NZ Transport Agency logo

National Land Transport Programme 2009-2012

Waikato regional NLTP table

Return to Waikato regional tables page

Phase Regional priority Profile Status Work category Indicative FAR* Total phase cost 2009/10 NLTF ($000) 2010/11 NLTF ($000) 2011/12 NLTF ($000) Funding priority Funding source*
Environment Waikato
Public transport services
Bus & ferry concession fares Operations App. 513 50% 302.4 48.9 50.4 51.9 N
Bus services Operations App. 511 50% 36,935.2 6,155.9 6,155.9 6,155.9 N
Public transport facilities maintenance and operations Operations App. 514 60% 4,313.3 687.3 1,042.9 857.7 N
Public transport professional services/ administration Operations App. 50% 5,955.9 992.7 992.7 992.7 N
Total mobility flat payments Operations App. 521 100% 170.9 54.2 56.9 59.8 N
Total mobility operations Operations App. 517 50% 2,369.9 371.0 395.0 419.0 N
Wheelchair hoists Operations App. 519 60% 180.0 24.0 36.0 48.0 N
Demand management & community programmes
Community Programmes 2009/12 Implementation App. 432 75% - 660.0 - - N
Transport planning
Regional Rail Strategy Study - Com 002 50% 85.0 15.0 - - N
Regional Road Safety Strategy Study 1 Com 002 75% 135.0 48.8 - - N
Regional Stock Effluent Strategy Study 3 Com 002 75% 90.0 30.0 - - N
Waikato Regional Transportation Model Development (WRTM) Study - Com 002 50% 506.3 37.7 - - N
Regional land transport planning management Implementation App. 001 100% 1,475.7 507.4 484.4 483.9
Regional Freight and Aggregate Strategy Study 25 HM_ Cat2 002 75% 325.0 56.3 75.0 - N
Regional Passenger Transport Studies Study 1 HM_ Cat2 003 75% 180.0 22.5 22.5 - N
Regional Public Transport Plan Study 26 HH_ Cat2 003 60% 600.0 48.0 96.0 - N
Regional Rail Strategy Study 27 MM_ Cat2 002 75% 385.0 138.8 - - N
Regional Road Safety Strategy Study 2 MM_ Cat2 002 75% 235.0 26.3 - - N
Regional Strategic Options Assessment Study 23 HH_ Cat2 002 75% 400.0 150.0 - - N
Regional Transport Benchmark and Futures Study Study 24 HH_ Cat2 002 75% 540.0 180.0 - - N
Transport Funding Policy Study Study 34 MM_ Cat2 002 75% 120.0 45.0 45.0 - N
Travel Demand Management Strategy Study 28 MM_ Cat2 002 75% 370.0 127.5 - - N
Supergold card
Supergold trip adminstration Implementation App. 60.0 20.0 20.0 20.0
Supergold trip payments Implementation App. 1,600.0 500.0 550.0 550.0
Hamilton City Council
Renewal of local roads
Road renewals Local Roads App. 16,627.7 2,390.0 2,492.2 2,600.4 N
Operation and maintenance of local roads
Road operations and maintenance Local Roads App. 18,410.1 2,713.9 2,748.1 2,842.6 N
New & improved infrastructure for local roads
Mill Street Intersection Upgrades Construction - Com 321 55% 565.0 282.5 - - N
Old Wairere Drive - Pukete to Resolution 4 laning Design - Com 323 55% 1,950.0 247.5 - - N
Wairere Drive (Crosby to Cobham) Design 2 Com 323 55% 2,920.0 616.0 632.5 - R
Minor improvements 2009/12 Local Roads App. 341 - 408.3 373.0 381.7 N
Wairere Drive (Pukete to Resolution) 4 Laning Construction 1 MMH Cat2 323 55% 27,796.8 - 4,923.3 5,080.9 Probable N
Peachgrove, Hukanui intersection upgrades and improvements Construction - MMM Cat2 324 55% 5,247.8 - - 308.1 Possible N
Peachgrove, Hukanui intersection upgrades and improvements Design - MMM Cat2 324 55% 424.4 - - 233.4 Possible N
Peachgrove, Hukanui intersection upgrades and improvements Investigation - MMM Cat2 321 55% 103.0 - 56.7 - Possible N
Wairere Drive (Crosby to Cobham) Construction 2 MMM Cat2 323 55% 64,716.0 - 12,259.5 3,850.6 Possible N
Improve, expand or replace network group Group allocation Alloc. 160.0 275.0 275.0
Grandview Road Avalon Drive Intersection Construction - MMM Cat2 321 55% 361.2 - 198.7 - Possible N
Grey Street Intersections Claudelands Construction - MMM Cat2 321 55% 657.5 82.5 279.1 - Possible N
Safety improvements Construction - MMM Cat2 321 55% 410.0 82.5 71.5 71.5 Possible N
O'Neill Street Revitalisation Construction - MMM Cat2 321 55% 1,500.0 825.0 - - Possible N
Southern Links Designation Investigation - N/F
Public transport infrastructure
Urban transport choice, network improvements & safety PT group Group allocation Alloc. 165.0 165.0 165.0
PT Bus priority measures Construction 1 MMM Cat2 531 60% 153.7 30.0 30.9 31.3 Possible N
Hamilton Transport Centre Capacity Improvements Construction 1 MMM Cat2 531 60% 284.9 42.0 97.4 31.5 Possible N
Hamilton Transport Centre precinct improvements Construction 1 MMM Cat2 531 60% 597.5 54.0 304.5 - Possible N
Public transport superstop Construction 1 MMM Cat2 531 60% 354.5 30.0 182.7 - Possible N
Hamilton to Auckland passenger rail facilities Construction N/F
Demand management & community programmes
Community Focussed Activities 2009-2012 Implementation App. 432 75% - 501.0 - - N
Walking and cycling facilities
Cycling 2008/09 - Hamilton on-road cycle network construction Construction - Com 452 55% 1,714.0 777.7 - - N
Walking and Cycling - Key safety and congestion Group allocation Alloc. 183.3 183.3 183.3
Claudelands Bridge clip on Construction 3 MMM Cat2 452 55% 2,500.0 85.3 60.5 1,229.3 Possible N
Walking and Cycling - Access and community benefits Group allocation Alloc. - - -
2009/10 Cycle Network programme Construction 3 LMM Reserve 452 55% 2,093.1 1,151.2 - - Res. A
2010/11 Cycle Network programme Construction 3 LMM Reserve 452 55% 1,308.3 - 719.6 - Res. A
2011/12 Cycle Network programme Construction 3 LMM Reserve 452 55% 2,425.6 - - 1,334.1 Res. A
Transport planning
Access Hamilton Study Review Study - Com 002 75% 406.0 154.5 - - N
AMP Review Study 43 MM_ Cat2 003 55% 600.0 27.5 55.0 - N
Annual Accident Investigation Study 2009-2012 Study 35 MM_ Cat2 002 75% 86.9 21.3 21.6 22.2 N
Cycling - Hamilton CBD cycle network study Study 4 MM_ Cat2 002 75% 50.0 37.5 - - N
Safety Management System update 2009-2012 Study 5 MM_ Cat2 003 55% 60.0 27.5 - 5.5 N
Hauraki District Council
Renewal of local roads
Road renewals Local Roads App. 7,703.0 1,447.2 1,327.9 1,384.6 N
Operation and maintenance of local roads
Road operations and maintenance Local Roads App. 9,145.0 1,606.5 1,641.6 1,690.2 N
Effect of Drought in Jan - April 2008 Construction - Com 141 87% - 3,167.7 - - N
New & improved infrastructure for local roads
Minor improvements 2009/12 Local Roads App. 341 - 244.3 211.4 215.6 N
User benefits improvements group Group allocation Alloc. - - -
Komata Reefs Road Seal Extension (Stage II) Construction - LMH Reserve 325 64% 46.9 - - 30.0 Res. A
Dickey Flat Road Seal Extension Construction - LMH Reserve 325 64% 22.3 - - 14.3 Res. A
Tramline Road Seal Extension Construction - LMH Reserve 325 64% 61.5 - - 39.4 Res. A
Mangawhero Road Seal Extension Construction - LMH Reserve 325 64% 31.3 - - 20.0 Res. A
Walking and cycling facilities
Walking and Cycling - Access and community benefits Group allocation Alloc. - - -
Cycle Facilities 2009/2010 Construction 4 LMM Reserve 452 64% 2.0 1.3 - - Res. A
Cycle Facilities 2010/2011 Construction 4 LMM Reserve 452 64% 11.0 - 7.0 - Res. A
Cycle Facilities 2011/2012 Construction 4 LMM Reserve 452 64% 4.0 - - 2.6 Res. A
Pedestrian Facilities 2009/2010 Construction 5 LMM Reserve 451 64% 89.0 57.0 - - Res. A
Pedestrian Facilities 2010/2011 Construction 5 LMM Reserve 451 64% 73.0 - 46.7 - Res. A
Pedestrian Facilities 2011/2012 Construction 5 LMM Reserve 451 64% 90.0 - - 57.6 Res. A
Transport planning
Activity Management Plans 2009 - 2011 Study 6 MM_ Cat2 003 64% 76.0 9.0 23.0 16.6 N
Studies and Strategies 2009 - 2011 Study 7 MM_ Cat2 002 75% 34.0 4.5 16.5 4.5 N
Matamata-Piako District Council
Renewal of local roads
Road renewals Local Roads App. 15,649.4 2,448.3 2,550.7 2,512.8 N
Operation and maintenance of local roads
Road operations and maintenance Local Roads App. 14,464.2 2,372.5 2,317.2 2,329.5 N
New & improved infrastructure for local roads
Minor improvements 2009/12 Local Roads App. 341 - 385.7 346.5 339.6 N
Transport planning
Roading Activity Plan Study 36 MM_ Cat2 003 58% 390.0 17.4 17.4 34.8 N
Otorohanga District Council
Renewal of local roads
Road renewals Local Roads App. 7,251.9 1,208.9 1,303.5 1,331.1 N
Operation and maintenance of local roads
Road operations and maintenance Local Roads App. 7,613.6 1,326.7 1,349.3 1,363.8 N
New & improved infrastructure for local roads
Minor improvements 2009/12 Local Roads App. 341 - 202.8 188.8 189.0 N
Improve, expand or replace network group Group allocation Alloc. 10.0 10.0 -
ODC advance property purchase 2009/10 Property - MMM Cat2 333 63% 32.0 9.9 10.3 - Possible N
Walking and cycling facilities
Walking and Cycling - Access and community benefits Group allocation Alloc. - - -
Otorohanga pedestrian facilities 2009/10 Construction 6 LMM Reserve 451 63% 36.6 23.1 - - Res. A
Otorohanga pedestrian facilities 2010/11 Construction 6 LMM Reserve 451 63% 38.0 - 24.0 - Res. A
Otorohanga Pedestrian facilities 2011/12 Construction 6 LMM Reserve 451 63% 39.1 - - 24.6 Res. A
Transport planning
Otorohanga District Roading AMP 2009/12 Study 8 MM_ Cat2 003 63% 108.5 - - 21.1 N
Otorohanga District Council W & C strategy 2009/12 Study - N/F
South Waikato District Council
Renewal of local roads
Road renewals Local Roads App. 7,238.9 1,177.5 1,182.9 1,186.7 N
Operation and maintenance of local roads
Road operations and maintenance Local Roads App. 6,647.4 1,082.6 1,096.6 1,104.8 N
New & improved infrastructure for local roads
Minor improvements 2009/12 Local Roads App. 341 - 180.8 162.3 160.7 N
User benefits improvements group Group allocation Alloc. 100.0 100.0 100.0
Demand management & community programmes
South Waikato District Council Community Programmes Implementation App. 432 75% - 50.8 - - N
Taupo District Council
Renewal of local roads
Road renewals Local Roads App. 4,818.5 725.8 654.6 691.5 N
Operation and maintenance of local roads
Road operations and maintenance Local Roads App. 8,216.4 1,121.0 1,159.1 1,253.0 N
New & improved infrastructure for local roads
East Taupo Arterial Construction - Com 323 77% 98,223.0 26,775.0 20,060.6 - R
Waikato Regional Transportation Model Development (WRTM) Study - Com 311 53% 45.0 1.8 - - N
Minor improvements 2009/12 Local Roads App. 341 - 147.7 129.1 136.4 N
Improve, expand or replace network group Group allocation Alloc. 175.0 250.0 250.0
Tauhara/Spa Rd intersection improvement Design - MMH Cat2 324 53% 75.0 39.8 - - Probable N
Tauhara/Spa Rd intersection improvement Construction - MMH Cat2 324 53% 1,119.0 265.0 328.1 - Probable N
Tongariro St traffic calming Investigation - MMM Cat2 325 53% 2,403.0 - 3.7 15.9 Possible N
Arrowsmith/Kiddle Drive intersection Investigation - MMM Cat2 324 53% 53.0 1.6 26.5 - Possible N
Priority changes Investigation - MMM Cat2 324 53% 106.0 3.2 - 53.0 Possible N
Mere Rd/Taharepa/Lake Tce intersection Investigation - MMM Cat2 324 53% 214.5 - 1.6 6.1 Possible N
Miro St/Tauhara Investigation - MMM Cat2 324 53% 107.5 - 0.8 3.2 Possible N
Spa Rd 4 laning Investigation - MMM Cat2 324 53% 148.0 - 15.4 63.1 Possible N
Lake Tce traffic calming & realignment Investigation - MMM Cat2 324 53% 2,477.0 - 11.7 47.2 Possible N
Poihipi Road widening Design - MMM Cat2 324 53% 69.0 - - 17.0 Possible N
Public transport infrastructure
General access & community benefits PT group Group allocation Alloc. 6.2 6.2 6.2
Public transport infrastructure Construction 2 LMM Reserve 531 60% 168.0 18.0 - 19.2 Res. A
Demand management & community programmes
Community Focused Activities Implementation App. 432 75% - 131.3 - - N
Walking and cycling facilities
Walking and Cycling - Access and community benefits Group allocation Alloc. - - -
SH5 footpath Design 7 LMM Reserve 451 53% 475.1 159.0 92.8 - Res. A
Pedestrian footpath network Construction 7 LMM Reserve 451 53% 100.0 53.0 - - Res. A
Cycle facilities Construction 7 LMM Reserve 452 53% 18.0 9.5 - - Res. A
Pedestrian Bridge - Nukuhau to Riverside park Design 12 LML Reserve 451 53% 274.0 145.2 - - Res. A
Pedestrian Bridge - Nukuhau to Riverside park Construction 13 LML Reserve 451 53% 1,131.0 - 599.4 - Res. A
Transport planning
Crash Reduction Studies Study 39 MM_ Cat2 002 75% 60.0 - 22.5 - N
Transport Strategy Study 40 MH_ Cat2 002 75% 50.0 - 37.5 - N
Transportation AMP review Study 9 MM_ Cat2 003 53% 50.0 - 26.5 - N
Walking and Cycling review Study 10 LM_ Cat2 002 75% 60.0 - 15.0 - N
Taupo District Council SPR
Renewal of local roads
Road renewals SPR App. 19.0 - 19.0 - N
Operation and maintenance of local roads
Road operations and maintenance SPR App. 24.6 12.0 6.2 6.4 N
New & improved infrastructure for local roads
Minor improvements 2009/12 SPR App. 341 - 1.0 1.8 0.4 N
Thames-Coromandel District Council
Renewal of local roads
Road renewals Local Roads App. 19,901.0 2,741.3 2,893.9 2,922.3 N
Operation and maintenance of local roads
Road operations and maintenance Local Roads App. 12,698.0 1,787.5 1,821.1 1,851.6 N
E/W Minor Events 2008/2009 Construction - Com 141 43% - 123.0 - - N
New & improved infrastructure for local roads
Minor improvements 2009/12 Local Roads App. 341 - 362.3 335.6 334.8 N
Improve, expand or replace network group Group allocation Alloc. 15.0 - -
Barrowcats Bridge Design - MMM Cat2 322 53% 25.0 13.3 - - Possible N
Demand management & community programmes
East Waikato Cluster - Community Programme 2009/12 Implementation App. 432 75% - 148.8 - - N
Walking and cycling facilities
Walking and Cycling - Access and community benefits Group allocation Alloc. - - -
Transport planning
Activity Managment Plan 2009 - 2012 Study 11 ML_ Cat2 003 53% 70.0 7.4 19.1 10.6 N
Studies and Strategies 2009-2011 Study 12 MM_ Cat2 002 75% 18.0 4.5 4.5 4.5 N
Waikato District Council
Renewal of local roads
Road renewals Local Roads App. 41,550.9 7,382.0 6,814.3 7,410.2 N
Ohautira Road preventative maintenance 2007/08 Construction - Com 241 52% 350.0 33.8 - -
Operation and maintenance of local roads
Road operations and maintenance Local Roads App. 18,444.9 3,213.5 3,231.0 3,236.6 N
E/W Minor Events 2008/10 Construction - Com 141 54% - 499.5 - - N
New & improved infrastructure for local roads
Waikato Regional Transportation Model Development (WRTM) Study - Com 311 62% 112.5 10.4 - - N
Minor improvements 2009/12 Local Roads App. 341 - 847.6 715.0 746.6 N
Demand management & community programmes
Community Programmes 2009/2012 Implementation App. 432 75% - 124.7 - - N
Walking and cycling facilities
Pedestrian Facilites 2008/09 - District Wide Construction - Com 451 62% 410.5 39.0 - - N
Walking and Cycling - Access and community benefits Group allocation Alloc. - - -
Pedestrian Facilities 2009/12 - District Wide Construction 9 LMM Reserve 451 62% 793.0 179.7 177.5 134.5 Res. A
Transport planning
AMP Development Study 13 LL_ Cat2 003 62% 300.0 31.0 62.0 93.0 N
Crash Reduction Study 2010/11 Study 41 MM_ Cat2 002 75% 5.0 - 3.8 - N
Network Strategy Development Study 14 MH_ Cat2 002 75% 1,428.4 141.4 123.7 110.0 N
Walking and Cycling Strategy development 2010/11 Study - N/F
Waikato Highway & Network Operations
Renewal of state highways
Road renewals State Highways App. 92,462.3 33,902.8 29,279.7 29,279.7 N
Preventive Maintenance 9/12 Construction - Cat2 241 100% 6,936.0 2,694.5 2,096.9 2,144.6
Scour Investigation 9/12 Construction 12 Cat2 241 100% 671.0 217.0 224.0 230.0
Operation and maintenance of state highways
Road operations and maintenance State Highways App. 99,918.5 33,291.5 33,313.5 33,313.5 N
EW (08/013/3) Tongaporutu Underslip Aug 08 Construction - Com 141 100% - 350.0 - - N
EW (08/027/3) SH23 Gully Slip Aug 08 Construction - Com 141 100% - 136.0 - - N
EW (08/029/3) EW Storm Event 26 Jul & 3 Aug 08 Construction - Com 141 100% - 1,800.0 - - N
EW SH 3 Okau Slip 09/004/3 Construction - Com 141 100% - 310.0 - - N
New & improved infrastructure for State highways
Atiamuri Bridge Replacement (SH1) Design - Com 322 100% 601.0 - 601.0 - N
Atiamuri Bridge Replacement (SH1) Investigation - Com 322 100% 574.0 330.3 243.7 - N
Avalon Drive Bypass Construction - Com 323 100% 35,553.2 400.0 - - N
Cambridge Bypass (2L) (SH1N) Design - Com 323 100% 2,880.1 1,047.1 1,433.7 399.3 R
Cambridge Bypass (2L) (SH1N) Property - Com 331 100% 37,897.5 17,880.4 13,582.7 6,434.4 R & N
Church to Avalon Drive Dr 4L Construction - Com 324 100% 4,862.0 86.0 - - N
East Taupo Arterial Design - Com 324 100% 300.0 40.0 - - R
Hamilton Bypass (SH01N) Investigation - Com 324 100% 13,100.0 2,620.0 2,620.0 2,620.0 N
Hamilton Bypass (SH01N) Property - Com 331 100% 77,563.3 4,754.0 30,132.0 32,042.4 R & N
Huntly Bypass (SH01N) Investigation - Com 323 100% 10,700.0 2,140.0 2,140.0 2,140.0 R
Huntly Bypass (SH01N) Property - Com 331 100% 15,036.8 2,508.8 5,817.1 5,534.8 R & N
Kopu Bridge Replacement (SH25) Construction - Com 322 100% 57,700.0 15,015.8 23,004.8 15,002.0 N
Kopu Bridge Replacement (SH25) Design - Com 322 100% 300.0 300.0 - - N
Long Swamp to Rangiriri 4L Design - Com 324 100% 2,864.3 - 210.7 1,640.4 R
Long Swamp to Rangiriri 4L Property - Com 331 100% 1,318.4 258.9 1,059.4 - R & N
Mangatawhiri Township Deviat'n Construction - Com 324 100% 47,576.0 4,890.4 - - N
Maramarua Deviation (SH2) Design - Com 324 100% 2,870.0 1,801.5 1,068.5 - C
Maramarua Deviation (SH2) Property - Com 331 100% 4,599.0 4,599.0 - - C & N
Mercer to Long Swamp Construction - Com 324 100% 44,801.4 134.3 - - N
Ngaruawahia Bypass (SH01N) Design - Com 323 100% 4,817.5 3,020.0 1,797.5 - R
Ngaruawahia Bypass (SH01N) Property - Com 331 100% 11,156.6 4,309.4 6,847.2 - R & N
Piarere - Oak Tree Bend Realign Construction - Com 324 100% 11,225.0 3,052.1 818.9 - R
Piarere - Oak Tree Bend Realign Property Com 324 100% 200.0 200.0 - - N
Rangiriri Four Laning (SH1) Design - Com 324 100% 2,103.8 1,500.8 603.0 - N
Rangiriri Four Laning (SH1) Property - Com 331 100% 257.5 257.5 - - N
Rangiriri to South of Ohinewai Construction - Com 324 100% 1,222.2 300.0 - - N
Te Rapa Bypass (SH01N) Design - Com 323 100% 4,500.0 2,200.6 1,799.7 499.7 N
Te Rapa Bypass (SH01N) Investigation - Com 323 100% 2,663.4 100.0 - - N
Te Rapa Bypass (SH01N) Property - Com 331 100% 20,327.1 20,327.1 - - N
4th Branch SVB Investigation Com 100% 65.0 9.6 - - N
Campbell Rd Northbd & Southbd PL Ext Construction Com 100% 836.3 28.6 - - N
Frenchmans Gap SVB Investigation Com 100% 65.0 6.0 - - N
Gallagher IS Investigation Com 100% 175.0 12.4 - - R
Greenwood/Killarney IS Construction Com 100% 3,800.0 1,300.0 560.0 - R
Hamilton City Busbays Construction Com 100% 916.2 283.8 - - N
Hatu Patu PL Construction Com 100% 618.0 618.0 - - N
Hillcrest & Morrinsville Rd IS Investigation Com 100% 151.3 20.0 - - N
Kirikiri Valley PL Investigation Com 100% 50.0 41.5 - - N
Lichfield South PL Construction Com 100% 840.0 162.0 - - N
Maramarua Expressway SI Construction Com 100% 3,293.1 464.5 - - N
Ohaupo/Kahikatea IS Construction Com 100% 4,200.0 3,400.0 500.0 - N
One Ton West PL Construction Com 100% 844.2 135.0 - - N
Piarere Junction Safety Improvement Investigation Com 100% 134.7 30.0 - - R
Piranui Saddle Short PL Construction Com 100% 620.0 37.8 - - N
Safety Improvements: Hamilton North (SH1) Construction Com 100% 3,600.0 2,500.0 1,100.0 - N
Safety Improvements: Hamilton North (SH1) Design Com 100% 30.0 30.0 - - N
SH26/27 Intersection Improvements Design Com 100% 190.4 39.5 - - R
Shakespeare Street IS Investigation Com 100% 45.3 9.6 - - N
SWATT 2010 Stage2: Tokoroa to Taupo Construction Com 100% 2,525.0 100.0 - - N
Tahuna Road Roundabout Construction Com 100% 3,621.0 2,401.0 1,000.0 - N
Tahuna Road Roundabout Design Com 100% 150.0 15.2 - - N
Tararu Stream Bridge Replacement Construction Com 100% 5,098.0 750.3 - - N
Te Puru Stream Bridge Replacement Construction Com 100% 4,688.9 3,000.0 986.0 - N
Tutukau Rd North PL Construction Com 100% 700.0 100.0 - - N
Victoria to Queen Street IS Design Com 100% 128.6 46.9 - - N
Minor improvements 2009/12 State Highways App. 341 - 4,340.0 4,292.3 4,292.3 N
Atiamuri Bridge Replacement (SH1) Property 4 HMH App. 331 100% 460.0 - 460.0 - Probable N
Tamahere to Cambridge 4L Property 30 HHL App. 331 100% 6,558.0 - 2,122.6 2,192.3 Probable N
Atiamuri Bridge Replacement (SH1) Construction 5 HMH Cat2 322 100% 21,722.5 - - 7,864.0 Probable N
Kirikiri Stream Bridge Replacement (SH26) Construction 8 MMH Cat2 322 100% 7,688.8 - 852.8 4,595.2 Probable N
Kirikiri Stream Bridge Replacement (SH26) Design 6 MMH Cat2 322 100% 501.2 268.1 233.1 - Probable N
Kirikiri Stream Bridge Replacement (SH26) Property 7 MMH Cat2 331 100% 1,099.8 824.4 275.5 - Probable N
Hamilton Southern Links (SH1 & 3) Investigation 18 HHL Cat2 323 100% 3,189.6 617.0 1,699.0 873.6 Probable N
Ngaruawahia Bypass (SH01N) Construction 22 HHL Cat2 323 100% 161,200.7 - 6,097.4 37,538.0 Probable C/N
Rangiriri Four Laning (SH1) Construction 14 HHL Cat2 323 100% 46,659.8 - 1,210.1 15,045.6 Probable N
Tamahere to Cambridge 4L Design 29 HHL Cat2 324 100% 3,200.0 - 500.6 1,503.6 Probable N
Te Rapa Bypass (SH01N) Construction 16 HHL Cat2 323 100% 150,268.5 - 16,308.6 50,811.3 Probable N
East Taupo Arterial Construction MMM Cat2 324 100% 120.0 60.1 59.9 - Probable N
Strategic network group Group allocation Alloc. 2,687.5 2,956.3 2,956.3
Matarawa Bridge Widening (SH1) Design 9 HMH Cat2 322 100% 21.0 21.0 - - Probable N
Piarere Junction Safety Improvement (SH1N) Design 9 HMH Cat2 324 100% 109.0 72.0 37.0 - Probable N
Piarere Junction Safety Improvement (SH1N) Construction 9 HMH Cat2 324 100% 4,495.0 - - 1,645.0 Probable N
Tirau SH1/5 Realignment Investigation 9 HMH Cat2 324 100% 128.0 128.0 - - Probable N
Tirau SH1/5 Realignment Design 9 HMH Cat2 324 100% 150.0 - 74.0 76.0 Probable N
Tirau SH1/5 Realignment Construction 9 HMH Cat2 324 100% 4.6 - - 1.5 Probable N
Gallagher IS Design 10 HMM Cat2 324 100% 120.0 80.0 40.0 - Probable N
Hillcrest & Morrinsville Rd IS (SH1) Investigation 10 HMM Cat2 324 100% 20.0 20.0 - - Probable N
Hillcrest & Morrinsville Rd IS (SH1) Construction 10 HMM Cat2 324 100% 3,607.0 1,167.0 1,202.0 1,238.0 Probable N
Kaimais to Piarere SI SH29 NSC Investigation 9 HMM Cat2 324 100% 155.0 155.0 - - Probable N
Kaimais to Piarere SI SH29 NSC Design 9 HMM Cat2 324 100% 74.0 - 74.0 - Probable N
Safety Improvements: Hamilton Urban Design 9 HMM Cat2 324 100% 108.0 - 53.0 55.0 Probable N
Improve, expand or replace network group Group allocation Alloc. 7,781.3 8,559.4 8,559.4
Bader St Intersection (SH3) Investigation 10 MMH Cat2 324 100% 124.0 124.0 - - Probable N
Bader St Intersection (SH3) Design 10 MMH Cat2 324 100% 127.0 - 127.0 - Probable N
Electronic Warning Signs Construction 12 MMH Cat2 321 100% 818.0 218.0 300.0 300.0 Probable N
Five Mile Bay PL (SH1N) Investigation 9 MMH Cat2 324 100% 44.0 - - 44.0 Probable N
Galaxy Rd Southbd PL (SH5) Investigation 9 MMH Cat2 324 100% 41.0 - - 41.0 Probable N
Hetherington Rd Southbd PL (SH5) Investigation 9 MMH Cat2 324 100% 41.0 - - 41.0 Probable N
Kiwi Road Realignment (SH39) Design 9 MMH Cat2 324 100% 103.0 103.0 - - Probable N
Kiwi Road Realignment (SH39) Construction 9 MMH Cat2 324 100% 3,040.0 - - 987.0 Probable N
Kuatatahi Stream Northbd PL Design 9 MMH Cat2 324 100% 33.0 - - 33.0 Probable N
Kuatatahi Stream Northbd PL (SH5) Investigation 9 MMH Cat2 324 100% 32.0 - 32.0 - Probable N
Laxon Rd Realignment (SH39) Investigation 10 MMH Cat2 324 100% 15.0 15.0 - - Probable N
Laxon Rd Realignment (SH39) Design 10 MMH Cat2 324 100% 32.0 - 32.0 - Probable N
Limmer Rd Realignment (SH39) Investigation 9 MMH Cat2 324 100% 26.0 26.0 - - Probable N
Limmer Rd Realignment (SH39) Design 9 MMH Cat2 324 100% 47.0 - 47.0 - Probable N
Motuoapa Southbd PL (SH1N) Investigation 9 MMH Cat2 324 100% 31.0 31.0 - - Probable N
Motuoapa Southbd PL (SH1N) Design 9 MMH Cat2 324 100% 32.0 - 32.0 - Probable N
Ngahinapouri Southbd PL (SH39) Investigation 9 MMH Cat2 324 100% 62.0 62.0 - - Probable N
Ngahinapouri Southbd PL (SH39) Design 9 MMH Cat2 323 100% 53.0 - 53.0 - Probable N
Pats Corner Realignment (SH1) Investigation 9 MMH Cat2 324 100% 53.0 - 53.0 - Probable N
Pats Corner Realignment (SH1) Design 9 MMH Cat2 324 100% 44.0 - - 44.0 Probable N
Pat's Corner SVB PL Investigation 9 MMH Cat2 324 100% 31.0 31.0 - - Probable N
Pat's Corner SVB PL (SH1N) Design 9 MMH Cat2 324 100% 32.0 - 32.0 - Probable N
Putaruru SEDF Design 11 MMH Cat2 321 100% 70.0 70.0 - - Probable N
Putaruru SEDF Construction 11 MMH Cat2 321 100% 206.0 - 103.0 103.0 Probable N
Rangipo SVB PL (SH1N) Investigation 9 MMH Cat2 324 100% 31.0 31.0 - - Probable N
Rangipo SVB PL (SH1N) Design 9 MMH Cat2 324 100% 32.0 - 32.0 - Probable N
Rangitaiki Northbd PL (SH5) Investigation 9 MMH Cat2 324 100% 42.0 - 42.0 - Probable N
Rangitaiki Northbd PL (SH5) Design 9 MMH Cat2 324 100% 44.0 - - 44.0 Probable N
Rangitaiki Southbd PL Investigation 9 MMH Cat2 324 100% 33.0 - - 33.0 Probable N
Rotopua PL (SH1N) Investigation 9 MMH Cat2 324 100% 42.0 - 42.0 - Probable N
Rotopua PL (SH1N) Design 9 MMH Cat2 324 100% 44.0 - - 44.0 Probable N
Seismic Retrofit 9/12 Construction 10 MMH Cat2 324 100% 2,063.0 48.0 265.0 1,750.0 Probable N
South of Te Kumi Road SI (SH3) Construction 9 MMH Cat2 324 100% 1,569.0 774.0 795.0 - Probable N
Tahuna Road Roundabout (SH27) Construction 9 MMH Cat2 324 100% 4,356.0 - 1,593.0 1,643.0 Probable N
Tarpot Curve Realignment (SH5) Investigation 9 MMH Cat2 324 100% 113.0 113.0 - - Probable N
Tarpot Curve Realignment (SH5) Design 9 MMH Cat2 324 100% 129.0 - 64.0 65.0 Probable N
Te Kuiti SEDF (SH3) Design 12 MMH Cat2 321 100% 72.0 72.0 - - Probable N
Te Kuiti SEDF (SH3) Construction 12 MMH Cat2 321 100% 412.0 412.0 - - Probable N
Victoria to Queen Street IS (SH1N) Design 10 MMH Cat2 324 100% 29.4 29.4 - - Probable N
Waimata Realignment (SH2) Design 9 MMH Cat2 324 100% 113.0 113.0 - - Probable N
Waiomu Stream Bridge Flood Protection (SH25) Investigation 11 MMH Cat2 322 100% 146.0 82.0 64.0 - Probable N
Waiomu Stream Bridge Flood Protection (SH25) Design 11 MMH Cat2 322 100% 200.0 - - 99.0 Probable N
Waipakihi Rd Southbd PL (SH1N) Investigation 9 MMH Cat2 324 100% 42.0 - 42.0 - Probable N
Waipakihi Rd Southbd PL (SH1N) Design 9 MMH Cat2 324 100% 44.0 - - 44.0 Probable N
Whatawhata Weigh Station SH39 Investigation 12 MMH Cat2 321 100% 31.0 31.0 - - Probable N
Whatawhata Weigh Station SH39 Design 12 MMH Cat2 321 100% 32.0 - 32.0 - Probable N
4th Branch SVB (SH25a) Design 9 MMM Cat2 324 100% 52.0 52.0 - - Probable N
Airport Road (SH21)/SH3 IS Investigation 10 MMM Cat2 324 100% 87.0 - - 87.0 Probable N
Frenchmans Gap SVB (SH25a) Design 10 MMM Cat2 324 100% 62.0 62.0 - - Probable N
Frenchmans Gap SVB (SH25a) Construction 10 MMM Cat2 331 100% 710.0 - - 351.0 Probable N
Improved Driver Information 9/12 Construction 12 MMM Cat2 321 100% 1,838.4 594.8 612.6 631.0 Probable N
Kirikiri Valley PL (SH25a) Design 10 MMM Cat2 324 100% 52.0 52.0 - - Probable N
Kirikiri Valley PL (SH25a) Construction 10 MMM Cat2 324 100% 374.0 - 265.0 109.0 Probable N
Mangatarata Double PLs (SH2) Investigation 10 MMM Cat2 324 100% 93.0 93.0 - - Probable N
Mangatarata Double PLs (SH2) Design 10 MMM Cat2 324 100% 108.0 - 53.0 55.0 Probable N
Maramarua Golf Course Eastbd PL (SH2) Design 10 MMM Cat2 324 100% 41.0 41.0 - - Probable N
Maramarua Golf Course Eastbd PL (SH2) Construction 10 MMM Cat2 324 100% 1,882.0 928.0 954.0 - Probable N
McFalls Quarry PL (SH3) Design 10 MMM Cat2 324 100% 41.0 41.0 - - Probable N
Pavement Smoothing 9/12 Construction 10 MMM Cat2 324 100% 384.0 142.0 128.0 114.0 Probable N
Property Acquisitions 9/12 Property 10 MMM Cat2 331 100% 1,912.1 618.6 637.2 656.3 Probable N
Safety Improvements : SH3 Hamilton to Airport Rd Design 10 MMM Cat2 324 100% 52.0 52.0 - - Probable N
Safety Improvements : SH39 Design 9 MMM Cat2 324 100% 41.0 41.0 - - Probable N
Safety Improvements : SH39 Construction 9 MMM Cat2 324 100% 4,357.0 - 1,580.0 1,651.0 Probable N
Safety Retrofit 9/12 Construction 9 MMM Cat2 324 100% 3,379.1 2,230.5 1,148.7 - Probable N
SH26/27 Intersection Improvements Construction 9 MMM Cat2 324 100% 4,363.0 1,134.0 1,593.0 1,636.0 Probable N
Strategic Plan Initiatives 9/12 Construction 12 MMM Cat2 324 100% 2,730.9 1,784.4 946.5 - Probable N
Rangipo Northbd PL (SH1N) Construction 10 MML Cat2 324 100% 861.0 - 425.0 436.0 Possible N
Waitomo Road/SH3 Intersection SI Design 9 MML Cat2 324 100% 32.0 32.0 - - Possible N
Cambridge Bypass (2L) (SH1N) Construction 24 Reserve 167,882.5 Res. B
Hamilton Southern Links (SH1 & 3) Design Reserve 2,668.4 Res. B
Hamilton Southern Links (SH1 & 3) Property Reserve 26,054.0 Res. B
Maramarua Deviation (SH2) Construction 20 Reserve 79,017.0 Res. B
Tamahere to Cambridge 4L Construction Reserve 77,612.0 Res. B
Public transport infrastructure
Hamilton City Busbays Construction - N/F
Demand management & community programmes
Community Advertising 9/12 - Waikato Implementation App. 432 100% - 74.8 - - N
Walking and cycling facilities
Cobham Drive Pedestrian Facility Investigation - Com 451 100% 55.0 10.0 - - N
Kahikatea Drive/Greenwood St Walking & Cycling Facilities Investigation 14 Com 452 100% 55.0 40.0 - - N
Massey Street Cycle Lane Construction - Com 452 100% 600.0 600.0 - - N
Massey Street Cycle Lane Design - Com 452 100% 66.3 8.0 - - N
Ohaupo Rd W&C (Lorne to Dixon) Investigation 27 Com 452 100% 40.0 20.0 - - N
Walking and Cycling - Key safety and congestion Group allocation Alloc. 744.8 744.8 744.8
Ohaupo Rd W&C (Lorne to Dixon) Design 28 MMH Cat2 452 100% 28.0 16.0 12.0 - Probable N
Ohaupo Rd W&C (Lorne to Dixon) Construction 29 MMH Cat2 452 100% 667.0 - - 667.0 Probable N
Karapiro Stream Bridge Widening Construction 19 MMM Cat2 451 100% 823.0 823.0 - - Possible N
Cobham Drive Pedestrian Facility Design 22 MMM Cat2 451 100% 65.0 65.0 - - Possible N
Cobham Drive Pedestrian Facility Construction 23 MMM Cat2 451 100% 1,300.0 - 1,300.0 - Possible N
Mangapiko Bridge Footpath Widening Design 17 MMM Cat2 451 100% 60.0 60.0 - - Probable N
Mangapiko Bridge Footpath Widening Construction 18 MMM Cat2 451 100% 210.0 - 210.0 - Probable N
Kahikatea Drive/Greenwood St Walking & Cycling Facilities Design 15 MMM Cat2 452 100% 45.0 30.0 15.0 - Possible N
Kahikatea Drive/Greenwood St Walking & Cycling Facilities Construction 16 MMM Cat2 452 100% 1,300.0 - 1,300.0 - Possible N
Lorne St to Cobham Dr W&C Investigation 24 MMM Cat2 452 100% 30.0 14.0 16.0 - Possible N
Lorne St to Cobham Dr W&C Design 25 MMM Cat2 452 100% 28.0 - - 28.0 Possible N
Walking and Cycling - Access and community benefits Group allocation Alloc. - - -
Avalon Drive Cycleway Construction 20 LMH Reserve 452 100% 300.0 - 300.0 - Res. A
Avalon Drive Cycleway Design 20 LMH Reserve 452 100% 20.0 10.0 - - Res. A
Te Awamutu Pedestrian Facilities Construction 2 LMM Reserve 451 100% 190.0 190.0 - - Res. A
Te Rapa - Wintec W&C Investigation 30 LML Reserve 452 100% 50.0 40.0 - - Res. A
Te Rapa - Wintec W&C Design 31 LML Reserve 452 100% 63.0 30.0 33.0 - Res. A
Te Rapa - Wintec W&C Construction 32 LML Reserve 452 100% 2,000.0 - - 2,000.0 Res. A
Transport planning
Greater Hamilton W & C Strategic Study Study Com 002 100% 100.0 97.3 - - N
Hamilton PFR Funding for Annual Plans Study Com 002 100% 95.0 1.2 - - N
SH1/2/29 Inter-regional Strategic Study Study Com 002 100% 628.1 18.5 - - N
Waikato Regional Transportation Model Study Com 002 100% 900.0 65.4 - - N
Activity management plans Study Cat2 003 100% 3,187.5 1,070.2 1,058.7 1,058.7 N
Cambridge to Kaimai (SH1/29) Strategic Study Study 30 HM_ Cat2 002 100% 151.5 50.0 51.5 50.0 N
Inter-Regional freight and passenger routes Study Study 15 HM_ Cat2 002 100% 104.2 61.8 42.4 - N
Safe and sustainable Freight Access Strategic Study Study 31 HM_ Cat2 002 100% 62.4 41.2 21.2 - N
State Highway Travel Demand and Optimisation Strategies Study 16 LM_ Cat2 002 100% 426.3 61.8 233.4 131.1 N
strategic management of inter regional routes study Study 32 HM_ Cat2 002 100% 167.0 92.7 74.3 - N
Waikato Kiwirap Black Routes Study Study 17 MM_ Cat2 002 100% 103.9 72.1 31.8 - N
Waikato Passing and Overtaking Opportunities Study Study 18 MM_ Cat2 002 100% 233.1 51.5 137.9 43.7 N
Waikato State Highway Activity Management Plan review Study - N/F
Waipa District Council
Renewal of local roads
Road renewals Local Roads App. 21,415.8 3,252.5 3,505.4 3,521.7 N
Operation and maintenance of local roads
Road operations and maintenance Local Roads App. 13,202.6 2,153.9 2,075.1 2,121.3 N
New & improved infrastructure for local roads
Waikato Regional Transportation Model Development (WRTM) Study - Com 311 58% 113.0 9.7 - - N
Minor improvements 2009/12 Local Roads App. 341 - 432.5 397.2 395.7 N
Improve, expand or replace network group Group allocation Alloc. - 30.0 240.0
Ngaroto Bridge Replacement Construction - MMM Cat2 322 58% 1,050.0 609.0 - - Possible N
Public transport infrastructure
General access & community benefits PT group Group allocation Alloc. 15.0 15.0 15.0
Te Awamutu Public Transport Interchange (Bus stop) Construction - N/F
Demand management & community programmes Waipa District Council (WDC) Community Programme 2009/2012 Implementation App. 432 75% - 85.8 - - N
Walking and cycling facilities
Walking and Cycling - Access and community benefits Group allocation Alloc. - - -
Waipa District Walking Facilities 2009/12 Construction 1 LML Reserve 451 58% 746.0 139.2 145.0 148.5 Res. A
Crash Reduction Study 09 Study 20 MM_ Cat2 002 75% 100.0 37.5 - 37.5 N
Transportation Activity Management Plan - 2009 Update Study 21 ML_ Cat2 003 58% 650.0 29.0 58.0 - N
Waitomo District Council
Renewal of local roads
Road renewals Local Roads App. 12,667.9 2,373.3 2,478.0 2,496.1 N
Operation and maintenance of local roads
Road operations and maintenance Local Roads App. 11,742.9 2,127.5 2,315.4 2,377.3 N
E/W Minor Events 2008/2009 Construction - Com 141 72% - 280.8 - - N
New & improved infrastructure for local roads
Minor improvements 2009/12 Local Roads App. 341 - 360.1 341.2 341.7 N
Improve, expand or replace network group Group allocation Alloc. - 140.0 -
Te Kuiti Stock Effluent Disposal Facility Construction - MMM Cat2 321 68% 200.0 136.0 - - Possible N
Pio Pio Stock Effluent Disposal Facility Construction - MMM Cat2 321 68% 200.0 - 136.0 - Possible N
Demand management & community programmes
Waitomo / Otorohanga Cluster Community Programmes Implementation App. 432 75% - 66.0 - - N
Walking and cycling facilities
Walking and Cycling - Access and community benefits Group allocation Alloc. - - -
Walking and Cycling Implementation Construction 10 LMM Reserve 451 68% 154.5 34.0 35.0 36.0 Res. A
Transport planning
AMP Review 2011/2012 Study 22 ML_ Cat2 003 68% 50.0 - - 34.0 N
Waitomo District Council Asset Information Gathering Study - N/F
Walking & Cycling Strategy Improvement Study - N/F
Waitomo District Council Asset Information Gathering Study - N/F
Walking & Cycling Strategy Improvement Study - N/F

Return to Waikato regional tables page