Scam alerts: we’ve seen an increase in scam texts and emails claiming to be from us, asking for payments.
Check our example scams or report a scam to us

NZTA App: our mobile app provides a simple and secure way to access your driver licence and vehicle information.
Learn more and download the NZTA app

SH1 St Marks Road on-ramp closed

|

The NZ Transport Agency advises that the SH1 St Marks Road southbound on-ramp will be closed this weekend from 6:30am Saturday 26 until 5am Sunday 27 September. The closure is required to complete a mass concrete pour for the retaining walls on the new on-ramp. A new two-lane on-ramp will open in mid 2010.

The NZ Transport Agency advises that the SH1 St Marks Road southbound on-ramp will be closed this weekend from 6:30am Saturday 26 until 5am Sunday 27 September. The closure is required to complete a mass concrete pour for the retaining walls on the new on-ramp. A new two–lane on-ramp will open in mid 2010.

The on-ramp will eventually connect to the new four-lane southbound motorway bridge, being built as part of Stage 1 of the Newmarket Connection: Viaduct Replacement Project.

Motorists leaving Newmarket to head south onto SH1 are advised to join the motorway at Greenlane via Great South Road. This detour will be clearly signposted.

The NZTA thanks you for your cooperation during this essential work.

For more information please contact:

SH1 Newmarket Connection project office:
T          0508 CONNECT (266 6328)
E          info@nganewmarket.co.nz
W         www.nzta.govt.nz/newmarketconnection(external link)
 

Tags