |
|
|
|
630.0 |
635.0 |
635.0 |
|
|
Te Aute Rd Route Treatment - New |
Construction |
- |
MMH |
Cat2 |
324 |
61% |
619.0 |
122.0 |
125.7 |
129.9 |
Probable |
R/N |
Ruahapia Route Safety Treatment - New |
Construction |
- |
MMH |
Cat2 |
324 |
61% |
260.0 |
158.6 |
- |
- |
Probable |
R/N |
Various Major safety improvements - New |
Construction |
- |
MMH |
Cat2 |
324 |
61% |
544.0 |
- |
163.5 |
168.4 |
Probable |
R/N |
Taihape Road, Seal Extension - Updated |
Construction |
1 |
MMH |
App. |
325 |
61% |
3,000.0 |
610.0 |
610.0 |
610.0 |
Probable |
R/N |
User benefits improvements group |
Group allocation |
|
|
Alloc. |
|
|
|
- |
- |
- |
|
|
Aroapaonui Rd Seal Extension - Route - Updated |
Construction |
- |
LMH |
Reserve |
325 |
61% |
420.0 |
256.2 |
- |
- |
Res. A |
|
Aroapaonui Rd Seal Extension - Route - Updated |
Construction |
- |
LMH |
Reserve |
325 |
61% |
191.0 |
- |
- |
116.5 |
Res. A |
|
Matahoura Road 8 - Seal Extension Route - Updated |
Construction |
- |
LMH |
Reserve |
325 |
61% |
430.0 |
- |
- |
262.3 |
Res. A |
|
Price Cockburn (Stages) - Seal Extension - New |
Construction |
- |
LMH |
Reserve |
325 |
61% |
223.0 |
- |
- |
136.0 |
Res. A |
|
Waihau Road (Stage5+6) - Seal Extension - New |
Construction |
- |
LMH |
Reserve |
325 |
61% |
500.0 |
- |
305.0 |
- |
Res. A |
|
Public transport infrastructure |
General access & community benefits PT group |
Group allocation |
|
|
Alloc. |
|
|
|
5.2 |
5.2 |
5.2 |
|
|
Park 'N Ride Facilities - New |
Investigation |
129 |
LMM |
Reserve |
531 |
60% |
103.0 |
30.0 |
- |
31.8 |
Res. A |
|
Demand management & community programmes |
Travel Planning - Community Focused - New |
Implementation |
|
|
N/F |
|
|
|
|
|
|
|
|
Walking and cycling facilities |
Walking and Cycling - Access and community benefits |
Group allocation |
|
|
Alloc. |
|
|
|
- |
- |
- |
|
|
Cycleways Strategy Implementation - Updated |
Construction |
121 |
LMM |
Reserve |
452 |
61% |
300.0 |
183.0 |
- |
- |
Res. A |
|
Cycleways Strategy Implementation - Updated |
Construction |
121 |
LMM |
Reserve |
452 |
61% |
360.0 |
- |
219.6 |
- |
Res. A |
|
Cycleways Strategy Implementation - Updated |
Construction |
121 |
LMM |
Reserve |
452 |
61% |
425.0 |
- |
- |
259.3 |
Res. A |
|
Pathway Strategy Implementation - New |
Construction |
121 |
LMM |
Reserve |
451 |
61% |
103.0 |
- |
62.8 |
- |
Res. A |
|
Pathway Strategy Implementation - New |
Construction |
121 |
LMM |
Reserve |
451 |
61% |
106.0 |
- |
- |
64.7 |
Res. A |
|
Transport planning |
Asset Management Plans 2009-12 - New |
Study |
106 |
ML_ |
Cat2 |
003 |
61% |
3,496.0 |
173.9 |
179.3 |
183.6 |
|
N |
Bus Priority Measures 2009-12 - New |
Study |
114 |
MM_ |
Cat2 |
002 |
75% |
103.0 |
37.5 |
- |
39.8 |
|
N |
CBD Parking and Pricing Strategy - NEW |
Study |
115 |
MM_ |
Cat2 |
002 |
75% |
103.0 |
37.5 |
- |
39.8 |
|
N |
Corridor Planning Study - New |
Study |
116 |
MM_ |
Cat2 |
002 |
75% |
286.0 |
- |
39.0 |
- |
|
N |
HB Regional Transportation Study - Heretaunga Plains (HDC) |
Study |
101 |
MH_ |
Cat2 |
002 |
75% |
152.0 |
56.3 |
57.8 |
- |
|
N |
Travel Demand Management - New |
Study |
120 |
MM_ |
Cat2 |
002 |
75% |
155.0 |
37.5 |
39.0 |
39.8 |
|
N |
Walking & Cycling Strategy - New |
Study |
- |
|
N/F |
|
|
|
|
|
|
|
|
Hawkes Bay Highway & Network Operations |
Renewal of state highways |
Road renewals |
State Highways |
|
|
App. |
|
|
30,536.4 |
11,630.9 |
9,452.7 |
9,452.7 |
|
N |
Preventive Maintenance 9/12 |
Construction |
1 |
|
Cat2 |
241 |
100% |
794.6 |
219.1 |
111.2 |
464.3 |
|
|
Scour Investigation 9/12 |
Construction |
1 |
|
Cat2 |
241 |
100% |
358.0 |
116.0 |
119.0 |
123.0 |
|
|
Operation and maintenance of state highways |
Road operations and maintenance |
State Highways |
|
|
App. |
|
|
26,534.3 |
8,840.9 |
8,846.7 |
8,846.7 |
|
N |
New & improved infrastructure for State highways |
HB Expressway Southern Extension |
Construction |
- |
|
Com |
323 |
100% |
12,000.0 |
5,005.5 |
5,996.3 |
998.2 |
|
R |
Matahorua Gorge Realignment |
Construction |
- |
|
Com |
324 |
100% |
31,300.0 |
4,107.3 |
10,604.7 |
8,726.0 |
|
R |
Matahorua Gorge Realignment |
Design |
- |
|
Com |
324 |
100% |
450.0 |
450.0 |
- |
- |
|
R |
Matahorua Gorge Realignment |
Property |
- |
|
Com |
331 |
100% |
36.0 |
36.0 |
- |
- |
|
N |
Prebensen Drive / Hyderabad Road Interchange |
Investigation |
|
|
Com |
323 |
100% |
201.5 |
50.0 |
- |
- |
|
R |
Waipukurau Overbridge Realignment |
Construction |
- |
|
Com |
324 |
100% |
6,124.2 |
4,739.9 |
- |
- |
|
N |
Waipukurau Overbridge Realignment |
Design |
- |
|
Com |
324 |
100% |
366.0 |
10.0 |
- |
- |
|
R |
Bay View -70kph Zone Traffic Management |
Investigation |
|
|
Com |
|
100% |
75.0 |
75.0 |
- |
- |
|
N |
Corkscrew Gully Northbound Passing Lane |
Investigation |
|
|
Com |
|
100% |
60.0 |
25.0 |
- |
- |
|
N |
Corkscrew Gully Southbound Passing lane |
Investigation |
|
|
Com |
|
100% |
60.0 |
25.0 |
- |
- |
|
N |
Dillons Hill Realignment |
Construction |
|
|
Com |
|
100% |
4,000.0 |
1,574.1 |
- |
- |
|
N |
Dillons Hill Realignmernt Stage 2 |
Construction |
|
|
Com |
|
100% |
1,100.0 |
1,100.0 |
- |
- |
|
N |
Glencoe Gorge Realignment |
Investigation |
|
|
Com |
|
100% |
100.0 |
20.0 |
- |
- |
|
N |
Glengarry Hill Stock Effluent Disposal Facility (ex Bay View |
Construction |
|
|
Com |
|
100% |
600.0 |
600.0 |
- |
- |
|
N |
HB Expressway Meeanee Quay Intersection |
Investigation |
|
|
Com |
|
100% |
150.0 |
130.0 |
- |
- |
|
N |
Mohaka Seismic Retrofit |
Construction |
|
|
Com |
|
100% |
1,654.0 |
604.0 |
- |
- |
|
N |
Napier Airport to Bay View Passing Lanes |
Design |
|
|
Com |
|
100% |
94.9 |
27.8 |
- |
- |
|
N |
North of Tunanui Rd Realignment |
Investigation |
|
|
Com |
|
100% |
145.0 |
5.0 |
- |
- |
|
N |
Opapa Passing Lane Northbound - SH2 Pakipaki |
Investigation |
|
|
Com |
|
100% |
40.0 |
30.0 |
- |
- |
|
N |
Opapa Passing Lane Southbound - SH2 Pakipaki |
Investigation |
|
|
Com |
|
100% |
40.0 |
30.0 |
- |
- |
|
N |
Poukawa Swamp Sth Passing Lane |
Investigation |
|
|
Com |
|
100% |
45.0 |
25.0 |
- |
- |
|
N |
SH2 Kennels Corner and Curve South |
Investigation |
|
|
Com |
|
100% |
100.0 |
90.0 |
- |
- |
|
N |
SH2 Napier Road Intersection |
Investigation |
|
|
Com |
|
100% |
70.0 |
25.0 |
- |
- |
|
N |
SH2 Pilcher Rd Intersection |
Investigation |
|
|
Com |
|
100% |
70.0 |
25.0 |
- |
- |
|
N |
SH2 South of SH50 Passing Lane |
Design |
|
|
Com |
|
100% |
40.0 |
35.0 |
- |
- |
|
N |
Te Mahanga Nth Passing Lane |
Design |
|
|
Com |
|
100% |
48.2 |
13.0 |
- |
- |
|
N |
Te Mahanga Sth -Passing Lane |
Design |
|
|
Com |
|
100% |
59.7 |
30.0 |
- |
- |
|
N |
Waitangi Washout Bridge Replacement |
Investigation |
|
|
Com |
|
100% |
432.1 |
50.0 |
- |
- |
|
N |
Whakaki Rd Curves Improvements |
Investigation |
|
|
Com |
|
100% |
242.0 |
102.0 |
- |
- |
|
N |
Minor improvements 2009/12 |
State Highways |
|
|
App. |
341 |
|
- |
1,322.2 |
1,254.9 |
1,254.9 |
|
N |
Tarawera Hill Realignment and PL's |
Investigation |
8 |
MMH |
Cat2 |
324 |
100% |
273.2 |
- |
- |
273.2 |
Probable |
R/N |
Waitangi Washout Bridge Replacement |
Construction |
- |
MMH |
Cat2 |
322 |
100% |
9,135.2 |
- |
- |
1,434.3 |
Probable |
R/N |
Waitangi Washout Bridge Replacement |
Design |
|
MMH |
Cat2 |
322 |
100% |
363.6 |
257.6 |
105.9 |
- |
Probable |
R/N |
Prebensen Drive / Hyderabad Road Interchange |
Design |
1 |
LML |
Reserve |
323 |
100% |
430.7 |
- |
212.5 |
218.2 |
Res. A |
|
Prebensen Drive / Hyderabad Road Interchange |
Property |
|
LML |
Reserve |
323 |
100% |
1,639.3 |
- |
424.8 |
768.7 |
Res. A |
|
Improve, expand or replace network group |
Group allocation |
|
|
Alloc. |
|
|
|
4,812.5 |
5,293.8 |
5,293.8 |
|
|
Bay View -70kph Zone Traffic Management |
Construction |
- |
MMH |
Cat2 |
321 |
100% |
656.0 |
- |
- |
656.0 |
Probable |
R/N |
Bay View to SH2/SH5 Intersection Seal Widening |
Investigation |
10 |
MMH |
Cat2 |
324 |
100% |
60.0 |
- |
10.0 |
50.0 |
Probable |
R/N |
College Road to Silverstream Realignment & PL |
Design |
21 |
MMH |
Cat2 |
324 |
100% |
95.0 |
- |
- |
95.0 |
Probable |
R/N |
Corkscrew Gully Northbound Passing Lane |
Design |
36 |
MMH |
Cat2 |
324 |
100% |
72.0 |
72.0 |
- |
- |
Probable |
R/N |
Glencoe Gorge Realignment |
Design |
20 |
MMH |
Cat2 |
324 |
100% |
106.0 |
- |
106.0 |
- |
Probable |
R/N |
HB Expressway Kennedy to Ngaruroro Improvements |
Investigation |
18 |
MMH |
Cat2 |
324 |
100% |
150.0 |
- |
150.0 |
- |
Probable |
R/N |
Mohaka Bridge Deck Repairs |
Investigation |
3 |
MMH |
Cat2 |
322 |
100% |
134.0 |
134.0 |
- |
- |
Probable |
R/N |
Mohaka Bridge Deck Repairs |
Design |
3 |
MMH |
Cat2 |
322 |
100% |
318.0 |
- |
318.0 |
- |
Probable |
R/N |
Napier Road Intersection |
Design |
6 |
MMH |
Cat2 |
324 |
100% |
77.0 |
77.0 |
- |
- |
Probable |
R/N |
Napier Road Intersection |
Construction |
6 |
MMH |
Cat2 |
324 |
100% |
1,060.0 |
- |
1,060.0 |
- |
Probable |
R/N |
North of Tunanui Rd Realignment |
Design |
12 |
MMH |
Cat2 |
324 |
100% |
77.0 |
77.0 |
- |
- |
Probable |
R/N |
Poukawa Swamp Nth Passing lane - SH2 Pakipaki |
Design |
29 |
MMH |
Cat2 |
324 |
100% |
55.0 |
- |
- |
55.0 |
Probable |
R/N |
Poukawa Swamp Sth Passing Lane |
Design |
30 |
MMH |
Cat2 |
324 |
100% |
53.0 |
- |
53.0 |
- |
Probable |
R/N |
SH2 Pilcher Rd Intersection |
Design |
7 |
MMH |
Cat2 |
324 |
100% |
44.0 |
- |
- |
44.0 |
Probable |
R/N |
SH2/50 Intersection Improvements |
Design |
13 |
MMH |
Cat2 |
324 |
100% |
45.0 |
45.0 |
- |
- |
Probable |
R/N |
SH2/SH5 Intersection Improvements |
Investigation |
11 |
MMH |
Cat2 |
324 |
100% |
109.0 |
109.0 |
- |
- |
Probable |
R/N |
SH2/SH5 Intersection Improvements |
Design |
11 |
MMH |
Cat2 |
324 |
100% |
109.0 |
- |
- |
109.0 |
Probable |
R/N |
Tahaenui Bridge Replacement and Realignment |
Investigation |
25 |
MMH |
Cat2 |
324 |
100% |
75.0 |
- |
- |
75.0 |
Probable |
R/N |
Tangoio Straight Seal Widening |
Investigation |
23 |
MMH |
Cat2 |
324 |
100% |
32.8 |
- |
- |
32.8 |
Probable |
R/N |
Tuiroa Cutting Realignment and Seal Widening |
Investigation |
33 |
MMH |
Cat2 |
324 |
100% |
106.0 |
- |
106.0 |
- |
Probable |
R/N |
Tuiroa Cutting Realignment and Seal Widening |
Design |
33 |
MMH |
Cat2 |
324 |
100% |
87.0 |
- |
- |
87.0 |
Probable |
R/N |
Wairoa Stock Effluent Disposal Facility |
Design |
34 |
MMH |
Cat2 |
321 |
100% |
53.0 |
- |
53.0 |
- |
Probable |
R/N |
Wairoa Stock Effluent Disposal Facility |
Construction |
34 |
MMH |
Cat2 |
321 |
100% |
273.0 |
- |
- |
273.0 |
Probable |
R/N |
Waitangi Washout Bridge Replacement |
Design |
4 |
MMH |
Cat2 |
324 |
100% |
364.0 |
258.0 |
106.0 |
- |
Probable |
R/N |
Crash Reduction Studies 9/12 |
Construction |
1 |
MMM |
Cat2 |
324 |
100% |
766.8 |
248.1 |
255.5 |
263.2 |
Probable |
R/N |
Improved Driver Information 9/12 |
Construction |
- |
MMM |
Cat2 |
321 |
100% |
551.5 |
178.4 |
183.8 |
189.3 |
Probable |
R/N |
Pavement Smoothing 9/12 |
Construction |
1 |
MMM |
Cat2 |
324 |
100% |
45.4 |
15.3 |
15.6 |
14.4 |
Probable |
R/N |
Property Acquisitions 9/12 |
Property |
1 |
MMM |
Cat2 |
331 |
100% |
486.5 |
157.4 |
162.1 |
167.0 |
Probable |
R/N |
Rehabilitation Seal Widening 9/12 |
Construction |
1 |
MMM |
Cat2 |
324 |
100% |
689.4 |
223.1 |
229.7 |
236.6 |
Probable |
R/N |
Safety Retrofit 9/12 |
Construction |
1 |
MMM |
Cat2 |
324 |
100% |
2,068.3 |
669.2 |
689.2 |
709.9 |
Probable |
R/N |
Seismic Retrofit 9/12 |
Construction |
1 |
MMM |
Cat2 |
322 |
100% |
3,693.0 |
1,060.0 |
2,525.0 |
108.0 |
Probable |
R/N |
SH2 Napier to Gisborne Passing Opportunities |
Design |
9 |
MMM |
Cat2 |
324 |
100% |
200.0 |
- |
200.0 |
- |
Probable |
R/N |
SH2 Napier to Gisborne Passing Opportunities |
Construction |
9 |
MMM |
Cat2 |
324 |
100% |
2,300.0 |
- |
300.0 |
500.0 |
Probable |
R/N |
SH2 Tutira Section Corridor Mass Action |
Design |
15 |
MMM |
Cat2 |
324 |
100% |
93.0 |
93.0 |
- |
- |
Probable |
N |
SH2/50A Paki Paki Junction with SH50A |
Investigation |
26 |
MMM |
Cat2 |
324 |
100% |
84.4 |
- |
- |
84.4 |
Probable |
N |
SH5 Turangakumu to Windy gap mass action |
Investigation |
14 |
MMM |
Cat2 |
324 |
100% |
50.0 |
50.0 |
- |
- |
Probable |
N |
SH5 Turangakumu to Windy gap mass action |
Design |
14 |
MMM |
Cat2 |
324 |
100% |
100.0 |
100.0 |
- |
- |
Probable |
N |
SH5 Turangakumu to Windy gap mass action |
Construction |
14 |
MMM |
Cat2 |
324 |
100% |
2,500.0 |
- |
2,500.0 |
- |
Probable |
N |
Strategic Plan Initiatives 9/12 |
Construction |
1 |
MMM |
Cat2 |
324 |
100% |
1,654.6 |
535.3 |
551.4 |
567.9 |
Probable |
R/N |
Tutira section corridor mass action |
Investigation |
15 |
MMM |
Cat2 |
324 |
100% |
93.0 |
- |
93.0 |
- |
Probable |
N |
Tutira section corridor mass action |
Design |
15 |
MMM |
Cat2 |
324 |
100% |
93.0 |
- |
- |
93.0 |
Probable |
N |
Whakaki Rd Curves Improvements |
Design |
22 |
MMM |
Cat2 |
324 |
100% |
53.0 |
- |
53.0 |
- |
Probable |
N |
SH5 Te Pohue golf course to mistletoe mass action |
Investigation |
16 |
MML |
Cat2 |
324 |
100% |
150.0 |
- |
- |
150.0 |
Possible |
N |
Waikaremoana seal extension SH38 |
Design |
46 |
MML |
Cat2 |
325 |
100% |
75.0 |
- |
75.0 |
- |
Possible |
N |
Waikaremoana seal extension SH38 |
Construction |
46 |
MML |
Cat2 |
325 |
100% |
4,500.0 |
- |
- |
1,000.0 |
Possible |
N |
Tarawera Hill Realignment and PL's |
Design |
8 |
|
Reserve |
|
|
281.4 |
|
|
|
Res. B |
|
Manga-O-Nuku Bridges |
Investigation |
40 |
|
Reserve |
|
|
225.1 |
|
|
|
Res. B |
|
Manga-O-Nuku Bridges |
Design |
|
|
Reserve |
|
|
528.7 |
|
|
|
Res. B |
|
Paki Paki to Waipawa Seal Widening |
Construction |
|
|
Reserve |
|
|
5,554.2 |
|
|
|
Res. B |
|
Paki Paki to Waipawa Seal Widening |
Design |
|
|
Reserve |
|
|
127.5 |
|
|
|
Res. B |
|
Paki Paki to Waipawa Seal Widening |
Investigation |
|
|
Reserve |
|
|
168.8 |
|
|
|
Res. B |
|
Prebensen Drive / Hyderabad Road Interchange |
Construction |
1 |
|
Reserve |
|
|
26,061.0 |
|
|
|
Res. B |
|
Tarawera Hill Realignment and PL's |
Construction |
|
|
Reserve |
|
|
7,060.5 |
|
|
|
Res. B |
|
Tarawera Hill Realignment and PL's |
Property |
8 |
|
Reserve |
|
|
172.0 |
|
|
|
Res. B |
|
Takapau Plains Seal Widening |
Design |
|
|
Reserve |
|
|
209.0 |
|
|
|
Res. B |
|
Demand management & community programmes |
Community Advertising 9/12 - Hawkes Bay |
Implementation |
|
|
App. |
432 |
100% |
- |
18.3 |
- |
- |
|
N |
Walking and cycling facilities |
Walking and Cycling - Key safety and congestion |
Group allocation |
|
|
Alloc. |
|
|
|
42.7 |
42.7 |
42.7 |
|
|
Omahu Rd/Expressway Pedestrian Crossing |
Investigation |
123 |
MMM |
Cat2 |
451 |
100% |
50.0 |
50.0 |
- |
- |
Probable |
R/N |
Omahu Rd/Expressway Pedestrian Crossing |
Design |
123 |
MMM |
Cat2 |
451 |
100% |
75.0 |
75.0 |
- |
- |
Probable |
R/N |
Omahu Rd/Expressway Pedestrian Crossing |
Construction |
123 |
MMM |
Cat2 |
451 |
100% |
515.0 |
- |
515.0 |
- |
Probable |
R/N |
Walking and Cycling - Access and community benefits |
Group allocation |
|
|
Alloc. |
|
|
|
- |
- |
- |
|
|
Waipawa to Waipukurau Cycleway |
Design |
126 |
LMM |
Reserve |
452 |
100% |
30.0 |
30.0 |
- |
- |
Res. A |
|
Waipawa to Waipukurau Cycleway |
Construction |
126 |
LMM |
Reserve |
452 |
100% |
412.0 |
- |
412.0 |
- |
Res. A |
|
Waipukurau Cycle Lane Network SH 2 |
Design |
125 |
LMM |
Reserve |
452 |
100% |
30.0 |
30.0 |
- |
- |
Res. A |
|
Waipukurau Cycle Lane Network SH 2 |
Construction |
125 |
LMM |
Reserve |
452 |
100% |
103.0 |
- |
103.0 |
- |
Res. A |
|
Bay View Cycleway - HB Strategy |
Design |
127 |
LMM |
Reserve |
452 |
100% |
75.0 |
75.0 |
- |
- |
Res. A |
|
Bay View Cycleway - HB Strategy |
Construction |
127 |
LMM |
Reserve |
452 |
100% |
1,260.7 |
- |
412.0 |
848.7 |
Res. A |
|
Transport planning |
Napier PFR Funding |
Study |
|
|
Com |
002 |
100% |
30.0 |
22.9 |
- |
- |
|
N |
Activity management plans |
Study |
|
|
Cat2 |
003 |
100% |
944.8 |
325.9 |
309.5 |
309.5 |
|
N |
Hawke's Bay Kiwirap Black Route Safety Strategic Studies |
Study |
110 |
MM_ |
Cat2 |
002 |
100% |
100.0 |
34.0 |
33.0 |
33.0 |
|
N |
Heretaunga Plains Transportation Study Update |
Study |
101 |
MH_ |
Cat2 |
002 |
100% |
152.3 |
75.0 |
77.3 |
- |
|
N |
Hawkes Bay Regional Council |
Public transport services |
Bus services |
Operations |
|
|
App. |
511 |
50% |
6,007.0 |
1,001.2 |
1,001.2 |
1,001.2 |
|
N |
Public transport facilities maintenance and operations |
Operations |
|
|
App. |
514 |
60% |
525.5 |
102.6 |
105.3 |
107.4 |
|
N |
Public transport professional services/ administration |
Operations |
|
|
App. |
|
50% |
652.0 |
107.5 |
108.5 |
110.0 |
|
N |
Total mobility flat payments |
Operations |
|
|
App. |
521 |
100% |
335.6 |
106.5 |
111.8 |
117.4 |
|
N |
Total mobility operations |
Operations |
|
|
App. |
517 |
50% |
1,076.0 |
166.2 |
181.0 |
190.8 |
|
N |
Wheelchair hoists |
Operations |
|
|
App. |
519 |
60% |
41.0 |
12.0 |
- |
12.6 |
|
N |
Passenger Transport (Bus) Improvements for 09-12 - new |
Implementation |
117 |
MMM |
Cat2 |
511 |
50% |
- |
22.5 |
603.4 |
1,003.3 |
Possible |
N |
Demand management & community programmes |
Community Programme 2009-2012 |
Implementation |
|
|
App. |
432 |
75% |
- |
283.2 |
- |
- |
|
N |
Travel Planning - Workplace and Schools |
Implementation |
|
|
N/F |
|
|
|
|
|
|
|
|
Transport planning |
Regional land transport planning management |
Implementation |
|
|
App. |
001 |
100% |
336.4 |
115.7 |
110.4 |
110.3 |
|
|
Hawke's Bay Rural Transport Study |
Study |
102 |
MM_ |
Cat2 |
002 |
75% |
50.0 |
- |
37.5 |
- |
|
N |
HB Regional Transportation Study - Heretaunga Plains (HBRC) |
Study |
101 |
MH_ |
Cat2 |
002 |
75% |
150.0 |
56.3 |
56.3 |
- |
|
N |
Regional Public Transport Plan |
Study |
- |
MM_ |
Cat2 |
003 |
75% |
50.0 |
11.3 |
22.5 |
3.8 |
|
N |
Hawke’s Bay Rail and Coastal Shipping Study |
Study |
- |
|
N/F |
|
|
|
|
|
|
|
|
Regional Walking and Cycling Study |
Study |
- |
|
N/F |
|
|
|
|
|
|
|
|
Supergold card |
Supergold trip adminstration |
Implementation |
|
|
App. |
|
|
30.0 |
10.0 |
10.0 |
10.0 |
|
|
Supergold trip payments |
Implementation |
|
|
App. |
|
|
350.0 |
110.0 |
120.0 |
120.0 |
|
|
Napier City Council |
Renewal of local roads |
Road renewals |
Local Roads |
|
|
App. |
|
|
8,795.6 |
1,407.2 |
1,407.3 |
1,407.3 |
|
N |
Operation and maintenance of local roads |
Road operations and maintenance |
Local Roads |
|
|
App. |
|
|
9,523.0 |
1,507.3 |
1,544.4 |
1,547.1 |
|
N |
New & improved infrastructure for local roads |
Minor improvements 2009/12 |
Local Roads |
|
|
App. |
341 |
|
- |
233.2 |
210.1 |
207.2 |
|
N |
Awatoto to Expressway Link |
Design |
37 |
MMM |
Cat2 |
323 |
58% |
768.0 |
- |
219.5 |
225.9 |
Possible |
R/N |
Prebensen 4 Laning and Hyderabad Overbridge |
Construction |
1 |
MMM |
Cat2 |
323 |
58% |
6,963.0 |
- |
1,933.1 |
2,105.4 |
Possible |
R/N |
Prebensen 4 Laning and Hyderabad Overbridge |
Design |
1 |
MMM |
Cat2 |
323 |
58% |
900.0 |
522.0 |
- |
- |
Possible |
R/N |
Improve, expand or replace network group |
Group allocation |
|
|
Alloc. |
|
|
|
180.0 |
400.0 |
400.0 |
|
|
Guppy Meeanee Intersection upgrade stage 2 |
Design |
- |
MMH |
Cat2 |
321 |
58% |
100.0 |
- |
58.0 |
- |
Probable |
R/N |
Guppy Meeanee Intersection upgrade stage 2 |
Construction |
- |
MMH |
Cat2 |
321 |
58% |
500.0 |
- |
- |
290.0 |
Probable |
R/N |
Lee Rd Meeanee Rd intersection |
Design |
- |
MMM |
Cat2 |
324 |
58% |
200.0 |
116.0 |
- |
- |
Possible |
R/N |
Lee Rd Meeanee Rd intersection |
Construction |
- |
MMM |
Cat2 |
324 |
58% |
2,100.0 |
- |
1,218.0 |
- |
Possible |
R/N |
Maadii Kennedy Wycliffe Intersection Upgrade |
Construction |
- |
MMM |
Cat2 |
324 |
58% |
600.0 |
348.0 |
- |
- |
Possible |
R/N |
Demand management & community programmes |
NAP's Ahuriri West Quay/Pirimai |
Implementation |
|
|
N/F |
|
|
|
|
|
|
|
|
Neighbourhood Accesability Plan - Maraenui and Napier Hill |
Implementation |
|
|
N/F |
|
|
|
|
|
|
|
|
Walking and cycling facilities |
Cycleway Project Stage 6 |
Construction |
- |
|
Com |
452 |
58% |
675.0 |
89.9 |
- |
- |
|
N |
Walking and Cycling - Access and community benefits |
Group allocation |
|
|
Alloc. |
|
|
|
- |
- |
- |
|
|
Cycleway Project Stage 6 |
Construction |
- |
LMM |
Reserve |
452 |
58% |
325.0 |
188.5 |
- |
- |
Res. A |
|
Cycleway Project Stage 6 |
Construction |
- |
LMM |
Reserve |
452 |
58% |
750.0 |
- |
145.0 |
145.0 |
Res. A |
|
Transport planning |
HB Regional Transportation Study - Heretaunga Plains (NCC) |
Study |
101 |
MH_ |
Cat2 |
002 |
75% |
150.0 |
56.3 |
56.3 |
- |
|
N |
TDM/Walking/Cycling Strategy |
Study |
- |
|
N/F |
|
|
|
|
|
|
|
|
Wairoa District Council |
Renewal of local roads |
Road renewals |
Local Roads |
|
|
App. |
|
|
7,464.8 |
1,536.9 |
1,662.0 |
1,727.9 |
|
N |
Operation and maintenance of local roads |
Road operations and maintenance |
Local Roads |
|
|
App. |
|
|
13,995.7 |
3,047.7 |
3,075.8 |
3,119.5 |
|
N |
Emergency Works. 2008/09 - May Event |
Construction |
- |
|
Com |
141 |
66% |
- |
356.4 |
- |
- |
|
N |
New & improved infrastructure for local roads |
Minor improvements 2009/12 |
Local Roads |
|
|
App. |
341 |
|
- |
366.8 |
337.2 |
339.9 |
|
N |
Ormond Drive Realignment |
Construction |
- |
MMM |
Cat2 |
324 |
76% |
446.0 |
339.0 |
- |
- |
Possible |
N |
Walking and cycling facilities |
Walking and Cycling - Access and community benefits |
Group allocation |
|
|
Alloc. |
|
|
|
- |
- |
- |
|
|
Cycleway/Walkway Implementation |
Construction |
128 |
LML |
Reserve |
452 |
76% |
550.0 |
167.2 |
123.6 |
127.2 |
Res. A |
|
Regional development |
Cricklewood Road (RDR) |
Construction |
- |
|
Com |
324 |
100% |
400.0 |
400.0 |
- |
- |
|
|
Willowflat Road (RD) |
Construction |
- |
|
Com |
324 |
100% |
230.0 |
220.0 |
- |
- |
|
|
Riverina road (RDR) |
Construction |
- |
|
Cat2 |
324 |
100% |
50.0 |
- |
50.0 |
- |
|
|
Waitai Valley Road (RDR) |
Construction |
- |
|
Cat2 |
324 |
100% |
240.0 |
- |
240.0 |
- |
|
|
Wairoa District Council SPR |
Renewal of local roads |
Road renewals |
SPR |
|
|
App. |
|
|
115.0 |
35.9 |
39.0 |
40.1 |
|
N |
Operation and maintenance of local roads |
Road operations and maintenance |
SPR |
|
|
App. |
|
|
1,173.3 |
362.7 |
399.4 |
411.2 |
|
N |
New & improved infrastructure for local roads |
Minor improvements 2009/12 |
SPR |
|
|
App. |
341 |
|
- |
31.9 |
31.2 |
31.6 |
|
N |