BOP Highway & Network Operations
Renewal of state highways
Road renewals State Highways App. 65,784.2 24,128.0 20,828.1 20,828.1 N
Preventive Maintenance 9/12 Construction 1 Cat2 241 100% 3,262.9 1,393.5 928.9 940.5
Scour Investigation 9/12 Construction 122 Cat2 241 100% 352.0 114.0 117.0 121.0
Operation and maintenance of state highways
Road operations and maintenance State Highways App. 66,907.3 22,292.6 22,307.4 22,307.4 N
EW (3873 & 3877) Matata & TCC Event BOP R4 18 May 05 Construction - Com 141 100% - 996.9 - - N
New & improved infrastructure for State highways
Hairini Link (Stages 3 and 4) Investigation 9 Com 324 100% 2,340.6 1,546.1 794.6 - R
Harbour Link Construction 5 Com 323 100% 192,099.0 20,000.3 249.7 - C
Katikati Bypass Investigation 20 Com 324 100% 619.2 107.9 - - R
Omokoroa Road intersection improvements Investigation 15 Com 323 100% 530.6 82.0 - - N
Pyes Pa Bypass Construction 19 Com 324 100% 14,339.7 9,796.9 4,542.8 - R
Pyes Pa Bypass Construction 19 Com 323 100% 8,000.0 4,500.0 3,500.0 - R
Tauranga Central Corridor: Hairini Link Adv Works (Stage 2) Design 23 Com 324 100% 506.1 312.1 - - N
Tauranga Eastern Link Design 6 Com 324 100% 2,500.0 2,500.0 - - R
Tauranga Eastern Link Property 6 Com 331 100% 51,985.8 35,305.1 16,680.8 - R & N
Tauranga Northern Link Investigation 8 Com 324 100% 3,100.0 1,554.2 1,545.8 - R
Waitahanui Bridge Replacement. Design - Com 322 100% 377.7 - 159.6 218.0 N
Apirana Curves Realignment Investigation Com 100% 104.2 42.4 - - N
Awaiti Intersection Improvements Investigation Com 100% 105.0 59.9 - - N
Banksia Rd PL Investigation Com 100% 83.6 42.4 - - N
Fairy Springs 4L Stage 2 Construction Com 100% 4,295.0 2,255.0 2,040.0 - N
Five Mile Gate PL Investigation Com 100% 100.0 70.0 - - N
Mangorewa Stream North & South Bridge Widening Construction Com 100% 4,259.0 2,000.0 1,289.0 - N
Soldiers Road Realignment + IS Investigation Com 100% 200.1 60.8 - - N
Sun Valley Realignment Investigation Com 100% 157.3 107.3 - - N
Taneatua Rail Overbridge Investigation Com 100% 160.5 60.0 - - N
Waipa Curve Realignment Investigation Com 100% 125.1 85.1 - - N
Wharawhara Road Roundabout Investigation Com 100% 280.1 90.0 - - N
Minor improvements 2009/12 State Highways App. 341 - 2,998.2 2,958.0 2,958.0 N
Bethlehem to Route J - Four laning (SH2) Design MMH Cat2 323 100% 636.5 - 636.5 - Probable R/N
Bethlehem to Route J - Four laning (SH2) Investigation 14 MMH Cat2 323 100% 412.0 412.0 - - Probable R/N
Bethlehem to Route J - Four laning (SH2) Property MMH Cat2 323 100% 2,200.8 - 468.6 731.9 Probable R/N
Reids Canal Bridge Replacement (Large Project) Construction 11 MMH Cat2 322 100% 6,069.7 - 182.0 5,565.3 Probable R/N
Reids Canal Bridge Replacement (Large Project) Design 11 MMH Cat2 322 100% 468.1 309.2 158.9 - Probable R/N
Reids Canal Bridge Replacement (Large Project) Property MMH Cat2 322 100% 51.5 51.5 - - Probable R/N
Tauranga Central Corridor: Hairini Link Adv Works (Stage 2) Construction 23 MMH Cat2 324 100% 5,965.0 1,163.0 3,891.0 911.0 Probable R/N
Tauranga Eastern Link Construction 6 HHL Cat2 324 100% 469,050.7 - - 54,995.8 Probable C/N
Tauranga Eastern Link Construction HHL Cat2 31,517.2 10,328.3 21,188.9 - Probable R
Katikati Bypass Design MMM Cat2 324 100% 2,169.5 - 530.5 1,639.1 Probable R/N
Katikati Bypass Property MMM Cat2 324 100% 5,033.6 - 526.1 1,094.7 Probable R/N
Omokoroa Road intersection improvements Design MMM Cat2 323 100% 318.3 - 318.3 - Probable R/N
Tauriko Bypass Design 21 MMM Cat2 323 100% 2,060.0 2,060.0 - - Probable R/N
Waitahanui Bridge Replacement. Property MMM Cat2 322 100% 401.3 - - 132.3 Probable R/N
Hairini Link (Stages 3 and 4) Property 9 MLL Reserve 331 100% 1,688.8 - - 544.0 Res. A
Rotorua Eastern Arterial Investigation 7 LML Reserve 323 100% 2,083.0 1,292.5 790.6 - Res. A
Strategic network group Group allocation Alloc. 2,437.5 2,681.3 2,681.3
Soldiers Road Realignment + IS Design 30 HMH Cat2 324 100% 150.0 120.0 30.0 - Probable R
Soldiers Road Realignment + IS Construction 30 HMH Cat2 324 100% 4,500.0 - - 2,500.0 Probable R
Kaimais SI - SH29 NSC Investigation 52 HMM Cat2 324 100% 156.0 77.0 79.0 - Probable R/N
Kaimais SI - SH29 NSC Design 52 HMM Cat2 324 100% 66.0 - 66.0 - Probable R/N
Kaimais SI - SH29 NSC Construction 52 HMM Cat2 324 100% 3,000.0 - 1,500.0 1,500.0 Probable R/N
Kaimais SI - SH29 NSC Stage 2 Investigation 52 HMM Cat2 324 100% 82.0 - - 82.0 Probable R/N
Maunganui Rd/Girven Rd Roundabout Signalisation Investigation - HMM Cat2 324 100% 0.1 0.1 - - Probable R
Maunganui Rd/Girven Rd Roundabout Signalisation Design - HMM Cat2 324 100% 0.2 0.2 - - Probable R
Maunganui Rd/Girven Rd Roundabout Signalisation Construction - HMM Cat2 324 100% 1.5 - 1.5 - Probable R
Redwood-Omanawa Road Realignment Investigation 51 HMM Cat2 324 100% 200.0 200.0 - - Probable R/N
Redwood-Omanawa Road Realignment Design 51 HMM Cat2 324 100% 250.0 - 250.0 - Probable R/N
Redwood-Omanawa Road Realignment Construction 51 HMM Cat2 324 100% 4,500.0 - - 2,000.0 Probable R/N
Sun Valley Realignment Design 108 HMM Cat2 324 100% 85.0 - 85.0 - Probable R/N
Tauranga Signage Upgrade (SH2/29) Design 132 HMM Cat2 324 100% 52.0 52.0 - - Probable R
Maketu Road I/S Improvement Te Puke Investigation 93 HHL Cat2 324 100% 108.0 - 53.0 55.0 Probable N
Pah Road I/S Improvement Te Puke Investigation 94 HHL Cat2 324 100% 55.0 - - 55.0 Probable N
Improve, expand or replace network group Group allocation Alloc. 5,531.3 6,084.4 6,084.4
Arden Cottage Curves Realignment Investigation 26 MMH Cat2 324 100% 140.0 80.0 60.0 - Probable R/N
Arden Cottage Curves Realignment Design 26 MMH Cat2 324 100% 165.0 - - 165.0 Probable R/N
Banksia Rd PL Design 27 MMH Cat2 324 100% 53.0 - 53.0 - Probable R/N
Bethlehem Township Four-Laning Design 58 MMH Cat2 324 100% 52.0 52.0 - - Probable R/N
Bethlehem Township Four-Laning Construction 58 MMH Cat2 324 100% 2,300.0 - 1,500.0 800.0 Probable R/N
Five Mile Gate PL Design 57 MMH Cat2 324 100% 52.0 52.0 - - Probable R/N
Five Mile Gate PL Construction 57 MMH Cat2 324 100% 665.0 - - 329.0 Probable R/N
Forest Passing Lane (SH33) Investigation 59 MMH Cat2 324 100% 82.0 82.0 - - Probable R/N
Forest Passing Lane (SH33) Design 59 MMH Cat2 324 100% 64.0 - 64.0 - Probable R/N
Mangapouri Bridge Widening Design 29 MMH Cat2 322 100% 36.0 36.0 - - Probable R/N
Mangapouri Bridge Widening Construction 29 MMH Cat2 322 100% 1,292.0 - 637.0 655.0 Probable R/N
Ngongotaha BP Service Station Curve Realignment Investigation 60 MMH Cat2 324 100% 55.0 - - 55.0 Probable R/N
Pekatahi Road/Rail Bridge Upgrade Investigation 55 MMH Cat2 322 100% 152.0 52.0 100.0 - Probable R/N
Pekatahi Road/Rail Bridge Upgrade Design 55 MMH Cat2 322 100% 164.0 - 64.0 100.0 Probable R/N
Pekatahi Road/Rail Bridge Upgrade Construction 55 MMH Cat2 322 100% 1,375.0 - - 680.0 Probable R/N
Rotoma Hills PL Investigation 134 MMH Cat2 324 100% 84.9 - 84.9 - Probable R/N
Rotoma Hills PL Design 134 MMH Cat2 324 100% 65.6 - - 65.6 Probable R/N
Rotoma Hills SVB Investigation 135 MMH Cat2 324 100% 76.5 - - 76.5 Probable R/N
SH29 SEDF Investigation 56 MMH Cat2 321 100% 50.0 50.0 - - Probable R/N
SH29 SEDF Construction 56 MMH Cat2 321 100% 600.0 - - 600.0 Probable R/N
Taneatua Rail Overbridge Design 25 MMH Cat2 322 100% 64.0 64.0 - - Probable R/N
Taneatua Rail Overbridge Construction 25 MMH Cat2 322 100% 576.0 - 576.0 - Probable R/N
Waipa Curve Realignment Design 28 MMH Cat2 324 100% 86.0 - 42.0 44.0 Probable R/N
Apirana Curves Realignment Design 50 MMM Cat2 324 100% 74.0 - 74.0 - Probable N
Improved Driver Information 9/12 Construction 110 MMM Cat2 321 100% 1,246.1 403.2 415.2 427.7 Probable R/N
Kopuroa PL Investigation 48 MMM Cat2 324 100% 87.0 - - 87.0 Probable N
Maraeroa PL Design 124 MMM Cat2 324 100% 64.0 32.0 32.0 - Probable N
Maraeroa PL Construction 124 MMM Cat2 324 100% 1,650.0 - - 1,650.0 Probable N
Ngongotaha RAB Tidal Improvements (Lights) Design - MMM Cat2 321 100% 21.0 21.0 - - Probable N
Ngongotaha RAB Tidal Improvements (Lights) Construction - MMM Cat2 321 100% 130.0 130.0 - - Probable N
Pavement Smoothing 9/12 Construction 131 MMM Cat2 324 100% 2,200.0 505.0 726.2 968.8 Probable R/N
Property Acquisitions 9/12 Property 104 MMM Cat2 331 100% 1,950.0 600.0 650.0 700.0 Probable R/N
Rehabilitation Seal Widening 9/12 Construction 105 MMM Cat2 324 100% 1,557.6 503.9 519.1 534.6 Probable R/N
Rotorua Weighpit Facilities (SH33/36) Investigation 109 MMM Cat2 321 100% 31.0 31.0 - - Probable R/N
Rotorua Weighpit Facilities (SH33/36) Design 109 MMM Cat2 321 100% 32.0 - 32.0 - Probable R/N
Rotorua Weighpit Facilities (SH33/36) Construction 109 MMM Cat2 321 100% 513.0 250.0 - 263.0 Probable R/N
Safety Retrofit 9/12 Construction 4 MMM Cat2 324 100% 3,069.0 1,511.8 1,557.2 - Probable R/N
Seismic Retrofit 9/12 Construction 113 MMM Cat2 324 100% 1,494.0 1,444.0 - 50.0 Probable R/N
SH2 Katikati Urban SI Investigation 107 MMM Cat2 324 100% 41.0 41.0 - - Probable N
SH2 Katikati Urban SI Design 107 MMM Cat2 324 100% 42.0 42.0 - - Probable N
SH2 Katikati Urban SI Construction 107 MMM Cat2 324 100% 760.0 - 760.0 - Probable N
SH29 SEDF Design 56 MMM Cat2 321 100% 20.0 - 20.0 - Probable R/N
Strategic Plan Initiatives 9/12 Construction 121 MMM Cat2 321 100% 738.3 209.5 245.7 283.1 Probable R/N
Waitahanui Realignment Design 17 MMM Cat2 324 100% 106.1 - 106.1 - Probable R/N
Wharawhara Road Roundabout Design 123 MMM Cat2 324 100% 108.0 - 53.0 55.0 Probable N
Bridgeman Lane PL Investigation 127 MML Cat2 324 100% 66.0 66.0 - - Possible N
Bridgeman Lane PL Design 127 MML Cat2 324 100% 63.0 21.0 42.0 - Possible N
Kauri Point PL Design 130 MML Cat2 324 100% 94.0 41.0 53.0 - Possible N
Kauri Point PL Construction 130 MML Cat2 324 100% 2,500.0 - - 1,500.0 Possible N
Marshall Street Signalisation Design 129 MML Cat2 324 100% 72.0 - - 72.0 Possible N
Response to Development - BOP Investigation 111 MML Cat2 321 100% 103.0 103.0 - - Possible N
Response to Development - BOP Design 111 MML Cat2 321 100% 106.0 - 106.0 - Possible N
Response to Development - BOP Construction 111 MML Cat2 321 100% 1,500.0 - - 500.0 Possible N
SH30/33 Intersection Investigation 92 MML Cat2 324 100% 162.0 - 80.0 82.0 Possible N
Tuapiro Rd PL Design 126 MML Cat2 324 100% 100.0 - 100.0 - Possible N
Worlsley Rd PL Investigation 128 MML Cat2 324 100% 88.0 88.0 - - Possible N
Worlsley Rd PL Design 128 MML Cat2 324 100% 63.0 21.0 42.0 - Possible N
Bethlehem to Route J - Four laning (SH2) Construction Reserve 18,632.5 Res. B
Maunganui Rd/Girven Rd I/S Construction 13 Reserve 17,416.0 Res. B
Maunganui Rd/Girven Rd I/S Design 13 Reserve 605.0 Res. B
Maunganui Rd/Girven Rd I/S Investigation 13 Reserve 587.0 Res. B
Rotorua Eastern Arterial Design 7 Reserve 3,517.2 Res. B
Rotorua Eastern Arterial Property 7 Reserve 9,167.0 Res. B
Tauranga Northern Link Design 8 Reserve 7,203.0 Res. B
Hemo Rd / Old Taupo Rd Intersection Investigation - N/F
Public transport infrastructure
Tauranga Central Corridor Improvements Stage 4 Design - N/F
Tauranga Central Corridor Improvements Stage 4 Investigation - N/F
Demand management & community programmes
Community Advertising 9/12 - Bay of Plenty Implementation App. 432 100% - 44.0 - - N
Walking and cycling facilities
Poike Road Pedestrian & Cycle Facility Investigation 125 Com 452 100% 30.0 20.0 - - N
Walking and Cycling - Key safety and congestion Group allocation Alloc. 151.8 151.8 151.8
Te Maunga Pedestrian Strategy Link Design 53 MMM Cat2 451 100% 55.0 55.0 - - Possible R/N
Te Maunga Pedestrian Strategy Link Construction 53 MMM Cat2 452 100% 318.3 - 318.3 - Possible R/N
Wairoa Bridge Ped/Cycle SI Investigation 54 MMM Cat2 452 100% 20.0 20.0 - - Possible R/N
Wairoa Bridge Ped/Cycle SI Design 54 MMM Cat2 452 100% 45.0 35.0 10.0 - Possible R/N
Wairoa Bridge Ped/Cycle SI Construction 54 MMM Cat2 452 100% 700.0 - 500.0 200.0 Possible R/N
Walking and Cycling - Access and community benefits Group allocation Alloc. - - -
Mourea Bridge Pedestrian Cycleway Investigation 98 LMM Reserve 452 100% 50.0 40.0 - - Res. A
Mourea Bridge Pedestrian Cycleway Design 98 LMM Reserve 452 100% 50.0 20.0 30.0 - Res. A
Mourea Bridge Pedestrian Cycleway Construction 98 LMM Reserve 452 100% 821.0 - - 821.0 Res. A
Transport planning
BOP Regional SH Strategy Study Com 002 100% 140.0 44.4 - - N
Eastern Bay of Plenty Route Security Study Study Com 002 100% 250.0 246.4 - - N
Omokoroa Park and Ride Study Study Com 002 100% 25.0 5.1 - - N
Rotorua Central Strategic Study Study Com 002 100% 250.0 53.1 - - N
Tauranga Northern Corridor Strategic Study Study Com 002 100% 547.1 45.9 - - N
Tauranga South-Western Corridor Strategic Study Study Com 002 100% 235.9 145.2 - - N
Activity management plans Study Cat2 003 100% 2,198.3 739.2 729.5 729.5 N
BoP Interregional freight and passenger route study Study 33 HM_ Cat2 002 100% 100.0 100.0 - - N
BoP Kiwirap Black Routes Safety Study Study 35 MM_ Cat2 002 100% 100.0 100.0 - - N
BOP Passing Opportunties Study 41 MM_ Cat2 002 100% 250.0 - 100.0 150.0 N
BoP Regional Transportation Study Study 44 MM_ Cat2 002 100% 400.0 100.0 200.0 100.0 N
BoP Strategic Walking and Cycling Study Study 36 MM_ Cat2 002 100% 80.4 - 53.0 27.3 N
Central Tauranga Roading Improvements Study 37 MH_ Cat2 002 100% 100.0 - 100.0 - N
Eastern BoP Network Form Study 45 MM_ Cat2 002 100% 54.6 - - 54.6 N
Greater Rotorua (SH 5,30,30a,33,36) Strategic Study Study 40 MH_ Cat2 002 100% 209.1 103.0 106.1 - N
Greater Tauranga (SH 2/29/36) Strategic Study Study 32 HH_ Cat2 002 100% 213.8 - 159.1 54.6 N
Kaimai to Tauranga (SH29) Strategic Study Study 34 HH_ Cat2 002 100% 209.1 103.0 106.1 - N
Safe and Sustainable Freight Access Study 39 HM_ Cat2 002 100% 100.0 - - 100.0 N
State Highway Optimisation Strategies Study 46 ML_ Cat2 002 100% 106.1 34.3 35.4 36.4 N
Twin City Link Function and Form Study Study 47 MM_ Cat2 002 100% 79.6 - 79.6 - N
Waihi to Tauranga (SH2) Strategic Study Study 43 MH_ Cat2 002 100% 150.0 - 100.0 50.0 N
BoP PT and Modal Shift (Rural Bus Facilities) Strategy Study - N/F
BoP State Highway Activity Management Plan review Study - N/F
Environment Bay of Plenty
Public transport services
Bus & ferry concession fares Operations App. 513 50% 154.5 25.0 25.8 26.4 N
Bus services Operations App. 511 50% 22,431.4 3,738.6 3,738.6 3,738.6 N
Public transport facilities maintenance and operations Operations App. 514 60% 2,434.5 493.2 474.3 493.2 N
Public transport professional services/ administration Operations App. 50% 1,369.2 228.2 228.2 228.2 N
Total mobility flat payments Operations App. 521 100% 277.4 92.5 92.5 92.5 N
Total mobility operations Operations App. 517 50% 1,490.0 240.0 250.0 255.0 N
Wheelchair hoists Operations App. 519 60% 110.0 21.0 21.0 24.0 N
EBOP Improved Public Transport Implementation 10 MMM Cat2 511 50% - 194.1 936.2 1,877.5 Possible N
EBOP Improved Public Transport Implementation 10 MMM Cat2 514 60% - 7.8 - 2.4 Possible N
Demand management & community programmes
EBOP Regional Community Programmes 2009/12 Implementation App. 432 75% - 139.7 - - N
Transport planning
Public Transport - Bay of Plenty Stocktake Study - Com 002 75% 65.0 41.3 - - N
Regional land transport planning management Implementation App. 001 100% 775.2 266.5 254.5 254.2
Review of National and International PT and Best Practice Study 88 HH_ App. 002 75% 35.0 22.5 - - N
EBOP Ageing Population study Study 82 MM_ Cat2 002 75% 15.0 11.3 - - N
EBOP Alternative Tauranga Harbour rail crossing Study 74 LL_ Cat2 002 75% 35.0 26.3 - - N
EBOP Eastern Bay rail corridors Study 77 LL_ Cat2 002 75% 20.0 - 15.0 - N
EBOP Forestry Roads Study Study 85 MM_ Cat2 002 75% 50.0 - - 37.5 N
EBOP Impacts of Regional Growth on Transport Study Study 86 MM_ Cat2 002 75% 80.0 60.0 - - N
EBOP Reduce Noise and Vibration study Study 69 MM_ Cat2 002 75% 25.0 18.8 - - N
EBOP Regional Freight Study Study 62 HM_ Cat2 002 75% 100.0 75.0 - - N
EBOP Regional Walking and Cycling Network Planning Study 89 MM_ Cat2 002 75% 70.0 26.3 26.3 - N
EBOP RLTS Monitoring Framework Study 91 HM_ Cat2 002 75% 40.0 15.0 7.5 7.5 N
EBOP RPTP Review Study 68 MH_ Cat2 003 60% 200.0 60.0 - - N
EBOP Alternative Waikato rail link Study - N/F
EBOP Public Health Access Study Study - N/F
EBOP Rail electrification investigation Study - N/F
EBOP Relationship Transport Improvements & Economic Develpmt Study - N/F
EBOP RLTS Implementation Study - N/F
EBOP Sub standard transportation networks study Study - N/F
Supergold card
Supergold trip adminstration Implementation App. 30.0 10.0 10.0 10.0
Supergold trip payments Implementation App. 980.0 320.0 330.0 330.0
Kawerau District Council
Renewal of local roads
Road renewals Local Roads App. 638.0 142.0 144.7 140.7 N
Operation and maintenance of local roads
Road operations and maintenance Local Roads App. 719.3 169.1 154.0 158.8 N
New & improved infrastructure for local roads
Minor improvements 2009/12 Local Roads App. 341 - 24.9 21.3 21.0 N
Opotiki District Council
Renewal of local roads
Road renewals Local Roads App. 2,022.0 334.1 345.8 351.3 N
Operation and maintenance of local roads
Road operations and maintenance Local Roads App. 4,010.1 661.6 688.2 695.4 N
Amokura Road Washout Flood Damage Construction - Com 141 52% - 49.4 - - N
New & improved infrastructure for local roads
Minor improvements 2009/12 Local Roads App. 341 - 79.6 73.6 73.4 N
User benefits improvements group Group allocation Alloc. 100.0 100.0 100.0
Papanui Road Seal Extension Construction - LML Reserve 325 61% 120.0 73.2 - - Res. A
Walking and cycling facilities
Walking and Cycling - Access and community benefits Group allocation Alloc. - - -
Transport planning
Transport Planning 002 Opotiki Harbour Development Study - N/F
Rotorua District Council
Renewal of local roads
Road renewals Local Roads App. 14,013.3 2,146.8 2,146.4 2,152.9 N
Operation and maintenance of local roads
Road operations and maintenance Local Roads App. 13,836.8 2,082.9 2,127.4 2,162.7 N
New & improved infrastructure for local roads
Malfroy/Ranolf Roundabout Construction - Com 324 56% 1,333.0 280.0 - - N
Minor improvements 2009/12 Local Roads App. 341 - 338.4 304.2 302.6 N
Lake Rd 4-Laning Design 12 MMH Cat2 324 56% 7,342.4 90.7 4,021.0 - Probable R/N
Public transport infrastructure
Rotorua Transportation Centre Design 49 MMM Cat2 531 60% 3,271.0 150.0 1,200.0 612.6 Possible N
Demand management & community programmes
Road Safety & Sustainability Projects 2009/12 Implementation App. 432 75% - 218.9 - - N
Rotorua District Traffic Demand Management Implementation Cat2 432 75% - 24.6 - - N
Walking and cycling facilities
CBD To Ngongotaha Cycling Route Construction - Com 452 56% 900.0 84.0 84.0 84.0 N
Walking and Cycling - Access and community benefits Group allocation Alloc. - - -
Tauranga City Council
Renewal of local roads
Road renewals Local Roads App. 17,103.8 2,379.2 2,451.0 2,524.4 N
Operation and maintenance of local roads
Road operations and maintenance Local Roads App. 16,912.9 2,432.5 2,447.9 2,455.4 N
New & improved infrastructure for local roads
Pyes Pa Bypass Construction 3 Com 323 53% 8,000.0 2,385.0 1,855.0 - R
Minor improvements 2009/12 Local Roads App. 341 - 384.9 348.7 349.2 N
TCC Tara Rd 4 laning Construction 16 MMH Cat2 324 53% 3,720.0 - 678.3 615.0 Probable R/N
Improve, expand or replace network group Group allocation Alloc. - 400.0 -
TCC Beaumaris Bvd/Sterling Gate/SH2 Link Road Construction - MMM Cat2 323 53% 800.0 424.0 - - Possible N
Public transport infrastructure
Urban transport choice, network improvements & safety PT group Group allocation Alloc. 150.0 150.0 150.0
Tauranga Transport Centre construction Construction 31 MMM Cat2 531 60% 750.0 180.0 270.0 - Possible N
Demand management & community programmes
Tauranga City Community Programmes Implementation App. 432 75% - 560.3 - - N
Walking and cycling facilities
Walking and Cycling - Access and community benefits Group allocation Alloc. - - -
Transport planning
Tauranga Central Business District Travel Demand Management Study 71 MH_ Cat2 002 75% 74.2 55.7 - - N
TCC Arataki Transport Centre Study 84 MM_ Cat2 002 75% 80.0 60.0 - - N
TCC Cameron Rd - Multi Modal Corridor Study Study 79 MM_ Cat2 002 75% 200.0 75.0 37.5 37.5 N
TCC Girven Rd Form and Function study Study 72 MM_ Cat2 002 75% 100.0 - 37.5 37.5 N
TCC Hairini Link Corridor Strategy Study - MM_ Cat2 002 75% 35.0 26.3 - - N
TCC Transport Model Development Planning Study 61 HH_ Cat2 002 75% 70.0 37.5 15.0 - N
TCC WELCOME BAY ALTERNATIVE LINK STUDY Study 73 MM_ Cat2 002 75% 50.0 37.5 - - N
Western BoP District Council
Operation and maintenance of local roads
Road operations and maintenance Local Roads App. 36,547.9 5,473.3 5,493.2 5,493.2 N
Emergency Works 2008 Construction - Com 141 45% - 36.0 - - N
New & improved infrastructure for local roads
Minor improvements 2009/12 Local Roads App. 341 - 437.9 391.0 385.2 N
Improve, expand or replace network group Group allocation Alloc. - 400.0 400.0
Welcome Bay Road Realignment @ 3.92km Construction - MMM Cat2 324 55% 1,500.0 825.0 - - Possible R/N
Demand management & community programmes
Community programmes Implementation N/F
Walking and cycling facilities
Walking and Cycling - Access and community benefits Group allocation Alloc. - - -
Footpath development Construction 97 LML Reserve 451 55% 900.0 49.5 49.5 49.5 Res. A
Combined off road walking and cycleway development Construction 97 LML Reserve 451 55% 1,000.0 55.0 55.0 55.0 Res. A
Transport planning
Transportation Activity Management Plan - 2009 Update Study 64 ML_ 003 55% 1,100.0 55.0 55.0 55.0 N
Whakatane District Council
Renewal of local roads
Road renewals Local Roads App. 13,053.0 1,536.3 2,312.1 2,025.5 N
Operation and maintenance of local roads
Road operations and maintenance Local Roads App. 12,115.5 1,745.4 1,854.0 1,856.2 N
WDC Emergency Works Feb/Mar 2009 Construction - Com 141 45% - 57.2 - - N
New & improved infrastructure for local roads
MacDonald Road Pavement Smoothing 08/09 Construction - Com 324 55% 180.8 38.5 - - N
Minor improvements 2009/12 Local Roads App. 341 - 262.5 296.5 272.2 N
Improve, expand or replace network group Group allocation Alloc. 150.0 400.0 400.0
Quay St Bridge Construction - MMH Cat2 322 55% 271.0 11.0 138.1 - Probable R/N
Te Kooti Rd Bridge #194 Construction - MMM Cat2 322 55% 137.0 75.4 - - Possible R/N
Matahi Valley Rd Bridge #131 Construction - MMM Cat2 322 55% 166.0 8.8 82.5 - Possible R/N
Luttrells Rd Bridge #126 Construction - MMM Cat2 322 55% 140.0 - 7.7 69.3 Possible R/N
Wainui Rd Seal Widening 2010/11 Construction - MMM Cat2 324 55% 784.0 - 431.2 - Possible N
Wainui Rd Seal Widening 2011/12 Construction - MMM Cat2 324 55% 335.0 - - 184.3 Possible R/N
WDC Thornton Rd Bluberry Curves Realignment 2011/12 Investigation - MMM Cat2 324 55% 335.0 - - 184.3 Possible N
WDC Matahi Valley Rd Realignment 2009/10 Construction - MMM Cat2 324 55% 315.0 - 173.3 - Possible R/N
WDC Landing Rd RAB 2009/11 Design - MMM Cat2 324 55% 79.0 43.5 - - Possible R/N
WDC Landing Rd RAB 2009/11 Construction - MMM Cat2 324 55% 759.0 - 417.5 - Possible R/N
Thornton Rd Seal Widening 2011/12 Construction - MMM Cat2 324 55% 335.0 - - 184.3 Possible R/N
WDC Mill Rd to Phoenix Dr Link Construction - MMM Cat2 323 55% 200.0 - - 110.0 Possible R/N
User benefits improvements group Group allocation Alloc. - 300.0 200.0
Ruatahuna Seal Extension 2010/11 Construction - LMH Cat2 325 88% 326.0 - 285.3 - Probable T
Ruatahuna Seal Extension 2011/12 Construction - LMH Cat2 325 88% 336.0 - 17.5 276.5 Probable T
Ruatahuna Seal Extension 2012/13 Construction - LMH Cat2 325 88% 329.0 - - 17.5 Probable T
Demand management & community programmes
EBOP Road Safety Community Programmes Implementation App. 432 75% - 125.8 - - N
EBOP Road Safety TDM Community Programmes Implementation App. 432 75% - 75.1 - - N
Walking and cycling facilities
Walking and Cycling - Access and community benefits Group allocation Alloc. - - -
WDC Cycling Facilities (Minor Projects) 2009/10 Construction 102 LMM Reserve 452 55% 150.0 82.5 - - Res. A
WDC Cycling Facilities (Minor Projects) 2010/11 Construction 102 LMM Reserve 452 55% 155.0 - 85.3 - Res. A
WDC Cycling Facilities (Minor Projects) 2011/12 Construction 102 LMM Reserve 452 55% 160.0 - - 88.0 Res. A
WDC Cycling Facilities (Gorge Rd) 2009/10 Design 102 LMM Reserve 452 55% 150.0 82.5 - - Res. A
WDC Cycling Facilities (Gorge Rd) 2010/11 Construction 102 LMM Reserve 452 55% 1,094.0 - 601.7 - Res. A
WDC Cycling Facilities (Ohope Rd) 2009/10 Construction 102 LMM Reserve 452 55% 431.0 237.1 - - Res. A
WDC Pedestrian Facilities (Minor Projects) 2009/10 Construction 103 LMM Reserve 451 55% 198.0 108.9 - - Res. A
WDC Pedestrian Facilities (Minor Projects) 2010/11 Construction 103 LMM Reserve 451 55% 205.0 - 112.8 - Res. A
WDC Pedestrian Facilities (Minor Projects) 2011/12 Construction 103 LMM Reserve 451 55% 211.0 - - 116.1 Res. A
Transport planning
Whakatane Walking and Cycling Strategy Development 2008/09 Study - Com 002 75% 77.0 35.3 - - N
WDC AMP Improvements Study 80 ML_ Cat2 003 55% 50.0 - 27.5 - N
WDC Crash Reduction Study 2009/10 Study 65 MM_ Cat2 002 75% 50.0 37.5 - - N
WDC Matata to Nukuhou Arterial Improvement Strategy 2010/11 Study 66 MM_ Cat2 002 75% 50.0 - 37.5 - N
WDC Walking and Cycling Strategy Review Study - N/F
Whakatane District Council SPR
Renewal of local roads
Road renewals SPR App. 2,649.0 918.0 1,004.0 727.0 N
Operation and maintenance of local roads
Road operations and maintenance SPR App. 1,418.0 454.0 481.0 483.0 N
New & improved infrastructure for local roads
Minor improvements 2009/12 SPR App. 341 - 109.8 105.7 84.9 N