National Land Transport Programme 2009-2012

Gisborne regional NLTP table

Return to Gisborne regional tables page

Phase Regional priority Profile Status Work category Indicative FAR* Total phase cost 2009/10 NLTF ($000) 2010/11 NLTF ($000) 2011/12 NLTF ($000) Funding priority Funding source*
Gisborne District Council
Renewal of local roads
Road renewals Local Roads App. 26,625.0 5,090.5 5,234.7 5,383.6 N
Prevenattive Maintenance Construction - Cat2 241 59% 174.8 33.4 34.4 35.4
Operation and maintenance of local roads
Road operations and maintenance Local Roads App. 29,574.7 5,750.9 5,825.8 5,881.2 N
New & improved infrastructure for local roads
Minor improvements 2009/12 Local Roads App. 341 - 867.3 787.3 789.9 N
Improve, expand or replace network group Group allocation Alloc. 500.0 500.0 500.0
T Funds - Bridge Replacement - Wharekahika Bridge Construction - MMH Cat2 322 69% 750.0 517.5 - - Probable T
Bridge Replacement - Rip Construction - MMH Cat2 322 69% 1,000.0 - - 690.0 Probable R
Bridge Replacements - Whakoau Bridge Construction - MMH Cat2 322 69% 500.0 - 345.0 - Probable R
Seal Widening - 09/10 Construction - MMM Cat2 324 69% 124.9 86.2 - - Possible R/N
Seal Widening - 10/11 Design - MMM Cat2 324 69% 128.6 - 88.8 - Possible R/N
Seal Widening - 11/12 Investigation - MMM Cat2 324 69% 132.5 - - 91.4 Possible R/N
T Funds Road reconstruction - Waiomatatini Construction - MMM Cat2 324 85% 1,000.0 - 845.0 - Probable T
User benefits improvements group Group allocation Alloc. 400.0 400.0 400.0
Seal Extension - 09/10 Construction - LMM Reserve 325 69% 317.8 219.2 - - Res. A
Seal Extensions - 10/11 Design - LMM Reserve 325 69% 327.3 - 225.8 - Res. A
Seal Extensions - 11/12 Investigation - LMM Reserve 325 69% 337.1 - - 232.6 Res. A
T Funded Seal Extensions - 09/10 - Ruatoria/Tiki Construction - LMM Cat2 325 85% 137.7 116.4 - - Probable T
T Funded Seal Extensions - 10/11 - Te Puia/Toko Construction - LMM Cat2 325 85% 137.7 - 116.4 - Probable T
T Funded Seal Extensions - 11/12 - Te Karaka/Muriw Construction - LMM Cat2 325 85% 137.7 - - 116.4 Probable T
Public transport services
Bus services Operations App. 511 50% 556.2 92.7 92.7 92.7 N
Public transport facilities maintenance and operations Operations App. 514 60% 10.5 2.0 2.1 2.2 N
Public transport professional services/ administration Operations App. 50% 60.0 10.0 10.0 10.0 N
Total mobility flat payments Operations App. 521 100% 29.1 9.6 9.7 9.9 N
Total mobility operations Operations App. 517 50% 283.9 47.3 47.3 47.3 N
Wheelchair hoists Operations App. 519 60% 56.0 8.4 16.8 8.4 N
Demand management & community programmes
Community Programmes 2009 -2012 Implementation App. 432 75% - 173.9 - - N
Walking and Cycling - Access and community benefits Group allocation Alloc. 15.2 15.2 15.2
Cycling and Walking Facilities Construction - LMM Reserve 452 69% 86.1 19.3 19.8 20.3 Res. A
T Funds Cycling and Walking 09/10 - Ruatoria Construction - LMM Cat2 452 85% 50.0 42.3 - - Probable T
T Funds Cycling and Walking 09/10 Te Aroroa Construction - LMM Cat2 452 85% 20.0 16.9 - - Probable T
T Funds Cycling and Walking - 09/10 Tikitiki Construction - LMM Cat2 452 85% 10.0 8.5 - - Probable T
T Funds Cycling and Walking - 10/11 - Te Karaka Construction - LMM Cat2 452 85% 40.0 - 33.8 - Probable T
T Funds Cycling and Walking - 10/11 - Muriwai Construction - LMM Cat2 452 85% 30.0 - 25.4 - Probable T
T Funds Cycling and Walking -11/12 - Te Puia Construction - LMM Cat2 452 85% 30.0 - - 25.4 Probable T
T Funds Cycling and Walking - 11/12 - Tokomaru Bay Construction - LMM Cat2 452 85% 35.0 - - 29.6 Probable T
T Funds Cycling and Walking - 10/11 Tologa Bay Construction - LMM Cat2 452 85% 50.0 - - 42.3 Probable T
Cycleway - Awapuni to MacDonald Road (R Funded) Construction - LML Reserve 452 69% 241.9 - 166.9 - Res. A
Cycleway Grey Street - Midway Surf Club (R Funded) Construction - LML Reserve 452 69% 400.0 276.0 - - Res. A
Taruheru Cycleway River Walkway - R funded Construction - LML Reserve 452 69% 1,000.0 6.9 338.1 345.0 Res. A
Cycleway - Gisborne to Wainui (R Funded) Construction 1 LML Reserve 452 69% 266.6 184.0 - - Res. A
Transport planning
Regional land transport planning management Implementation App. 001 100% 159.5 54.9 52.4 52.3
District Wide Bridge Review Programme Study - MM_ Cat2 002 75% 400.0 75.0 75.0 150.0 N
Study - Regional Passenger Transport Plan Study - MM_ Cat2 003 75% 50.0 37.5 - - N
Study - Strategic Route Security Study - MM_ Cat2 002 75% 25.0 - 18.8 - N
Study - Accessibility Study for Rural Coastal Towns Study - N/F
Study - Environmental Quality of Pedestrian and Cycle Routes Study - N/F
Regional development
Lower Tauwhareparae Road (RD) Construction - Com 324 100% 900.0 600.0 - -
Waimata Valley Road STage 2 (RD) Construction - Com 324 100% 4,600.0 2,400.0 - -
Arero Road (RD) Construction - Cat2 324 100% 20.0 - 20.0 -
Armstrong Road (RD) Construction - Cat2 324 100% 130.0 130.0 - -
Hokoroa Road (RD) Construction - Cat2 324 100% 700.0 - 700.0 -
Keelan Road (RD) Construction - Cat2 324 100% 180.0 180.0 - -
Maraetaha Rd Intersection (RD) Construction - Cat2 324 100% 100.0 - 100.0 -
Maraetaha Road (RD) Construction - Cat2 324 100% 65.0 - 65.0 -
Tarewa Road (RD) Construction - Cat2 324 100% 650.0 - 650.0 -
Tauwhareparae Road Various [RD] Construction 4 Cat2 324 100% 1,200.0 1,200.0 - -
Tuahu Road (RD) Construction - Cat2 324 100% 30.0 - 30.0 -
Tuakau Road (RD) Construction - Cat2 324 100% 550.0 - 550.0 -
Tutamoe Road (RD) Construction - Cat2 324 100% 425.0 - 425.0 -
Upper Mata Road (RD) Construction - Cat2 324 100% 325.0 - 325.0 -
Upper Tauwhareparae Road (RD) Construction - Cat2 324 100% 325.0 - 325.0 -
Waimata/Hokoroa Road (RD) Construction - Cat2 324 100% 100.0 100.0 - -
Waipaoa Bridge (RD) Construction - Cat2 324 100% 500.0 500.0 - -
Supergold card
Supergold trip adminstration Implementation App. 3.0 1.0 1.0 1.0
Supergold trip payments Implementation App. 45.0 15.0 15.0 15.0
Gisborne Highway & Network Operations
Renewal of state highways
Road renewals State Highways App. 16,553.6 6,745.7 4,903.9 4,903.9 N
Preventive Maintenance 9/12 Construction - Cat2 241 100% 5,179.9 1,758.2 1,845.8 1,575.9
Scour Investigation 9/12 Construction - Cat2 241 100% 321.0 104.0 107.0 110.0
Operation and maintenance of state highways
Road operations and maintenance State Highways App. 20,377.6 6,789.5 6,794.0 6,794.0 N
EW SH35 Kemps Hill 08/09 Construction - Com 141 100% - 200.0 - - N
New & improved infrastructure for State highways
SH 35 Tolaga to Gisborne Seal Widening Design Com 324 100% 70.0 20.0 - - R
Dymock Road Curve Construction Com 100% 370.0 370.0 - - R
Kopuaroa No 3 Bridge Replacement Design Com 100% 191.7 30.0 - - R
Panikau Hill Slow Vehicle Bays Investigation Com 100% 33.0 33.0 - - R
SH2 Pilmer & Farmer Roads I/S Investigation Com 100% 90.0 20.0 - - N
SH35 Slow Vehicle Bays Stage 1 Design Com 100% 40.0 40.0 - - N
Minor improvements 2009/12 State Highways App. 341 - 874.2 802.2 802.2 N
SH 35 Tolaga to Gisborne Seal Widening Construction 1 MML Cat2 324 100% 6,510.2 1,034.9 1,596.4 1,655.6 Probable R/N
Improve, expand or replace network group Group allocation Alloc. 2,218.8 2,440.6 2,440.6
Curve Nth of Makarika Rd Construction - MMH Cat2 324 100% 570.0 570.0 - - Probable R
Gisborne Napier Passing Opportunities -Gisborne Design - MMH Cat2 324 100% 85.0 - 85.0 - Probable R
Gisborne Napier Passing Opportunities -Gisborne Construction - MMH Cat2 324 100% 800.0 - 250.0 250.0 Probable R
Gisborne Stock Effluent Facility Construction - MMH Cat2 321 100% 220.0 220.0 - - Probable R
SH2 Pilmer & Farmer Roads I/S Design - MMH Cat2 324 100% 45.0 45.0 - - Probable R
SH2 Pilmer & Farmer Roads I/S Construction - MMH Cat2 324 100% 849.0 - 849.0 - Probable R
Busby's Hill Realignment Investigation - MMM Cat2 324 100% 106.0 - 106.0 - Probable R/N
Improved Driver Information 9/12 Construction - MMM Cat2 321 100% 366.0 118.4 122.0 125.6 Probable R/N
Kopuaroa Hill Realignment Investigation - MMM Cat2 324 100% 106.0 106.0 - - Probable R/N
Kopuaroa Hill Realignment Design - MMM Cat2 324 100% 109.0 - 109.0 - Probable R/N
Kopuaroa Hill Realignment Construction - MMM Cat2 324 100% 4,500.0 - - 1,200.0 Probable R/N
North Tolaga S/W Investigation - MMM Cat2 324 100% 109.0 - - 109.0 Probable R/N
Panikau Hill Slow Vehicle Bays Design - MMM Cat2 324 100% 40.0 - 40.0 - Probable R/N
Panikau Hill Slow Vehicle Bays Construction - MMM Cat2 324 100% 600.0 - - 600.0 Probable R/N
Pavement Smoothing 9/12 Construction - MMM Cat2 324 100% 30.2 10.2 10.4 9.6 Probable R/N
Property Acquisitions 9/12 Property - MMM Cat2 331 100% 315.6 102.1 105.2 108.3 Probable R/N
Rehabilitation Seal Widening 9/12 Construction - MMM Cat2 324 100% 457.5 148.0 152.4 157.0 Probable R/N
Safety Retrofit 9/12 Construction - MMM Cat2 324 100% 1,372.4 444.0 457.3 471.1 Probable R/N
SH 35 Slow Vehicle Bays Stage 1 Construction - MMM Cat2 324 100% 84.0 - - 84.0 Probable R/N
SH 35 Slow Vehicle Bays Stage 2 Construction - MMM Cat2 324 100% 782.0 - - 782.0 Probable R/N
Strategic Plan Initiatives 9/12 Construction - MMM Cat2 324 100% 1,097.9 355.2 365.9 376.8 Probable R/N
Gudgeon's Hill Stability Work Investigation - MMM Cat2 324 100% 125.0 - 125.0 - Probable R/N
Gudgeon's Hill Stability Work Design - MMM Cat2 324 100% 100.0 - - 100.0 Probable R/N
Kopuaroa No 3 Bridge Replacement Construction - MML Cat2 322 100% 2,090.0 1,031.0 1,059.0 - Possible N
SH 2 Motu Bridge Replacement Investigation - MML Cat2 322 100% 150.0 - 150.0 - Possible N
SH2 Motu Bridge Replacement Design - MML Cat2 322 100% 240.0 - - 240.0 Possible N
North Tolaga S/W Construction Reserve 5,873.1 Res. B
North Tolaga S/W Design Reserve 202.6 Res. B
Demand management & community programmes
Community Advertising 9/12 - Gisborne Implementation App. 432 100% - 7.3 - - N
Walking and cycling facilities
Walking and Cycling - Access and community benefits Group allocation Alloc. - - -
SH 35 Awapuni to Mc Donald Cycleway Design - LMM Reserve 452 100% 30.9 - 30.9 - Res. A
SH 35 Awapuni to Mc Donald Cycleway Construction - LMM Reserve 452 100% 318.3 - - 318.3 Res. A
SH 35 Awapuni to Mc Donald Cycleway Investigation - LMM Reserve 452 100% 40.0 40.0 - - Res. A
Customhouse St Bridge Footpath Widening Construction - LMM Reserve 451 100% 50.0 50.0 - - Res. A
Gisborne - Wainui Cycleway SH 35 Construction - LMM Reserve 452 100% 500.0 500.0 - - Res. A
Transport planning
Activity management plans Study Cat2 003 100% 611.3 215.6 197.9 197.9 N
Gisborne Kiwirap Black Routes Safety Study Study - MM_ Cat2 002 100% 100.0 34.0 33.0 33.0 N
Gisborne Safe and Sustainable Freight Access Study - MM_ Cat2 002 100% 100.0 34.0 33.0 33.0 N

Return to Gisborne regional tables page